5 Amendments of Norbert GLANTE related to 2008/0013(COD)
Amendment 124 #
Proposal for a directive – amending act
Recital 16
Recital 16
(16) Consequently, full auctioning should be the rule from 2013 onwards for the power sector, taking into account their ability to pass on the increased cost of CO2, and – with the exception of at least 12 demonstration plants – no free allocation should be given for carbon capture and storage as the incentive for this arises from allowances not being required to be surrendered in respect of emissions which are stored. Electricity generators may receive free allowances for heat produced through high efficiency cogeneration as defined by Directive 2004/8/EC in the event that such heat produced by installations in other sectors were to be given free allocations, in order to avoid distortions of competition.
Amendment 403 #
Proposal for a directive – amending act
Article 1 – point 8
Article 1 – point 8
Directive 2003/87/EC
Article 10a – paragraph 1 – subparagraph 3
Article 10a – paragraph 1 – subparagraph 3
The measures referred to in the first subparagraph shall, to the extent feasible, ensure that allocation takes place in a manner that gives incentives for greenhouse gas and energy efficient techniques and for reductions in emissions, by taking account of the most efficient techniques, substitutes, alternative production processes, use of biomass and greenhouse gas capture and storage, and shall not give incentives to increase emissions. No free allocation shall be made in respect of any electricity production. An exception to this shall be a minimum of 12 CCS demonstration plants of at least 200 MW selected by the Commission, to cover all CCS technologies in combination with the various sources of energy, storage and transport options.
Amendment 456 #
Proposal for a directive – amending act
Article 1 – point 8
Article 1 – point 8
Directive 2003/87/EC
Article 10a – paragraph 3
Article 10a – paragraph 3
3. Free allocation mayshould be given to electricity generators in respect of the production of heat through high efficiency cogeneration as defined by Directive 2004/8/EC for economically justifiable demand to ensure equal treatment with regard to other producers of heat. In each year subsequent to 2013, the total allocation to such installations in respect of the production of that heat shall be adjusted by the linear factor referred to in Article 9.
Amendment 460 #
Proposal for a directive – amending act
Article 1 – point 8
Article 1 – point 8
Directive 2003/87/EC
Article 10a – paragraph 3
Article 10a – paragraph 3
3. Free allocation may be given to electricity generators in respect of the production of heat through high efficiency cogeneration as defined by Directive 2004/8/EC for economically justifiable demand to ensure equal treatment with regard to other producers of heat. In each year subsequent to 2013, the total allocation to such installations in respect of the production of that heat shall be adjusted by the linear factor referred to in Article 9. Free allocation will also be given to at least 12 CCS demonstration plants selected by the Commission which conform to the criteria detailed in paragraph 1.
Amendment 502 #
Proposal for a directive – amending act
Article 1 – point 8
Article 1 – point 8
Directive 2003/87/EC
Article 10a – paragraph 6a (new)
Article 10a – paragraph 6a (new)