BETA

115 Amendments of Margarida MARQUES related to 2012/0060(COD)

Amendment 104 #
Proposal for a regulation
Title 1
Amended proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the access of third-country economic operators, goods and services to the Union’s internal market in public procurement market and procedures supporting negotiations on access of Union economic operators, goods and services to the public procurement markets of third countries
2021/10/18
Committee: INTA
Amendment 108 #
Proposal for a regulation
Recital 5
(5) The revised plurilateral WTO Agreement on Government Procurement provides only for limited market access for Union companies to the public procurement markets of third countries and applies only to a limited number of WTO Members, which are parties to that Agreement. The revised Agreement on Government Procurement was concluded by the Union in December 2013.deleted
2021/10/18
Committee: INTA
Amendment 111 #
(6) Within the context of the WTO and through its bilateral relations, the Union advocates an ambitious opening of international public procurement markets of the Union and its trading partners, in a spirit of reciprocity and mutual benefit.
2021/10/18
Committee: INTA
Amendment 114 #
Proposal for a regulation
Recital 6 a (new)
(6a) The plurilateral WTO Agreement on Government Procurement and EU trade agreements that include provisions on procurement provide for market access for Union economic operators only to the procurement markets of third countries that are parties to these agreements.
2021/10/18
Committee: INTA
Amendment 117 #
Proposal for a regulation
Recital 7
(7) If thea third country concerned is a Party to the WTO Agreement on Government Procurement or has concluded a trade agreement with the EU that includes provisions on public procurement, the Commission should follow the consultation mechanisms and/or dispute settlement procedures set out in thatose agreements when the restrictive practices relate to procurement covered by market access commitments undertaken by the country concernedat third country towards the Union.
2021/10/18
Committee: INTA
Amendment 121 #
(8) Many third countries are reluctant to open their public procurement and their concessions markets to international competition, or to open those markets further than what they have already done. As a result, Union economic operators face restrictive procurement practices in many of the trading partners of the Union. Those restrictive procurement practices result in the loss of substantial trading opportunities.
2021/10/18
Committee: INTA
Amendment 125 #
Proposal for a regulation
Recital 10
(10) Regulation (EU) No 654/2014 of the European Parliament and of the Council174 lays down rules and procedures in order to ensure the exercise of the Union's rights under international trade agreements concluded by the Union. No such rules and procedures exist for the treatment of economic operators, goods and services not covered by such international agreements. _________________ 174 Regulation (EU) No 654/2014 of the European Parliament and of the Council of 15 May 2014 concerning the exercise of the Union's rights for the application and enforcement of international trade rules and amending Council Regulation (EC) No 3286/94 laying down Community procedures in the field of common commercial policy in order to ensure the exercise of the Community’s rights under international trade rules, in particular those established under the auspices of the World Trade Organization (OJ L 189, 27.6.2014, p. 50.)
2021/10/18
Committee: INTA
Amendment 130 #
Proposal for a regulation
Recital 11
(11) In the interest of legal certainty for Union and third-country economic operators, contracting authorities and contracting entiternational market access commitments undertaken by the Union towards third countries in the field of procurement and concessions require, inter alia, the equal treatment of economic operators from those countries. Consequently, measures adopted under this Regulation can only apply to economic operators, goods or services from countries that are not parties to the plurilateral WTO Agreement on Government Procurement or to bilateral or multilateral trade agreements with the Union that include commitments on access to procurement and concessions markets, or from countries that are parties, the international market access commitments undertaken by the Union towardso such agreements but only regarding procurement procedures for goods, services or concessions that are not covered by those agreements. Irrespective of the application of measures adopted under this Regulation, and in accordance with the Communication from the Commission of 24 July 2019 on ‘Guidance on the participation of third- countries in the field of public procurement and concessions should be reflected in the legal order of the EU, thy bidders and goods in the EU procurement market’ and with Directives 2014/23/EU, 2014/24/EU and 2014/25/EU of the European Parliament and of the Council, economic operators from third countries which do not have any agreement providing for the opening of the Union’s procurement market or whose goods, services and works are not covered by ensuring effective application thereof. such an agreement, do not have secured access to procurement procedures in the Union and could be excluded.
2021/10/18
Committee: INTA
Amendment 136 #
Proposal for a regulation
Recital 12
(12) The objeffectives of application of any measure adopted under this Regulation with a view to improving the access of Union economic operators to the public procurement and concessions markets of certain third countries protected by restrictive and discriminatory procurement measures or practices and of preserving equal conditions of competition within the internal market require to refer to the non-preferential rules of origin established in the EU customs legislation, so that contracting authorities and contracting entities know whether goods and services are covered by the international commitments of the Unionrequires a clear set of rules of origin for economic operators, goods and services.
2021/10/18
Committee: INTA
Amendment 138 #
Proposal for a regulation
Recital 13
(13) The origin of a good should be determined in accordance with Article 22s 59 to 262 of Council Regulation (EECU) No 2913/199218 952/20135 of the European Parliament and of the Council. _________________ 18Council 5Regulation (EECU) No 2913/1992 of 12 October 1992 establishing the Community952/2013 of the European Parliament and of the Council of 9 October 2013 laying down the Union Customs Code (OJ L 302, 9.10.1992269, 10.10.2013, p. 1)
2021/10/18
Committee: INTA
Amendment 140 #
(14) The origin of a service should be determined on the basis of the origin of the natural or legal person providing it. The origin of a legal person should be considered to be the country under the laws of which a legal person is constituted or organised and in the territory of which the legal person is engaged in substantive business operations. The criterion of substantive business operations should not allow the potential circumvention of any measure adopted under this Regulation by the creation of letterbox companies. The term ‘substantive business operations’ is a concept used in the WTO General Agreement on Trade in Services. In Union law it is equivalent to the term ‘effective and continuous link with the economy’ and is closely linked to the right of establishment set out in Article 49 of the Treaty on the Functioning of the European Union. The Commission regularly publishes guidelines based on the case law related to the right of establishment, addressing, inter alia, the concept of effective or stable and continuous link with the economy. Article 86 of Directive 2014/25/EU also refers to the concept of “direct and effective link with the economy” which is equivalent to the concept of ‘substantive business operations’.
