(17) The Union should facilitate infrastructure projects linking the Union’s energy networks with third-country networks that are mutually beneficial and necessary for the energy transition and the achievement of the climate targets, and which also meet the specific criteria of the relevant infrastructure categories pursuant to this Regulation, in particular with neighbouring countries and with countries with which the Union has established specific energy cooperation. Therefore, this Regulation should include in its scope projects of mutual interest where they are sustainable and able to demonstrate significant net socio-economic benefits for at least two Member States and at least one third country. Such projects would be eligible for inclusion in the Union list upon conditions of regulatory approximation with the Union and upon demonstrating a contribution to the Union’s overall energy and climate objectives in terms of security of supply and decarbonisation. Such regulatory alignment or convergence should be presumed for the European Economic Area or, Energy Community Contracting Parties or third countries within the synchronous area of continental Europe. In addition, the third country with which the Union cooperates in the development of projects of mutual interest should facilitate a similar timeline for accelerated implementation and other policy support measures, as stipulated in this Regulation. Therefore, in this Regulation, projects of mutual interest should be considered in the same manner as projects of common interest with all provisions relative to projects of common interest applying also to projects of mutual interest, unless otherwise specified.
2021/04/22
Committee: ITRE
Amendment 323 #
Proposal for a regulation
Article 4 – paragraph 2 – point a
(a) the project contributes significantly to the decarbonisation objectives of the Union and those of the third country and to sustainability, including through the integration of renewable energy into the grid and the transmission and distribution of renewable generation to major consumption centres and storage sites, and;
2021/04/22
Committee: ITRE
Amendment 431 #
Proposal for a regulation
Article 4 – paragraph 5 – subparagraph 1 – point b a (new)
(b a) synergies with priority corridors and areas identified under trans- European networks for transport and telecommunications;
2021/04/22
Committee: ITRE
Amendment 489 #
Proposal for a regulation
Article 11 – paragraph 1 – introductory part
1. By [16 November 2022], the European Network of Transmission System Operators (ENTSO) for Electricity and the ENTSO for Gas shall publish and submit to Member States, the Commission and the Agency their respective methodologies, including the network and market modelling, for a harmonised energy system-wide cost-benefit analysis at Union level for projects of common interest falling under the categories set out in points (1)(a), (bc), (cd) and (e) and point (3) of Annex II.
2021/04/22
Committee: ITRE
Amendment 541 #
Proposal for a regulation
Article 11 – paragraph 11
11. By [31 December 2023], the ENTSO for Electricity and the ENTSO for Gas shall jointly submit to the Commission and the Agency a consistent and interlinked energy market and network model including electricity, gas, heat and hydrogen transmission infrastructure as well as storage, power plants, LNG and electrolysers, covering the energy infrastructure priority corridors and the areas drawn up in line with the principles laid down in Annex V. Where relevant, the model should take into consideration the distribution infrastructure.
2021/04/22
Committee: ITRE
Amendment 559 #
Proposal for a regulation
Article 12 – paragraph 1 – subparagraph 1
The guidelines shall define standards for a transparent, non-discriminatory and robust elaboration of the scenarios taking into account good practices in the field of network development planning. In particular, the guidelines shall include the energy efficiency first principle and ensure that the underlying ENTSO for Electricity and ENTSO for Gas scenarios are fully in line with the latest medium and long-term European Union decarbonisation targets and the latest available Commission scenarios.
2021/04/22
Committee: ITRE
Amendment 635 #
Proposal for a regulation
Article 14 – paragraph 3
3. The integrated offshore network development plans shall be compatiblepublished together with the latest Union-wide ten- Year Network Development Plans in order to ensure coherent development of onshore and offshore grid planning.
2021/04/22
Committee: ITRE
Amendment 637 #
Proposal for a regulation
Article 14 – paragraph 3 a (new)
3 a. Prior to submitting the draft integrated offshore network development plans to the Commission, the ENTSO for Electricity shall conduct an extensive consultation process involving all relevant electricity stakeholders, including the DSO entity, all offshore sector stakeholders and all the Member States that are part of the priority offshore grid corridors defined in Annex I.
2021/04/22
Committee: ITRE
Amendment 677 #
Proposal for a regulation
Article 16 – paragraph 1
1. The efficiently incurred investment costs, which excludes maintenance costs, related to a project of common interest falling under the categories set out in points (1)(a), (b), (c) and (e) of Annex II and projects of common interest falling under the category set out in point (3) of Annex II, where they fall under the competency of national regulatory authorities, shall be borne by the relevant TSOgrid operators or the project promoters of the transmission or distribution infrastructure of the Member States which the project provides a net positive impact, and, to the extent not covered by congestion rents or other charges, be paid for by network users through tariffs for network access in that or those Member States.
