7 Amendments of Pietro FIOCCHI related to 2023/0077(COD)

Amendment 309 #
Proposal for a regulation
Recital 39
(39) To support environmental protection objectives the CO2 emissions’ limit, set out in Article 22(4) of Regulation (EU) 2019/943 of the European Parliament and of the Council, should be seen as an upper limit. Therefore, Member States could set technical performance standards and CO2 emissions’ limits that restrict participation in capacity mechanisms to flexible, fossil-free technologies in full alignment with the Guidelines on State aid for climate, environmental protection and energy27which encourage Member States to introduce green criteria in capacity mechanisms. _________________ 27 Communication from the Commission – Guidelines on State aid for climate, environmental protection and energy 2022 (OJ C 80, 18.2.2022, p. 1).deleted
2023/05/25
Committee: ITRE
Amendment 435 #
Proposal for a regulation
Article 1 – paragraph 1 – point 3 – point a
Regulation (EU) 2019/943
Article 7 – paragraph 1
1. Transmission system operators and NEMOs, or an entity designated by them, shall jointly organise the management of the integrated day-ahead and intraday markets in accordance with Regulation (EU) 2015/1222. Transmission system operators and NEMOs shall cooperate at Union level or, where more appropriate, at a regional level in order to maximise the efficiency and effectiveness of Union electricity day-ahead and intraday trading. The obligation to cooperate shall be without prejudice to the application of Union competition law. In their functions relating to electricity trading, transmission system operators and NEMOs shall be subject to regulatory oversight by the regulatory authorities pursuant to Article 59 of Directive (EU) 2019/944 and ACER pursuant to Articles 4 and 8 of Regulation (EU) 2019/942. (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) Or. en (Article 1 - paragraph 3 a)
2023/05/25
Committee: ITRE
Amendment 445 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4
Regulation (EU) 2019/943
Article 7a
1. Without prejudice to Article 40(5) and 40(6) of the Electricity Directive, transmission system operators may procure peak shaving products in order to achieve a reduction of electricity demand during peak hours. deleted (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) Or. en (Article 1 (4) : new Article 7a)
2023/05/25
Committee: ITRE
Amendment 455 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4

Article 1 (4): newe Article 7a

Article 1 (4): newe Article 7a
2. Transmission system operators seeking to procure a peak shaving product shall submit a proposal setting out the dimensioning and conditions for the procurement of the peak shaving product to the regulatory authority of the Member State concerned. The proposal of the transmission system operator shall comply with the following requirements: (a) the dimensioning of the peak shaving product shall be based on an analysis of the need for an additional service to ensure security of supply. The analysis shall take into account a reliability standard or objective and transparent grid stability criteria approved by the regulatory authority. The dimensioning shall take into accdeleted (This amendment applies throughount the forecast of demand, the forecast of electricity generated from renewable energy sources and the forecast of other sources of flexibility in the system. The dimensioning of the peak shaving product shall be limited to ensure that the expected benefits of the product do not exceed the forecasted costs; (b) the procurement of a peak shaving product shall be based on objective, transparent, non-discriminatory criteria and be limited to demand response; (c) the procurement of the peak shaving product shall take place using a competitive bidding process, with selection based on the lowest cost of meeting pre- defined technical and environmental criteria; (d) contracts for a peak shaving product shall not be concluded more than two days before its activation and the contracting period shall be no longer than one day; (e) the activation of the peak shaving product shall not reduce cross-zonal capacity; (f) the activation of the peak shaving product shall take place after the closure of the day-ahead market and before the start of the balancing market; (g) the peak shaving product shall not imply starting generation located behind the metering point. text. Adopting it will necessitate corresponding changes throughout.) Or. en (Article 1 (4): newe Article 7a)
2023/05/25
Committee: ITRE
Amendment 489 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4

Article 1 (4) : new Article 7a

Article 1 (4) : new Article 7a
3. The actual reduction of consumption resulting from the activation of a peak shaving product shall be measured against a baseline, reflecting the expected electricity consumption without the activation of the peak shaving product. Transmission system operators shall develop a baseline methodology in consultation with market participants and submit it to the regulatory authority. deleted (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) Or. en (Article 1 (4) : new Article 7a)
2023/05/25
Committee: ITRE
Amendment 496 #
Proposal for a regulation
Article 1 – paragraph 1 – point 4

Article 1 (4): newe Article 7a

Article 1 (4): newe Article 7a
4. Regulatory authorities shall approve the proposal of the transmission system operators seeking to procure a peak shaving product and the baseline methodology submitted in accordance with paragraphs 2 and 3 or shall request the transmission system operators to amend the proposal where it does not meet the requirements set out in these paragraphs. (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) Or. en (Article 1 (4): newe Article 7a)
2023/05/25
Committee: ITRE
Amendment 1024 #
Proposal for a regulation
Article 1 – paragraph 1 – point 13 Regulation (EU) 2019/943
(b) b), capacity-allocation and congestion- management rules pursuant to Article 6 of Directive (EU) 2019/944 and Articles 7 to 10, 13 to 17, 19 and 35 to 37 of this Regulation, including rules on day- ahead, intraday and forward capacity calculation methodologies and processes, grid models, bidding zone configuration, redispatching and countertrading, trading algorithms, single day- ahead and intraday coupling including the possibility of being operated by a single entity, the firmness of allocated cross- zonal capacity, congestion income distribution, the allocation of financial long-term transmission rights by the single allocation platform, cross-zonal transmission risk hedging, nomination procedures, and capacity allocation and congestion management cost recovery;; ” (This amendment applies throughout the text. Adopting it will necessitate corresponding changes throughout.) Or. en (Article 1 - paragraph 13)
2023/05/25
Committee: ITRE