2021/10/18
Committee: INTA
Amendment 142 #
Proposal for a regulation
Recital 15
(15) In the light of the overall policy objective of the Union to support the economic growth of developing countries and their integration into the global value chain, which is the basis for the establishment by the Union of a generalised system of preferences as outlined in Regulation (EU) No 978/2012 of the European Parliament and of the Council19 , this Regulation should not apply to tenders where more than 50% of the total value of the tender is made up of goods and services originating, in accordance with the Union’s non- preferential rules of origin, in least- developed countries benefitting from the "Everything But Arms" arrangement or in developing countries considered to be vulnerable due to a lack of diversification and insufficient integration within the international trading system as defined respectively in Annexes IV and VII to Regulation (EU) No 978/2012. _________________ 19Regulation (EU) No 978/2012 of the European Parliament and of the Council of 25 October 2012 applying a scheme of generalised tariff preferences and repealing Council Regulation (EC) No 732/2008 (OJ L 303, 31.10.2012, p. 1).deleted
2021/10/18
Committee: INTA
Amendment 147 #
Proposal for a regulation
Recital 16
(16) In the light of the overall policy objective of the Union to support small and medium-sized enterprises, this Regulation should also not apply to tenders submitted by SMEs established in the Union and in engaged in substantive business operations entailing a direct and effective link with the economy of at least one Member State.deleted
2021/10/18
Committee: INTA
Amendment 158 #
Proposal for a regulation
Recital 17
(17) When assessing whether restrictive and/or discriminatory procurement measures or practices exist in a third countryspecific measures or practices exist in a third country that could result in the impairment of access of Union goods, services or economic operators to the procurement or concession markets, the Commission should examine to what degree laws on public, rules or other measures on procurement and concessions of the country concerned ensure transparency in line with international standards in the field of public procurement, and do not result in serious and preclude any discriminaurring restrictions against Union goods, services andor economic operators. In addition, it should examine to what degree individual contracting authorities or contracting entities maintain or adopt discriminatoryrestrictive practices against Union goods, services andor economic operators.
2021/10/18
Committee: INTA
Amendment 167 #
Proposal for a regulation
Recital 19
(19) The Commission should be able, on its own initiative or at the application of interested parties or a Member State, to initiate at any time an investigation into restrictive procurement measures or practices allegedly adopted or maintained by a third country. . Such investigative procedures should be without prejudice to Regulation (EU) No 654/2014 of the European Parliament and of the Council , if it considers that such an investigation is in the interest of the Union.
2021/10/18
Committee: INTA
Amendment 172 #
Proposal for a regulation
Recital 19 a (new)
(19a) The determination whether an investigation is in the interest of the Union should be based on an appreciation of all the various interests taken as a whole, including the interests of the domestic industry, users, consumers, workers and social partners. The Commission is in any case responsible of determining the interest of the Union, and should weigh up the consequences of starting an investigation against its impact, and the potential measures that could be adopted under this Regulation on EU’s broader interests. The general objective of opening third-country markets and improving market access opportunities for Union economic operators should be taken into account. The objective of limiting any unnecessary administrative burden for contracting authorities and contracting entities as well as economic operators should also be taken into account.
2021/10/18
Committee: INTA
Amendment 176 #
Proposal for a regulation
Recital 19 b (new)
(19b) Given the overall policy objective of the Union to support the economic growth of least developed countries (LDCs) and their integration into global value chains, it would not be in the Union’s interest to start an investigation against such countries under this Regulation, unless there are reasonable indications of circumvention of any adopted IPI measures. Consequently, this Regulation is not intended to apply to LDCs benefitting from the "Everything But Arms" arrangement as defined in Regulation (EU) No 978/2012.
2021/10/18
Committee: INTA
Amendment 183 #
Proposal for a regulation
Recital 20
(20) If the existence of a restrictive and/or discriminatory procurement measure or practice in a third country is confirmedWhen conducting the investigation, the Commission should invite the third country concerned to enter into consultations with a view to eliminating any restrictive measures or practices and improving the tendering opportunities for Union economic operators, goods and services in respect of public procurementregarding procurement and concessions markets in that country.
2021/10/18
Committee: INTA
Amendment 185 #
Proposal for a regulation
Recital 22
(22) If the investigation confirms the existence of restrictive measures or practices and the consultations with the country concerned do not lead to sufficient satisfactory corrective actions that result in improvements to the tendering opportunities for Union economic operators, goods and services within a reasonable timeframe, the Commission, where appropriate, should be able to adopt, where appropriate, price adjustment measure applying to tenders submitted by economic operators originating in that country and/or including goods and services originating in that country under this Regulation measures (‘IPI measures’) in the form of a score adjustment or of exclusion of tenders.
2021/10/18
Committee: INTA
Amendment 193 #
Proposal for a regulation
Recital 23
(23) SuchA score adjustment measures should be applied only for the purpose of the evaluation of tenders comprising goods or servicesubmitted by economic operators originating in the country concerned. To avoid circumvention of those measures, it may also be necessary to target certain foreign-controlled or owned legal persons that, although established in the European Union, are not engaged in substantive business operations that have a direct and effective link withIt should not affect the price actually due to be paid under the economy of at least one Member State . Appropriate measures should not be disproportionate to the restrictive procurement practices to which they respondtract to be concluded with the successful tenderer.
2021/10/18
Committee: INTA
Amendment 197 #
Proposal for a regulation
Recital 23 a (new)
(23a) IPI measures should apply to procurement procedures falling under the scope of this Regulation, including framework agreements and dynamic purchasing systems. IPI measures should also apply in the case of specific contracts awarded under a dynamic purchasing system, when those dynamic purchasing systems were subject to an IPI measure. However, they should not apply to such contracts below a certain threshold with a view to limiting the overall administrative burden for contracting authorities and contracting entities. In order to avoid a possible double application of IPI measures, such measures should not apply to contracts awarded based on a framework agreement, once they have already been applied at the stage of concluding that framework agreement.
2021/10/18
Committee: INTA
Amendment 200 #
Proposal for a regulation
Recital 23 b (new)
(23b) In the light of the overall policy objective of the Union to support small and medium-sized enterprises (SMEs), the Commission and contracting authorities and contracting entities should duly consider the effects of this Regulation, with a view to preventing an overburdening of SMEs. The Commission in cooperation with the Member States should make available guidelines for best practices to achieve this objective, in order to ensure the efficiency of this Regulation and the consistency of its implementation.
2021/10/18
Committee: INTA
Amendment 202 #
Proposal for a regulation
Recital 23 c (new)
(23c) To avoid possible circumvention of an IPI measure, it will also be necessary to impose additional contractual obligations on any successful tenderer. Those obligations should apply only in case of procurement procedures to which an IPI measure is applicable, as well as to contracts awarded based on a framework agreement where such contracts are equal or above a certain threshold and when that framework agreement was subject to an IPI measure.