2021/04/22
Committee: ITRE
Amendment 689 #
Proposal for a regulation
Article 16 – paragraph 4 – subparagraph 3
In allocating costs across borders, the relevant national regulatory authorities, in consultation with the TSOgrid operators concerned, shall seek a mutual agreement based on, but not limited to, the information specified in paragraphs 3(a) and (b). Their assessment shall be based on the same scenario as used in consider all relevant scenarios established under Article 12 and other selection process for the elaboration of the Union list where the project of common interests is listedcenarios for network development planning, allowing a robust analysis of the contribution of the project of common interest to the Union energy policy targets of decarbonisation, market integration, competition, sustainability and security of supply.
2021/04/22
Committee: ITRE
Amendment 699 #
Proposal for a regulation
Article 16 – paragraph 6 – subparagraph 3
The assessment of the Agency shall be based on the same scenario as used in consider all relevant scenarios established under Article 12 and other selection process for the elaboration of the Union list where the project of common interest is listedcenarios for network development planning, allowing a robust analysis of the contribution of the project of common interest to the Union energy policy targets of decarbonisation, market integration, competition, sustainability and security of supply.
2021/04/22
Committee: ITRE
Amendment 710 #
Proposal for a regulation
Article 17 – paragraph 2
2. In their decision granting the incentives referred to in paragraph 1, national regulatory authorities shall consider the results of the cost-benefit analysis on the basis of the methodology drawn up pursuant to Article 11 and in particular the regional or Union-wide positive externalities generated by the project. The national regulatory authorities shall further analyse the specific risks incurred by the project promoters, the risk mitigation measures taken and the justification of the risk profile in view of the net positive impact provided by the project, when compared to a lower-risk alternative. Eligible risks shall in particular include risks related to new transmission and distribution technologies, both onshore and offshore, risks related to under-recovery of costs and development risks.
2021/04/22
Committee: ITRE
Amendment 804 #
Proposal for a regulation
Annex I – Part 4 – point 11 – introductory part
(11) Smart electricity grids deployment: adoption of smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and, demand response by consumers, energy storage and other flexibility sources.
2021/04/23
Committee: ITRE
Amendment 834 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point d
(d) systems and components integrating ICT, through operational digital platforms, control systems and sensor technologies both at transmission and medium voltage distribution level, aiming at a more efficient and intelligent electricity transmission and distribution network, increased capacity to integrate new forms of generation, storage, demand response and consumption and facilitating new business models and market structures;
2021/04/23
Committee: ITRE
Amendment 862 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, exincluding pipelines for the local distribution of hydrogen;
2021/04/23
Committee: ITRE
Amendment 963 #
Proposal for a regulation
Annex IV – point 1 – point c
(c) for smart electricity grids, the project is designed for equipment and installations at high-voltage and medium- voltage level. It involves transmission system operators, transmission and distribution system operators or distribution system operators from at least two Member States. Distribution system operators can be involved only with the support of the transmission system operators, of at least two Member States, that are closely associated to the project and ensure interoperabilityone Member State. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 Gigawatthours/year, of which at least 20 % originate from variable renewable resources;
2021/04/23
Committee: ITRE
Amendment 986 #
Proposal for a regulation
Annex IV – point 2 – point a
(a) for projects of mutual interest in the category set out in point (1)(a) and (e) of Annex II, the project increases the grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or more third countries and brings significant benefits, under the specific criteria listed in in Article 4(3), to at least twoone Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Electricity in the frame of Union-wide ten-year network development plan;
2021/04/23
Committee: ITRE
Amendment 990 #
Proposal for a regulation
Annex IV – point 2 – point b
(b) for projects of mutual interest in the category set out in point (3) of Annex II, the hydrogen project enables the transmission of hydrogen across at the border of a Member State with one or more third countries and proves bringing significant benefits, under the specific criteria listed in in Article 4(3), to at least twoone Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Gas in the frame of Union-wide ten- year network development plan;
2021/04/23
Committee: ITRE
Amendment 995 #
Proposal for a regulation
Annex IV – point 2 – point c
(c) for projects of mutual interest in the category set out in point (5) of Annex II, the project can be used to transport anthropogenic carbon dioxide by at least twoone Member States and a third country.