13 Amendments of Birgit COLLIN-LANGEN related to 2016/0381(COD)
Amendment 44 #
Proposal for a directive
Recital 6
Recital 6
(6) The Union is committed to developing a secure, competitive and decarbonised energy system by 205012. To meet this goal, Member States and investors need milestones to ensure that buildings are decarbonised and that the overall energy efficiency of buildings is increased so that they comply with the most stringent low-energy standard by 2050. In order to ensure this highly energy-efficient, decarbonised building stock by 2050, Member States should identify the intermediary steps and corresponding concrete measures needed to achievinge the mid-term (2030 and 2040) and long-term (2050) objectives. _________________ 12 Communication on an Energy roadmap 2050, (COM(2011) 885 final).
Amendment 52 #
Proposal for a directive
Recital 7
Recital 7
(7) The provisions on long-term renovation strategies provided for in Directive 2012/27/EU of the European Parliament and of the Council13 should be moved to Directive 2010/31/EU, where they fit more coherently. Financing mechanisms and financial incentives should be given a central position in the Member States’ long-term national renovation strategies and be actively promoted by the Member States. Furthermore, a strategy for promoting specialist support and advice for consumers and for training specialists should be included. _________________ 13 Directive 2012/27/EU of the European Parliament and of the Council of 25 October 2012 on energy efficiency, amending Directives 2009/125/EC and 2010/30/EU and repealing Directives 2004/8/EC and 2006/32/EC (OJ L 315, 14.11.2012, p. 1).
Amendment 56 #
Proposal for a directive
Recital 7 a (new)
Recital 7 a (new)
(7 a) Ambitious goals for the deep, gradual renovation of existing building stock will create millions of jobs in the Union, in particular in small and medium-sized enterprises. The construction industry alone directly accounts for 18 million jobs in Europe and generates nine per cent of GDP. Energy efficiency measures in the building industry have the potential to accelerate the modernisation of that sector and its associated workforce. In that context, it is necessary for Member States to provide a clear link between their national long-term renovation strategies and suitable initiatives to promote skills and education in the construction and energy efficiency sectors.
Amendment 111 #
Proposal for a directive
Recital 13
Recital 13
(13) To ensure their best use in building renovation, financial measures related to energy efficiency should be linked to the depth of the renovation, which and should promote a holistic approach to building renovations with a view to securing high energy efficiency, improved indoor climates and improved well-being. Those renovations should be assessed by comparing energy performance certificates (EPCs) issued before and after the renovation or by use of similar appropriate processes.
Amendment 145 #
Proposal for a directive
Recital 18
Recital 18
(18) The provisions of this Directive should not prevent Member States from setting more ambitious energy performance requirements at building level and for building elements, nor should they prevent the Member States from setting more ambitious requirements for indoor climates, as long as such measures are compatible with Union law. It is consistent with the objectives of this Directive and of Directive 2012/27/EC that these requirements may, in certain circumstances, limit the installation or use of products subject to other applicable Union harmonisation legislation, provided that such requirements should not constitute an unjustifiable market barrier.
Amendment 176 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point b
Article 1 – paragraph 1 – point 2 – point b
Directive 2010/31/EU
Article 2a – paragraph 2 – subparagraph 1
Article 2a – paragraph 2 – subparagraph 1
In their long-term renovation strategy referred to in paragraph 1, Member States shall set out a roadmap with clear milestones and measures to deliver on the long-term 2050 goal to decarbonise their national building stock, including technical building systems and in a highly energy-efficient manner, with specific milestones for 2030 and 2040.
Amendment 198 #
Proposal for a directive
Article 1 – paragraph 1 – point 2 – point b (new)
Article 1 – paragraph 1 – point 2 – point b (new)
Directive 2010/31/EU
Article 2a – paragraph 3 – point b a (new)
Article 2a – paragraph 3 – point b a (new)
(b a) to make available accessible and transparent advisory tools, such as single points of contact for consumers which provide information about the structuring and provision of finances for building renovations and support users in taking steps to improve energy efficiency in buildings; and
Amendment 223 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point b
Article 1 – paragraph 1 – point 5 – point b
Directive 2010/31/EU
Article 8 – paragraph 2 – subparagraph 1
Article 8 – paragraph 2 – subparagraph 1
Member States shall ensure that in all new non-residential buildings and in all existing non-residential buildings undergoing major renovation with more than ten parking spaces inside the building or adjacent to the building, where that renovation affects the electrical infrastructure of the building, at least one of every ten is equippfurnished with a recharging pointducting to enable the installation of recharging points for electric cars within the meaning of Directive 2014/94/EU on the deployment of alternative fuels infrastructure, which is capable of starting and stopping charging in reaction to price signals. This requirement shall apply to all non- residential buildings, with more than ten parking spaces, as of 1 January 2025. _________________ 17 OJ. L 307, 28.10.2014, p. 1. OJ. L 307, 28.10.2014, p. 1.
Amendment 238 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point b
Article 1 – paragraph 1 – point 5 – point b
Directive 2010/31/EU
Article 8 – paragraph 3
Article 8 – paragraph 3
3. Member States shall ensure that newly built residential buildings and those undergoing major renovations, with more than ten parking spaces, include the pre- cablside the building or adjacent to the building, where that renovation affects the electrical infrastructure of the building, include the ducting to enable the installation of recharging points for electric vehicles for everyat least half the parking spaces.
Amendment 280 #
Proposal for a directive
Article 1 – paragraph 1 – point 6 – point b
Article 1 – paragraph 1 – point 6 – point b
Directive 2010/31/EU
Article 10 – paragraph 6a
Article 10 – paragraph 6a
6a. When Member States put in place a database for registering EPCs it shall allow tracking the actual energy consumption of the buildings covered, regardless of their size and category. The database shall contain the actual energy consumption data of public buildings with useful floor area of over 250 m² and buildings frequently visited by the public with useful floor area of over 250 m² which shall be regularly updated.
Amendment 312 #
Proposal for a directive
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Directive 2010/31/EU
Article 19
Article 19
9. in Article 19, 2017 is replaced by 20284;
Amendment 322 #
Proposal for a directive
Annex I – paragraph 1 – point 1 – point a
Annex I – paragraph 1 – point 1 – point a
Directive 2010/31/EU
Annex I – point 1 – subparagraph 1
Annex I – point 1 – subparagraph 1
The energy performance of a building is to be determined on the basis of the estimated or actual energy usage for heating, cooling, domestic hot water, ventilation and lighting and shall reflect its typical energy use for heating, cooling, domestic hot water, ventilation and lighting.
Amendment 327 #
Proposal for a directive
Annex I – paragraph 1 – point 1 – point b
Annex I – paragraph 1 – point 1 – point b
Directive 2010/31/EU
Annex I – point 2 – subparagraph 1
Annex I – point 2 – subparagraph 1
The energy needs for space heating, space cooling, domestic hot water and adequate ventilation shall be calculated in order to ensure minimum health, expressed as delivered energy and primary energy, shall be calculated in order to maximise requirements for health, indoor air quality and comfort levels defined by Member States.