2021/10/18
Committee: INTA
Amendment 205 #
Proposal for a regulation
Recital 24
(24) Price adjustment measures should not have a negative impact on on-going trade negotiations with the country concerned. Therefore, where a country is engaging in substantive negotiations with the Union concerning market access in the field of public procurement, the Commission may suspend the measures during the negotiations.deleted
2021/10/18
Committee: INTA
Amendment 213 #
Proposal for a regulation
Recital 25
(25) In order to simplify the application of a price adjustment measure by contracting authorities or contracting entities, there should be a presumption that all economic operators originating in a targeted third country with which there is no agreement on procurement will be subject to the measure, unless they can demonstrate that less than 50% of the total value of their tender is made up of goods or services originating in the third country concerned.deleted
2021/10/18
Committee: INTA
Amendment 217 #
Proposal for a regulation
Recital 26
(26) Member States are best placed to identify the contracting authorities or contracting entities, or categories of contracting authorities or contracting entities, which should apply the price adjustment measure. To ensure that an appropriate level of action is taken and that a fair distribution of the burden among Member States is achieved, the Commission should take the final decision, based on a list submitted by each Member State. Where necessary, the Commission may establish a list on its own initiative.deleted
2021/10/18
Committee: INTA
Amendment 225 #
Proposal for a regulation
Recital 27
(27) It is imperative that contracting authorities and contracting entities have access to a range of high-quality products meeting their purchasing requirements at a competitive price. Therefore contracting authorities and contracting entities should be able not to apply price adjustment, on an exceptional basis, not to apply IPI measures limiting access of non- covered goods and services in casef there are no Union and/or covered goods or services available which meet the requirements of the contracting authority or contracting entity or where such action relates to safeguarding essential public policy needs, for example in the fields of health andregarding public safeecurity, or where the application of the measure would lead to a disproportionate increase in the price or costs of the contractpublic health emergencies.
2021/10/18
Committee: INTA
Amendment 229 #
Proposal for a regulation
Recital 28
(28) In case of misapplication of IPI measures by contracting authorities or contracting entities of exceptions to price adjustment measures limiting access of non-covered goods and services, the Commission should be able to apply the corrective mechanism of Article 3 of, which negatively affects the chances to participate in the procurement procedure of economic operators having such a right, Council Directives 89/665/EEC20 or Article 8 of Council Directive 92/13/EEC21 . In addition, contracts concluded with an economic operator by contracting authorities or contracting entiti and 92/13/EEC should be applicable. The affected economic operator could therefore initiate a review procedure according to the national law implementing these Directives, in violation of price adjustment measures limiting access of non-covered goods and services should be ineffectivef, for example, a competing economic operator should have been excluded. The Commission should also be able to apply the corrective mechanism according to Article 3 of Council Directive 89/665/EEC19 or Article 8 of Council Directive 92/13/EEC20. _________________ 2019Council Directive 89/665/EEC on the coordination of the laws, regulations and administrative provisions relating to the application of review procedures to the award of public supply and public works contracts (OJ L 395, 30.12.1989, p. 33). 2120Council Directive 92/13/EEC coordinating the laws, regulations and administrative provisions relating to the application of Community rules on the procurement procedures of entities operating in the water, energy, transport and telecommunications sectors (OJ L 76, 23.3.1992, p. 14).
2021/10/18
Committee: INTA
Amendment 233 #
Proposal for a regulation
Recital 30
(30) The examination procedure should be used for the adoption of implementing acts regarding the adoption, withdrawal, or suspension or reinstatement of a the price adjustment measuren IPI measure and the Commission should be assisted by the Committee set up under the Trade Barriers Regulation. If necessary and for matters affecting the Union’s legal framework on public procurement, the Commission may also seek the advice of the Advisory Committee on Public Procurement established by Council Decision 71/306/EEC.
2021/10/18
Committee: INTA
Amendment 235 #
Proposal for a regulation
Recital 30 a (new)
(30a) Information received pursuant to this Regulation should only be used for the purpose for which it was requested and with due respect to the applicable Union and national data protection and confidentiality requirements. Regulation (EC) No 1049/2001 as well as Article 28 of Directive 2014/23/EU, Article 21 of Directive 2014/24/EU and Article 39 of Directive 2014/25/EU, should apply accordingly.
2021/10/18
Committee: INTA
Amendment 238 #
Proposal for a regulation
Recital 32
(32) Regular reporting by the Commission should make it possible to monitor the applicaIn line with the Interinstitutional Agreement of 13 April 2016 on Better Law-Making9a and with a view, inter alia, to reduce administrative burdens, in particular on Member States, the Commission should regularly review the scope, functioning and efficiency of the procedures established by this Regulationis Regulation. The Commission should report on its assessment to the European Parliament and the Council. The review may be followed up by appropriate legislative proposals.
2021/10/18
Committee: INTA
Amendment 241 #
Proposal for a regulation
Recital 33
(33) In accordance with the principle of proportionality, it is necessary and appropriate for achievement of the basic objective of establishing a common external policy in the field of public procurement to lay down common rules on the treatment of tenders which include goods and services not covered by the international commitments of the Union. This Regulation does not go beyond what is necessary in order to achieve the objectives pursued, in accordance with the fourth paragraph of Article 5 of the Treaty on European Union,deleted
2021/10/18
Committee: INTA
Amendment 242 #
Proposal for a regulation
Recital 33 a (new)
(33a) It is also imperative that, in view of an appropriate integration of environmental, social and labour requirements, Member States take relevant measures to ensure compliance with obligations in the fields of environmental, social and labour law that apply at the place where the works are executed and result from international obligations, laws, regulations, decrees and decisions, at both national and Union level, as well as from collective agreements.
2021/10/18
Committee: INTA
Amendment 244 #
Proposal for a regulation
Article 1 – paragraph 1 – subparagraph 1
This Regulation establishes measures intended to improve the access of Union economic operators, goods and services to the public procurement and concessions markets of third countries, in respect of non-covered procurement. It lays down procedures for the Commission to undertake investigations into alleged restrictive and discriminatory procurement measures or practices adopted or maintained by third countrithird country measures or practices against Union economic operators, goods and services, and to enter into consultations with the third countries concerned.
2021/10/18
Committee: INTA
Amendment 248 #
Proposal for a regulation
Article 1 – paragraph 1 – subparagraph 2
ItThis Regulation provides for the possibility of applying price adjustment measures to certain tenders for contracts for the execution of works or a work, for the supply of goods and/or the provision of services and for concessions, on the basis of the origin of the economic operators, goods or services concerned. for the Commission to adopt implementing acts imposing IPI measures, in relation to such third country measures or practices to restrict the access of economic operators, goods or services from third countries to procurement procedures.
