16 Amendments of Nils TORVALDS related to 2020/0360(COD)

Amendment 289 #
Proposal for a regulation
Recital 13
(13) The Commission’s communication on energy system integration underlines the need for integrated energy infrastructure planning across energy carriers, infrastructures, and consumption sectors. Such system integration starts from the point of departure of applying the energy efficiency first principle and taking a holistic approach in policy and beyond individual sectors. It also addresses the decarbonisation needs of the hard to abate sectors, such as parts of industry or certain modes of transport, where direct electrification is, currently, technically or economically challenging. Such investments include hydrogen and electrolysers, which are progressing towards commercial large-scale deployment. The Commission’s Hydrogen Strategy gives priority to hydrogen production from renewable electricity, which is the cleanest solution and is most compatible with the EU climate neutrality objective. In a transitional phase however, other forms of low-carbon hydrogen are needed to more rapidly replace existing hydrogen and kick-start an economy of scale.
2021/05/04
Committee: ENVI
Amendment 368 #
Proposal for a regulation
Recital 33
(33) In order to simplify and expedite the permitting process for offshore grids for renewable energy, the Member States around a particular sea basin should endeavour to harmonise the relevant legislation and procedures and create one unique points of contact, referred to as an ‘offshore one-stop shop’, in view of regional specificities and geography, for the for facilitating, integrating and coordinating the process of granting of permits toall permit granting procedures of such projects. Moreover, the establishment of a one-stop shop per sea basin for offshore grids for renewable energy should reduce complexity, increase efficiency and speed up the permitting process of offshore transmission assets often crossing many jurisdictions. It shall issue comprehensive decisions for these projects on behalf of the relevant national Member States in a coordinated, collaborative or integrated manner.
2021/05/04
Committee: ENVI
Amendment 400 #
Proposal for a regulation
Article 1 – paragraph 1
1. This Regulation lays down guidelines for the timely development and interoperability of the priority corridors and areas of trans-European energy infrastructure set out in Annex I (‘energy infrastructure priority corridors and areas’) that contribute to 1.5 degrees goal of the Paris Agreement, the Union’s 2030 climate and energy targets and the climate neutrality objective by 2050as soon as possible and by 2050 at the latest.
2021/05/04
Committee: ENVI
Amendment 404 #
Proposal for a regulation
Article 1 – paragraph 2 – point a
(a) addresses the identification of projects of common interest necessary to implement priority corridors and areas falling under the energy infrastructure categories in electricity, smart gas gridsdistrict heating and cooling, hydrogen, electrolysers, and carbon dioxide set out in Annex II (‘energy infrastructure categories’);
2021/05/04
Committee: ENVI
Amendment 419 #
Proposal for a regulation
Article 2 – paragraph 1 – point 8
(8) ‘smart electricity grid’ means an electricity network where the grid operator can digitally monitor the actions of the users connected to it, and information and communication technologies (ICT) for communicating with related grid operators, generators, energy storage units, consumers and/or prosumers, with a view to transmitting electricity in a sustainable, cost-efficient and secure way;
2021/05/04
Committee: ENVI
Amendment 431 #
Proposal for a regulation
Article 2 – paragraph 1 – point 9 a (new)
(9a) ‘district heating and cooling networks’ means an efficient network in line with the energy efficiency first principle which uses carbon free heat systems, such as geothermal or solar thermal heat, biofuels, or the use of waste heat and cold pursuant to the definition of (EU)2018/2001.
2021/05/04
Committee: ENVI
Amendment 459 #
Proposal for a regulation
Article 3 – paragraph 1 – subparagraph 1
The Commission shall be empowered to, in close dialogue with the European Parliament, adopt delegated acts in accordance with Article 20 supplementing this Regulation concerning the scope and composition of the priority corridors and areas.
2021/05/04
Committee: ENVI
Amendment 470 #
Proposal for a regulation
Article 3 – paragraph 4 – introductory part
4. The Commission shall be empowered to adopt delegated acts in accordance with Article 20 of this Regulation amending annexes to this Regulation, in close dialogue with the European Parliament, in order to establish the Union list of projects of common interest (‘Union list’), subject to the second paragraph of Article 172 of the Treaty on the Functioning of the European Union.
