29 Amendments of Isabella TOVAGLIERI related to 2023/0077(COD)
Amendment 294 #
Proposal for a regulation
Recital 37
Recital 37
(37) The accelerated deployment of renewables necessitates a growing availability of flexibility solutions to ensure their integration to the grid and to enable the electricity system and grid to adjust to the variability of electricity generation and consumption across different time horizons. Regulatory authoritiMember States should periodically assess the need for flexibility in the electricity system based on the input of transmission and distribution system operators. The assessment of the flexibility needs of the electricity system should take into account all existing and planned investments (including existing assets that are not yet connected to the grid) on sources of flexibility such as flexible electricity generation, interconnectors, demand side response, energy storage or the production of renewable fuels, in view of the need to decarbonise the energy system. On this basis, Member States should define a national objective for non-fossil flexibility such as demand side response and storage which should also be reflected in their integrated national energy and climate plans.
Amendment 305 #
Proposal for a regulation
Recital 38
Recital 38
(38) To achievecontribute to the achievement of the national objective for non-fossil flexibility such as demand side response and storage investment needs, Member States can design or redesign capacity mechanisms in order to create a green and flexible capacity mechanism., Member States that apply a capacity mechanism in line with the existing rules should consider promoteing the participation of non-fossil flexibility such as demand side response and energy storage by introducing additional criteria or features in the designin accordance with their expected contribution to addressing adequacy concerns, and provided that the effectiveness of the capacity mechanism is not undermined.
Amendment 308 #
Proposal for a regulation
Recital 39
Recital 39
Amendment 314 #
Proposal for a regulation
Recital 40
Recital 40
(40) In addition, if Member States do not apply a capacity mechanism or if the additional criteria or features in the design of their capacity mechanism are insufficientto achieve national objective for demand response and energy storage investment needs, Member States could apply flexibility support schemes consisting of payments for the available capacity of non-fossil flexibility such as demand side response and storage. The energy crisis has demonstrated the need for flexible back-up generation, a need which is more acute with an increasing share of renewables in the electricity mix or when the level of interconnections in a Member State is not sufficiently developed. Therefore, in order to fachieve national objective for demand response and storage investment needs they could apply flexibility support schemes consisting of payments for the available capacity of non- fossil flexibility such as demand side response and storageilitate the integration of an increasing share of renewable generation into the electricity system, capacity mechanisms and flexibility support schemes should be considered as a possible structural element of national markets where this is determined following an assessment of system needs.
Amendment 431 #
Proposal for a regulation
Article 1 – paragraph 1 – point 3 – point a
Article 1 – paragraph 1 – point 3 – point a
Regulation (EU) 2019/943
Article 7 – paragraph 1
Article 7 – paragraph 1
1. Transmission system operators and NEMOs, or an entity designated by them, shall jointly organise the management of the integrated day-ahead and intraday markets in accordance with Regulation (EU) 2015/1222. Transmission system operators and NEMOs shall cooperate at Union level or, where more appropriate, at a regional level in order to maximise the efficiency and effectiveness of Union electricity day-ahead and intraday trading. The obligation to cooperate shall be without prejudice to the application of Union competition law. In their functions relating to electricity trading, transmission system operators and NEMOs shall be subject to regulatory oversight by the regulatory authorities pursuant to Article 59 of Directive (EU) 2019/944 and ACER pursuant to Articles 4 and 8 of Regulation (EU) 2019/942.
Amendment 439 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation (EU) 2019/943
Article 7a
Article 7a
Amendment 443 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation (EU) 2019/943
Article 7a
Article 7a
Amendment 447 #
Amendment 458 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 463 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 467 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 472 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 475 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 478 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 479 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 483 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 487 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 494 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Article 1 – paragraph 1 – point 4
Regulation 2019/943
Article 1(4)
Article 1(4)
Amendment 528 #
Proposal for a regulation
Article 1 – paragraph 1 – point 5 – point a
Article 1 – paragraph 1 – point 5 – point a
Regulation 2019/943
Article 8
Article 8
NEMOs shall allow market participants to trade energy as close to real time as possible and at least up to the intraday cross-zonal gate closure time. By 1 January 2028, the intraday cross-zonal gate closure time shall be at the earliest 30 minutes ahead of real time.
Amendment 891 #
Amendment 905 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 19
Article 19
Based on the report of the regulatory authoritylevant bodies identified by Member States, pursuant to Article 19c(1), each Member State shall define an indicativseparate quantifiable national objectives for demand side response and storage. This indicativenergy storage based on available capacity and develop a plan for delivering these objectives. These national objectives shall also be reflected in Member States’ integrated national energy and climate plans as regards the dimension ‘Internal Energy Market’ in accordance with Articles 3, 4 and 7 of Regulation (EU) 2018/1999 and in their integrated biennial progress reports in accordance with Article 17 of Regulation (EU) 2018/1999.
Amendment 915 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 1(9)
Article 1(9)
1. Member States which apply a capacity mechanism in accordance with Article 21 shallmay consider the promotion of the participation of non-fossil flexibility such as demand side response and storage by introducand energy storage ing additional criteria or features in the designccordance with their expected contribution to addressing adequacy concerns, and provided that the effectiveness of the capacity mechanism is not undermined.
Amendment 931 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 19
Article 19
2. Where the measures introduced in accordance with paragraph 1 to promote the participation of non-fossil flexibility such as demand response and storage in capacity mechanisms are insufficient to achieve the flexibility needs identifiedTo achieve the flexibility needs identified in accordance with19d, Member States that apply a capacity mechanism in accordance with19d, Member States Article 21 may also apply flexibility support schemes consisting of payments for the available capacity of non- fossil flexibility such as demand side response and storage.
Amendment 933 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 19
Article 19
2. Where the measures introduced in accordance with paragraph 1 to promote the participation of non-fossil flexibility such as demand response and storage in capacity mechanisms are insufficient to achieve the flexibility needs identified in accordance with19d, Member States mayTo achieve the flexibility needs identified in accordance with19d, Member States which apply a capacity mechanism in accordance with article 21 of Regulation 2019/943 may also apply flexibility support schemes consisting of payments for the available capacity of non- fossil flexibility such as demand side response and energy storage.
Amendment 980 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 19
Article 19
(b) be limited to new investments in non-fossil flexibility such as demand side response and energy storage;
Amendment 981 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 19
Article 19
(ba) take into consideration locational criteria to ensure that investments in new capacity take place in optimal locations and that they do not create or worsen congestion in the grid;
Amendment 990 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 19
Article 19
(g) set out a minimum level of participation in the market in terms of activated energy, which takes into account the technical specificities of energy storage and demand response assets;
Amendment 995 #
Proposal for a regulation
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Regulation (EU) 2019/943
Article 19
Article 19
(i) where technically feasible, be open to cross-border participation.’;
Amendment 1028 #
(b) , capacity-allocation and congestion- management rules pursuant to Article 6 of Directive (EU) 2019/944 and Articles 7 to 10, 13 to 17, 19 and 35 to 37 of this Regulation, including rules on day- ahead, intraday and forward capacity calculation methodologies and processes, grid models, bidding zone configuration, redispatching and countertrading, trading algorithms, single day-ahead and intraday coupling including the possibility of being operated by a single entity, the firmness of allocated cross- zonal capacity, congestion income distribution, the allocation of financial long-term transmission rights by the single allocation platform, cross-zonal transmission risk hedging, nomination procedures, and capacity allocation and congestion management cost recovery;;