2021/10/18
Committee: INTA
Amendment 252 #
Proposal for a regulation
Article 1 – paragraph 3
3. This Regulation shall apply to the award of contracts for the supply of goods and/or services and to the award of works and services concessions. It shall only apply where the goods or services are procured for governmental purposes. It shall not apply where the goods are purchased with a view to commercial resale or with a view to use in the production of goods for commercial sale. It shall not apply where the services are purchased with a view to commercial resale or with a view to use in the supply of services for commercial sale.deleted
2021/10/18
Committee: INTA
Amendment 256 #
Proposal for a regulation
Article 1 – paragraph 4
4. This Regulation shall apply only with regard to restrictive and/or discriminatory procurement measures or practices implemented by a third country in respect of purchases of non-covered goods and services. The application of this Regulation shall be without prejudice to any international obligations of the Union.deleted
2021/10/18
Committee: INTA
Amendment 260 #
Proposal for a regulation
Article 1 – paragraph 4 a (new)
4a. The application of this Regulation shall be without prejudice to any international obligations of the Union or measures that Member States and their contracting authorities and contracting entities may take in accordance with the acts mentioned in paragraph 2.
2021/10/18
Committee: INTA
Amendment 262 #
Proposal for a regulation
Article 1 – paragraph 5
5. Member States and their contracting authorities and contracting entities shall not apply restrictive measures in respect of third country economic operators, goods and services beyond those provided for in this Regulation.deleted
2021/10/18
Committee: INTA
Amendment 268 #
Proposal for a regulation
Article 1 – paragraph 5 a (new)
5a. This Regulation shall apply only to procurement procedures launched after its entry into force. An IPI measure shall only apply to procurement procedures which are covered by the IPI measure and have been launched at any moment between the entry into force of that IPI measure and its expiry, withdrawal or suspension. A reference to the application of this Regulation and any applicable IPI measure shall be included by contracting authorities and contracting entities in the procurement documents for procedures falling within the scope of an IPI measure.
2021/10/18
Committee: INTA
Amendment 269 #
Proposal for a regulation
Article 1 – paragraph 5 b (new)
5b. Member States shall take appropriate measures to ensure that in the performance of public contracts economic operators comply with applicable obligations in the fields of environmental, social and labour law established by Union law, national law, collective agreements or by the international environmental, social and labour law provisions listed in Annex X of the Directive 2014/24/EU and of the Paris Agreement.
2021/10/18
Committee: INTA
Amendment 270 #
Proposal for a regulation
Article 2 – paragraph 1 – point a
(a) 'economic operator' means any natural or legal person or public entity or group of such persons and/or entities, including any temporary association of undertakings, which submits a tender for the ex economic operator as defined in Direcution of works and/or a work, the supply of goods or the provision of services on the marketves 2014/23/EU, 2014/24/EU and 2014/25/EU respectively;
2021/10/18
Committee: INTA
Amendment 274 #
Proposal for a regulation
Article 2 – paragraph 1 – point a a (new)
(aa) 'a good or goods' means goods referred to in the object of the public procurement tender and in accordance with the specifications of the contract. It does not cover any input, material or ingredient incorporated in a good or in the supplied goods;
2021/10/18
Committee: INTA
Amendment 277 #
Proposal for a regulation
Article 2 – paragraph 1 – point a b (new)
(ab) 'estimated value’ means estimated value as calculated in accordance with Directives 2014/23/EU, 2014/24/EU and 2014/25/EU respectively;
2021/10/18
Committee: INTA
Amendment 278 #
Proposal for a regulation
Article 2 – paragraph 1 – point a c (new)
(ac) 'score adjustment measure’ means the relative diminution by a given percentage of the score of a tender resulting from its evaluation by a contracting authority or a contracting entity on the basis of the contract award criteria defined in the procurement documents. For the purposes of contract award criteria, Member States shall integrate environmental, social and labour requirements that apply at the place where the works are executed and result from international obligations, laws, regulations, decrees and decisions, at both national and Union level, as well as from collective agreements. In cases where price or cost is the only contract award criterion, the score adjustment measure means the relative increase, for the purpose of the evaluation of tenders, by a given percentage of the price offered by a tenderer;
2021/10/18
Committee: INTA
Amendment 281 #
Proposal for a regulation
Article 2 – paragraph 1 – point b
(b) ‘contracting authority’ means a contracting authority as defined in Article 2(1) of Directive 2014/24/EUDirectives 2014/23/EU, 2014/24/EU and 2014/25/EU respectively;
2021/10/18
Committee: INTA
Amendment 282 #
Proposal for a regulation
Article 2 – paragraph 1 – point c
(c) ‘contracting entity’ means a 'contracting entity' as defined in Article 4(1) of Directive 2014/25/EU and Article 7 of Directive 2014/23/EU ;
2021/10/18
Committee: INTA
Amendment 284 #
Proposal for a regulation
Article 2 – paragraph 1 – point d
(d) ‘covered goods or services’ means goods or services originating in a country with which the Union has concluded an international agreement in the field of public procurement and/or concessions including market access commitments and in respect of which the relevant agreement applies;deleted
2021/10/18
Committee: INTA
Amendment 286 #
Proposal for a regulation
Article 2 – paragraph 1 – point e
(e) ‘non-covered goods or services’ means goods or services originating in a country with which the Union has not concluded an international agreement in the field of public procurement or concessions including market access commitments, as well as goods or services originating in a country with which the Union has concluded such an agreement but in respect of which the relevant agreement does not applydeleted
2021/10/18
Committee: INTA
Amendment 290 #
Proposal for a regulation
Article 2 – paragraph 1 – point f
(f) ‘restrictive and/or discriminatory procurementthird country measure or practice’ means any legislative, regulatory or administrative measure, procedure or practice, or combination thereof, adopted or maintained by public authorities or individual contracting authorities or contracting entities in a third country, that result in a serious and recurrent impairment of access of Union goods, services and/or economic operators to the public procurement or concession market of that countrys.