2021/05/04
Committee: ENVI
Amendment 524 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point iii a (new)
(iiia) sector integration, through the improvement of the interaction of different energy vectors or energy sectors, for instance through the increase of synergies in adjacent sectors, such as transport and mobility;
2021/05/04
Committee: ENVI
Amendment 600 #
Proposal for a regulation
Article 5 – paragraph 1 – point a
(a) feasibility and design studies including, as regards, climate mitigation and adaptation and compliance with environmental legislation and with the principle of “do no significant harm”;
2021/05/04
Committee: ENVI
Amendment 621 #
Proposal for a regulation
Article 8 – paragraph 6
6. By [31 July 2022] and for each specific Regional Group per priority offshore grid corridor, as defined in Annex I, national competent authorities in Member States belonging to the respective Group, shall jointly create one unique points of contact per priority offshore grid corridor, ‘offshore one-stop shops’, for project promoters, which shall be. The offshore one-stop shop shall, without prejudice to relevant requirements under international and Union law, facilitate the issuing of the comprehensive decision. The comprehensive decision shall be the final proof that the project of common interest has achieved ready-to-build status and there shall be no other requirements for any additional permits or authorisations in that respect. The comprehensive decision shall be issued within the time limit referred to in Article 10(1) and (2) and in accordance with schemes similar to those laid out in Article 8 Paragraph 3. The offshore one-stop shall be further responsible for facilitating and coordinating the permit granting process for offshore grids for renewable energy projects of common interest, taking into account also the need for coordination between the permitting process for the energy infrastructure and the one for the generation assets. The offshore one-stop shops shall act as a repository of existing sea basin studies and plans, aiming at facilitating the permitting process of individual projects of common interest and coordinate the issuance of the comprehensive decisions for such projects by the relevant national competent authorities. Each Regional Group per priority offshore grid corridor, with the assistance of the national competent authorities in the Members States belonging to the Group, shall set-up the offshore one-stop shops depending on regional specificities and geography and determine their location, resource allocation and specific rules for their functioning.
2021/05/04
Committee: ENVI
Amendment 821 #
Proposal for a regulation
Article 14 – paragraph 3
3. The integrated offshore network development plans shall be compatible with the latest Union-wide ten-Year Network Development Plans in order to ensure coherent development of onshore and offshore grid planning providing for an adequate and reliable transmission grid for transfer of electricity onshore as well as between coastal regions, regions inland, and landlocked Member States and to provide for a stable supply of electricity to centres of consumption or energy storage facilities.
2021/05/04
Committee: ENVI
Amendment 897 #
Proposal for a regulation
Article 22 – paragraph 1 – point h
(h) the effectiveness of this Regulation in contributing to the climate and energy targets for 2030, and, in the longer term, to the achievement of climate neutrality by 2050as soon as possible and by 2050 at the latest as well as to the 1.5 degree goal of the Paris Agreement.
2021/05/04
Committee: ENVI
Amendment 968 #
Proposal for a regulation
Annex I – Part 4 – point 11 – introductory part
(11) Smart electricity grids deployment: adoption of smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources, energy storage, charging infrastructure for electric vehicles and demand response by consumers.
2021/05/04
Committee: ENVI
Amendment 982 #
Proposal for a regulation
Annex I – Part 4 – point 13 a (new)
(13a) District heating and cooling: construction, extension, upgrading and consolidation of district heating and cooling networks using decarbonised supplies of heat and cold, among others geothermal heat and cold and waste heat and cold, while applying the energy efficiency first principle, providing an increased flexibility for the energy system though Power-to-heat. Member states concerned: all
2021/05/04
Committee: ENVI
Amendment 1067 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 a (new)
(5a) concerning district heating and cooling: district heating and cooling systems meeting the following criteria: (a) at least 1000 MW installed capacity for heating or 100 MW installed capacity for cooling, (b) existence of a district heating network for the transport of hot steam or water or a distribution network for the transport of chilled liquids in at least one of the following categories: low cooling temperature (5-25 degrees Celsius), low temperature (30-40 degrees Celsius), average temperature (40-90 degrees Celsius) or high temperature (from 100 degrees Celsius), (c) heat generators producing heat or waste heat that can be injected in the district heating network pursuant to the definition of ‘waste heat and cold’ of (EU) 2018/2001; ‘highly efficient cogeneration of (EU) 2012/27, geothermal energy, heat pumps or bioenergy;
2021/05/04
Committee: ENVI