2021/10/18
Committee: INTA
Amendment 291 #
Proposal for a regulation
Article 2 – paragraph 1 – point f a (new)
(fa) ‘IPI measure’ means a measure adopted by the Commission in accordance with this Regulation limiting the access of economic operators and/or goods and services originating in the third country to the Union procurement or concessions market in the area of non-covered procurement;
2021/10/18
Committee: INTA
Amendment 293 #
Proposal for a regulation
Article 2 – paragraph 1 – point f b (new)
(fb) ‘non-covered procurement’ means procurement procedures for goods, services or concessions regarding which the Union has not undertaken market access commitments in an international agreement in the field of procurement or concessions;
2021/10/18
Committee: INTA
Amendment 296 #
Proposal for a regulation
Article 2 – paragraph 1 – point f c (new)
(fc) ‘contract’ means public contracts as defined in Directive 2014/24/EU, concessions as defined in Directive 2014/23/EU and supply, works and service contracts as defined in Directive 2014/25/EU;
2021/10/18
Committee: INTA
Amendment 297 #
Proposal for a regulation
Article 2 – paragraph 1 – point f d (new)
(fd) ‘tenderer’ means a tenderer as defined in Directives 2014/23/EU, 2014/24/EU and 2014/25/EU respectively;
2021/10/18
Committee: INTA
Amendment 301 #
Proposal for a regulation
Article 2 – paragraph 1 – point h
(h) SME means SME as defined in Commission Recommendation 2003/361/EC25 . _________________ 25Commission Recommendation 2003/361/EC of 6 May 2003 concerning the definition of micro, small and medium-sized enterprises (OJ L 124, 20.5.2003, p. 36).deleted
2021/10/18
Committee: INTA
Amendment 303 #
Proposal for a regulation
Article 2 – paragraph 1 – point h a (new)
(ha) 'Union interest' means a determination as to whether the Union's interest calls for intervention shall be based on an appreciation of all the various interests taken as a whole, including the interests of the domestic industry and users and consumers. Measures may not be applied where the authorities, on the basis of all the information submitted, can clearly conclude that it is not in the Union's interest to apply such measures. (See mutatis mutandis Article 21 Regulation (EU) 2016/1036 of the European Parliament and of the Council of 8 June 2016 on protection against dumped imports from countries not members of the European Union (codification))
2021/10/18
Committee: INTA
Amendment 304 #
Proposal for a regulation
Article 2 – paragraph 1 – point h a (new)
(ha) ‘Evidence’ means any information, certificate, supporting document, statement and other means of proof aimed at proving compliance with the obligations set out in Art. 7.1 (c). This may refer to: (i) certificates of origin, supplier declarations or import declarations for goods originating in third countries; (ii) description of manufacturing processes (including samples, descriptions or photographs) for goods to be supplied; and (iii) extract of relevant registers or of financial statements for the origin of services, including a VAT identification number;
2021/10/18
Committee: INTA
Amendment 308 #
Proposal for a regulation
Article 2 – paragraph 2
2. For the purpose of this Regulation, except for Articles 5(3) and 5(7), the execution of works and/or a work within the meaning of Directives 2014/253/EU, 2014/24/EU and Directive 2014/235/EU shall be considered as the provision of a service.
2021/10/18
Committee: INTA
Amendment 310 #
Proposal for a regulation
Article 3 – title
RulesDetermination of origin
2021/10/18
Committee: INTA
Amendment 312 #
Proposal for a regulation
Article 3 – paragraph 1
1. The origin of a good shall be determined in accordance with Article 22 to 26 of Council Regulation (EEC) No 2913/199226 . _________________ 26Council Regulation (EEC) No 2913/1992 of 12 October 1992 establishing the Community Customs Code (OJ L 302, 19.10.1992, p. 1).deleted
2021/10/18
Committee: INTA
Amendment 314 #
Proposal for a regulation
Article 3 – paragraph 2
2. The origin of a service shall be determined on the basis of the origin of the economic operator providing it.deleted
2021/10/18
Committee: INTA
Amendment 315 #
Proposal for a regulation
Article 3 – paragraph 3 – point a
(a) in the case of a natural person, the country of which the person is a national or where hethat person has a right of permanent residence;
2021/10/18
Committee: INTA
Amendment 318 #
Proposal for a regulation
Article 3 – paragraph 3 – point b – point i
(i) if the service is not provided through a commercial presence within the Union, the country under the laws of which the legal person is constituted or otherwise organised and in the territory of which the legal person is engaged in substantive business operations, entailing a direct and effective link with the economy of the country concerned;
2021/10/18
Committee: INTA
Amendment 320 #
Proposal for a regulation
Article 3 – paragraph 3 – point b – point ii
ii) the Member State where the legal person is established and engaged in substantive business operations entailing a direct and effective link with the economy of the Member State concerndeleted.
2021/10/18
Committee: INTA
Amendment 322 #
Proposal for a regulation
Article 3 – paragraph 3 – subparagraph 2
ForIf the purposes of point (b) (ii) of the first subparagraph if the legal person is not engaged in substantive business operations entailing a direct and effective link with the economy of a Member State , the origin of the legal person shall be that of the person or persons which own or control the legal person . legal person is not engaged in substantive business operations in the territory of the country in which it is constituted or otherwise engaged , the origin of the legal person shall be that of the person or persons which may exercise directly or indirectly a dominant influence of the legal person by virtue of their ownership to it, their financial participation therein, or the rules which govern it. That person or persons shall be presumed as having a dominant influence on the legal person in any of the following cases in which they, directly or indirectly: (a) hold the majority of the legal person’s subscribed capital; (b) control the majority of the votes attaching to shares issued by the legal person; (c) can appoint more than half of the legal person’s administrative, management or supervisory body.
2021/10/18
Committee: INTA
Amendment 324 #
Proposal for a regulation
Article 3 – paragraph 3 – subparagraph 3
A legal person shall be considered to be "owned" by persons of a given country where more than 50 % of the equity interest in it is beneficially owned by persons of that country.deleted
2021/10/18
Committee: INTA
Amendment 326 #
Proposal for a regulation
Article 3 – paragraph 3 – subparagraph 3 a (new)
Where an economic operator is a group of natural or legal persons and/or public entities, and at least one of such persons or entities originates from the third country whose economic operators and goods and services are subject to the IPI measure, the IPI measure shall equally apply to tenders submitted by that group. This shall not apply in cases in which such persons' or entities' participation in a group amounts to less than 15% of the value of the tender in question, unless that person or entity is necessary for fulfilling the majority of at least one of the selection criteria in a procurement procedure.
2021/10/18
Committee: INTA
Amendment 327 #
Proposal for a regulation
Article 3 – paragraph 3 – subparagraph 3 b (new)
Contracting authorities or contracting entities may at any time during the procurement procedure request the economic operator to submit, supplement, clarify or complete the information or documentation related to the verification of the economic operator's origin within an appropriate time limit, provided that such requests are made in full compliance with the principles of equal treatment and transparency. Tenders from economic operators that fail to provide such information or documentation may be rejected in accordance with the rules applicable to the award procedure.
2021/10/18
Committee: INTA
Amendment 328 #
Proposal for a regulation
Article 3 – paragraph 3 – subparagraph 3 c (new)
For the application of the additional contractual obligations upon the successful tenderer set out in Article 7, the origin of a good shall be determined in accordance with Articles 59 to 62 of Council Regulation (EEC) No 952/2013, while the origin of a service shall be determined on the basis of the origin of the economic operator providing it.
2021/10/18
Committee: INTA
Amendment 330 #
Proposal for a regulation
Article 3 – paragraph 3 – subparagraph 4
A legal person shall be considered to be "controlled" by persons of a given country where such persons have the power to appoint a majority of its directors or otherwise to legally direct its actions.deleted
2021/10/18
Committee: INTA
Amendment 333 #
Proposal for a regulation
Chapter 2 – title
Chapter II Exemptionsdeleted
2021/10/18
Committee: INTA
Amendment 337 #
Proposal for a regulation
Article 4 – paragraph 1
Tenders shall be exempted from this Regulation where more than 50% of the total value of the tender is made up of goods and/or servicesthey have been submitted by an economic operator originating in least- developed countries listed in Annex IV to Regulation (EU) No 978/201227 , and in developing countries considered to be vulnerable due to a lack of diversification and insufficient integration within the international trading system as defined in Annex VII to Regulation (EU) No 978/2012. _________________ 27Regulation (EU) No 978/2012 of the European Parliament and of the Council applying a scheme of generalised tariff preferences and repealing Council Regulation (EC) No 732/2008 (OJ L 303, 31.10.2012, p. 1).
2021/10/18
Committee: INTA
Amendment 341 #
Proposal for a regulation
Article 5
Exemption for tenders submitted by SMEs Tenders submitted by SMEs28 established in the Union and engaged in substantive business operations entailing a direct and effective link with the economy of at least one Member State, shall be exempted from this Regulation. _________________ 28As defined in the Commission recommendation of 6 May 2003 concerning the definition of micro, small and medium-sized enterprises (OJ L 124, 20.5.2003, p. 36).Article 5 deleted
2021/10/18
Committee: INTA
Amendment 344 #
Investigations, consultations and price adjustment measure, measures and contractual obligations
2021/10/18
Committee: INTA
Amendment 347 #
Proposal for a regulation
Article 6 – title
Investigations and consultations
2021/10/18
Committee: INTA
Amendment 350 #
Proposal for a regulation
Article 6 – paragraph 1 – subparagraph 1
WhereIf the Commission considers it to be in the interest of the Union, it may at any timeshall, on its own initiative or upon application of interested partiessubstantiated complaint of an EU interested party, including workers and trade unions, or a Member State, initiate an investigation into an alleged restrictive and/or discriminatory procurement third country measures or practices by publishing a notice in the Official Journal of the European Union. The notice of initiation shall include the Commission's preliminary assessment of the third country measure or practice and invite interested parties and Member States to provide all relevant information to the Commission within a specified period of time.
2021/10/18
Committee: INTA
Amendment 355 #
Proposal for a regulation
Article 6 – paragraph 1 – subparagraph 1 a (new)
Upon publication of the notice, the Commission shall invite the third country concerned to submit its views, provide information and enter into consultations with the Commission in order to remove the alleged third country measure or practice. The Commission shall regularly inform Member States, within the Committee set up by Article 7 of the Council Regulation (EU) 2015/1843 (Trade Barriers Regulation), the interested parties and the European Parliament.
2021/10/18
Committee: INTA
Amendment 360 #
Proposal for a regulation
Article 6 – paragraph 2
2. The assessment by the Commission of whether the alleged restrictive and/or discriminatory procurement measures or practices have been adopted or are maintained by the third country concerned shall be made on the basisinvestigation and consultations shall be concluded within a period of six months after the date of the publication in the Official Journal of the informitiation supplied by interested parties and Member States, of facts collected by the Commission during its investigation, or both. The assessment shall be concluded within a period of eight months after the initiation of the investigation. In duly justified cases, this period may be extended by four monthnotice. In duly justified cases, the Commission may, before the end of the initial six months, extend that period by three months, by publishing a notice in the Official Journal of the European Union and informing the third country, interested parties and Member States.
2021/10/18
Committee: INTA
Amendment 364 #
Proposal for a regulation
Article 6 – paragraph 2 a (new)
2a. Upon conclusion of the investigation and consultations, the Commission shall make publicly available a report recording the main findings of the investigation and a proposed course of action. The Commission shall present the report to the European Parliament.
2021/10/18
Committee: INTA
Amendment 368 #
Proposal for a regulation
Article 6 – paragraph 3
3. Where the Commission concludes as a result offinds, following its investigation that the alleged restrictive and/or discriminatory procurementthird country measures or practices areis not maintained or that ithey does not result in restrictions toserious and recurrent impairment of access byof Union economic operators or Union goods andor services to the public procurement or concession markets of the third country concerned, the Commission shall terminate the investigation. and publish a notice of termination in the Official Journal of the European Union.
2021/10/18
Committee: INTA
Amendment 370 #
Proposal for a regulation
Article 6 – paragraph 4
4. When the Commission has concluded its investigation, it shall make publicly available a report recording its main findings.deleted
2021/10/18
Committee: INTA
Amendment 374 #
Proposal for a regulation
Article 6 – paragraph 4 a (new)
4a. The Commission may suspend the investigation and consultations at any time if the third country: (a) takes satisfactory corrective measures, or (b) undertakes commitments towards the Union to end or phase out the third country measure or practice within a reasonable period of time and no later than three months; The Commission may resume the investigation and consultations at any time if it concludes that the reasons for the suspension are no longer valid. The Commission shall publish a notice in the Official Journal of the European Union in case of suspension or resumption of the investigation and consultations.
2021/10/18
Committee: INTA
Amendment 375 #
2021/10/18
Committee: INTA
Amendment 387 #
Proposal for a regulation
Article 8
1. Tenders more than 50 % of the total value of which is made of goods and/or services originating in a third country, may be subject to a price adjustment measure where the third country concerned adopts or maintains restrictive and/or discriminatory procurement measures or practices. Price adjustment measures shall only apply to contracts with an estimated value equal to or above EUR 5.000.000 exclusive of value-added tax. 2. The price adjustment measure shall specify the penalty of up to 20% to be calculated on the price of the tenders concerned. It shall also specify any restrictions to the scope of application of the measure, such as those related to: (a) public procurement of specific categories of contracting authorities or contracting entities; (b) public procurement of specific categories of goods or services or tenders submitted by specific categories of economic operators; (c) public procurement above or within certain thresholds; (d) tenders submitted for specific categories of concessions; (e) the territories of certain subcentral levels of government. 3. Contracting authorities and contracting entities on the list adopted pursuant to Article 9 shall apply the price adjustment measure to the following: (a) to tenders submitted by economic operators originating in the third country concerned, unless these economic operators can demonstrate that less than 50 % of the total value of their tender is made up of goods or services originating in the third country concerned; and (b) to any tenders offering goods and services originating in the country concerned, where the value of these goods and services accounts for more than 50 % of the total value of the tender.Article 8 deleted Price adjustment measures
2021/10/18
Committee: INTA
Amendment 429 #
Proposal for a regulation
Article 8 a (new)
Article 8a IPI measures 1. Where the Commission finds, following an investigation and consultations pursuant to Article 4, that a third country measure or practice exists, it shall, if it considers it to be in the interest of the Union, adopt an implementing act to impose an IPI measure as provided in paragraph 5 of this article. An IPI measure shall only apply if the main subject of the procurement procedure falls within the scope of the implementing act as defined in accordance with paragraph 7(a). The design of the procurement procedure shall not be made with the intention of excluding it from the scope of this Regulation. 2. The IPI measure shall be determined on the basis of the following criteria, in light of available information and the Union’s interest: (a) proportionality of the IPI measure with regard to the third country measure or practice; (b) availability of alternative sources of supply for the goods and services concerned, in order to avoid or minimise a significant negative impact on contracting authorities or contracting entities. 3. The IPI measure shall only apply to procurement procedures with an estimated value equal or above EUR 10 000 000 net of value-added tax for works and concessions, and equal to or above EUR 5 000 000 net of value-added tax for goods and services 4. The IPI measure shall also apply in the case of specific contracts awarded under a dynamic purchasing system, when those dynamic purchasing systems were subject to the IPI measure, with the exception of specific contracts the estimated value of which is below the respective values set out in Article 8 of Directive 2014/23/EU, Article 4 of Directive 2014/24/EU and Article 15 of Directive 2014/25/EU. The IPI measure shall not apply to procedures for the award of contracts based on a framework agreement. The IPI measure shall also not apply to individual lots to be awarded according to Article 5 (10) of Directive 2014/24/EU or Article 16 (10) of Directive 2014/25/EU. 5. In its implementing act, the Commission may decide, within the scope defined in paragraph 6 of this Article, to restrict the access of operators, goods or services from third countries to procurement procedures by requiring contracting authorities or contracting entities to: (a) impose a score adjustment measure on tenders submitted by economic operators originating in the that third country; or (b) exclude tenders submitted by economic operators originating in that third country; or (c) impose a combination of (a) and (b), if different sectors or categories of goods and services are subject to IPI measures. 6. The score adjustment measure referred to in paragraph 5(a) shall apply only for the purpose of the evaluation and ranking of the tenders. It shall not affect the price due to be paid under the contract to be concluded with the successful tenderer. 7. The implementing act, adopted in accordance with Article 10(2), shall specify the scope of application of the IPI measure, including: (a) the sectors or the categories of goods, services and concessions based on the Common Procurement Vocabulary as well as any applicable exceptions, (b) specific categories of contracting authorities or contracting entities; (c) specific categories of economic operators; (d) as regards the score adjustment measure referred to in paragraph 5(a), the percentage value of the adjustment shall be set up to 60% of the evaluation score of the tender depending on the third country and sector of goods, services, works or concessions envisaged. 8. When determining the proportionality of the IPI measure according to paragraph 2(a), the Commission shall in particular consider the percentage value according to paragraph 7(e). The Commission shall impose an IPI measure in the form of exclusion according to paragraph 5(b) only when the third country measure or practice is sufficiently severe and the potential negative impact according to paragraph 2(b) due to the limited availability of alternative sources is comparatively small. 9. The Commission may withdraw the IPI measure or suspend its application if the third country takes satisfactory corrective actions or undertakes commitments to end the measure or practice in question. If the Commission considers that the corrective actions or commitments undertaken have been rescinded, suspended or improperly implemented, it shall make publicly available its findings and may reinstate the application of the IPI measure at any time. The Commission may withdraw, suspend or reinstate an IPI measure in accordance with the examination procedure referred to in Article 10(2) and followed by the publication of a notice in the Official Journal of the European Union. 10. An IPI measure shall expire five years from its entry into force or its extension, unless a review shows a need for continued application of an IPI measure. Such a review shall be initiated, by a publication of a notice in the Official Journal of the European Union, on the initiative of the Commission nine months before the date of the expiry, and shall be concluded within six months. Following the review, the Commission may extend the duration of an IPI measure for a period of another five years in accordance with the examination procedure referred to in Article 10(2).
2021/10/18
Committee: INTA
Amendment 433 #
Proposal for a regulation
Article 9
Authorities or entities concerned The Commission shall determine the contracting authorities or entities or categories of contracting authorities or entities, listed by Member State, whose procurement is concerned by the measure. To provide the basis for this determination, each Member State shall submit a list of appropriate contracting authorities or entities or categories of contracting authorities or entities. The Commission shall ensure that an appropriate level of action is taken and that a fair distribution of the burden among Member States is achieved.rticle 9 deleted
2021/10/18
Committee: INTA
Amendment 439 #
Proposal for a regulation
Article 9 a (new)
Article 9a Additional contractual obligations upon the successful tenderer 1. In the case of procurement procedures to which an IPI measure is applicable, as well as in the case of contracts awarded based on a framework agreement where the estimated value of those contracts is equal or above the respective values set out in Article 8 of Directive 2014/23/EU, Article 4 of Directive 2014/24/EU and Article 15 of Directive 2014/25/EU and when those framework agreements were subject to the IPI measure, contracting authorities and contracting entities shall also include, among the conditions of the contract with the successful tenderer: (a) a commitment not to subcontract more than 25% of the total value of the contract to economic operators originating in a third country which is subject to an IPI measure; (b) for contracts whose subject matter covers the supply of goods, a commitment that, for the duration of the contract, goods and/or services supplied or provided in the execution of the contract and originating in the third country which is subject to the IPI measure represent no more than 25% of the total value of the contract, whether such goods and/or services are supplied or provided directly by the tenderer or by a subcontractor; (c) an obligation to provide upon request adequate evidence corresponding to points (a) and/or (b)to the contracting authority or the contracting entity at the latest upon completion of the execution of the contract; (d) a proportionate charge, in case of non-observance of the commitments referred in points (a) or (b) of 25% of the total value of the contract. 2. For the purposes of paragraph 1(c) it is sufficient to provide evidence that more than 75% of the total value of the contract originates in countries other than the third country subject to the IPI measure. The contracting authority or contracting entity shall request evidence in case of reasonable indications of incompliance with paragraph 1(a) and/or1(b) or if the contract is awarded to a group of economic operators comprising a legal person originating in the country subject to an IPI measure. 3. A reference to the additional conditions laid down in this Article shall be included by contracting authorities and contracting entities in the documents for procurement procedures to which an IPI measure is applicable.
2021/10/18
Committee: INTA
Amendment 443 #
Proposal for a regulation
Article 10
1. The Commission may decide, by implementing act, to withdraw the price adjustment measure or suspend its application for a period of time if the country concerned takes satisfactory remedial or corrective actions. Where the remedial or corrective actions taken by the third country concerned are rescinded, suspended or improperly implemented, the Commission may reinstate the application of the price adjustment measure, at any time, by means of an implementing act. 2. The Commission shall make publicly available its findings regarding the remedial or corrective actions taken by the third country concerned. 3. The implementing acts referred to in this Article shall be adopted in accordance with the examination procedure referred to in Article 14(2).Article 10 deleted Withdrawal or suspension of price adjustment measures
2021/10/18
Committee: INTA
Amendment 449 #
2021/10/18
Committee: INTA
Amendment 466 #
Proposal for a regulation
Article 12 – paragraph 1 – introductory part
1. Contracting authorities and contracting entities may, on an exceptional basis, decide not to apply the price adjustmentIPI measure with respect to a procurement or a concession procedure if:
2021/10/18
Committee: INTA
Amendment 470 #
Proposal for a regulation
Article 12 – paragraph 1 – point a
(a) there are no Union and/or covered goods or services available which meet the requirements of the contracting authority or contracting entity; ordeleted
2021/10/18
Committee: INTA
Amendment 475 #
Proposal for a regulation
Article 12 – paragraph 1 – point a a (new)
(aa) there are only tenders from economic operators originating in the country subject to an IPI measure, or only such tenders meet the tender requirements; or
2021/10/18
Committee: INTA
Amendment 480 #
Proposal for a regulation
Article 12 – paragraph 1 – point a b (new)
(ab) this is justified for overriding reasons relating to the public interest, public security or public health emergencies.
2021/10/18
Committee: INTA
Amendment 483 #
Proposal for a regulation
Article 12 – paragraph 1 – point b
(b) the application of the measure would lead to a disproportionate increase in the price or costs of the contract.deleted
2021/10/18
Committee: INTA
Amendment 486 #
Proposal for a regulation
Article 12 – paragraph 2
2. Where a contracting authority or contracting entity intenddecides not to apply a price adjustmentn IPI measure , it shall indicate its intention in the contract notice that it publishes pursuant to Article 49 of Directive 2014/24/EU or Arform the Commission, in a manner to be decided by the respective Member State, no later than thirty calendar days after the publication of the contract noticle 69 of Directive 2014/25/EU or in the concession notice pursuant to Article 31 of Directive 2014/23/EU. It shall notify the Commission no later than ten calendar days after the publication of the contract noticethe award of the contract. The Commission may object to a non- application of an IPI measure if the notification lacks sufficient justification. If the Commission intends to object to the non-application of an IPI measure, it shall notify the contracting authority or contracting entity within the aforementioned time period.
2021/10/18
Committee: INTA
Amendment 492 #
Proposal for a regulation
Article 12 – paragraph 3 – introductory part
3. The notification shall contain the following information: information on the origin of the economic operators that have submitted a tender, due justification of the use of the exception and, where appropriate, any other information deemed useful by the contracting authority or contracting entity.
2021/10/18
Committee: INTA
Amendment 495 #
Proposal for a regulation
Article 12 – paragraph 3 – point a
(a) the name and contact details of the contracting authority and/or contracting entity;deleted
2021/10/18
Committee: INTA
Amendment 496 #
Proposal for a regulation
Article 12 – paragraph 3 – point b
(b) a description of the object of the contract;deleted
2021/10/18
Committee: INTA
Amendment 498 #
(c) information on the origin of the economic operators, the goods and/or services to be admitdeleted;
2021/10/18
Committee: INTA
Amendment 499 #
Proposal for a regulation
Article 12 – paragraph 3 – point d
(d) the ground on which the decision not to apply the price adjustment measure is based, and a detailed justification for the use of the exception;deleted
2021/10/18
Committee: INTA
Amendment 502 #
Proposal for a regulation
Article 12 – paragraph 3 – point e
(e) where appropriate, any other information deemed useful by the contracting authority and/or contracting entity. The Commission may ask the contracting authority or contracting entity concerned for additional information.deleted
2021/10/18
Committee: INTA
Amendment 503 #
Proposal for a regulation
Article 12 – paragraph 3 – subparagraph 2
The Commission may ask the contracting authority or contracting entityMember State concerned for additional information.
2021/10/18
Committee: INTA
Amendment 504 #
Proposal for a regulation
Article 12 – paragraph 4 – subparagraph 1
In the event that a contracting authority or contracting entity conducts a negotiated procedure without prior publication, under Article 2 of Directive 2014/24/EU or under Article 50 of Directive 2014/25/EU and decides not to apply a price adjustment measure , it shall indicate this in the contract award notice it publishes pursuant to Article 50 of Directive 2014/24/EU or Article 70 of Directive 2014/25/EU or in the concession award notice it publishes pursuant to Article 32 of Directive 2014/23/EU and notify the Commission no later than ten calendar days after the publication of the contract award notice.deleted
2021/10/18
Committee: INTA
Amendment 507 #
(a) the name and contact details of the contracting authority or contracting entity;deleted
2021/10/18
Committee: INTA
Amendment 508 #
Proposal for a regulation
Article 12 – paragraph 4 – subparagraph 2 – point b
(b) a description of the object of the contract or the concession;deleted
2021/10/18
Committee: INTA
Amendment 509 #
Proposal for a regulation
Article 12 – paragraph 4 – subparagraph 2 – point c
(c) information on the origin of the economic operators, the goods and/or services admitdeleted;
2021/10/18
Committee: INTA
Amendment 510 #
Proposal for a regulation
Article 12 – paragraph 4 – subparagraph 2 – point d
(d) the justification for the use of the exception;deleted
2021/10/18
Committee: INTA
Amendment 511 #
Proposal for a regulation
Article 12 – paragraph 4 – subparagraph 2 – point e
(e) where appropriate, any other information deemed useful by the contracting authority or contracting entity.deleted
2021/10/18
Committee: INTA
Amendment 512 #
Proposal for a regulation
Article 13 – title
ImplementationRemedies
2021/10/18
Committee: INTA
Amendment 514 #
Proposal for a regulation
Article 13 – paragraph 1
1. In case of misapplication by contracting authorities or contracting entities of exceptions laid down in Article 12, the Commission may apply the corrective mechanism of Article 3 of Directive 89/665/EEC29 or Article 8 of Directive 92/13/EEC30 . _________________ 29Council Directive 89/665/EEC of 21 December 1989 on the coordination of the laws, regulations and administrative provisions relating to the application of review procedures to the award of public supply and public works contracts (OJ L 395, 30.12.1989, p. 33). 30Council Directive 92/13/EEC of 25 February 1992 coordinating the laws, regulations and administrative provisions relating to the application of Community rules on the procurement procedures of entities operating in the water, energy, transport and telecommunications sectors (OJ L 76, 23.3.1992, p. 14).deleted
2021/10/18
Committee: INTA
Amendment 515 #
Proposal for a regulation
Article 13 – paragraph 2
2. Contracts concluded with an economic operator in violation of price adjustment measures adopted or reinstated by the Commission pursuant to this Regulation shall be ineffective.deleted
2021/10/18
Committee: INTA
Amendment 518 #
Proposal for a regulation
Article 13 a (new)
Article 13a Remedies To ensure legal protection of economic operators having or having had an interest in obtaining a particular contract falling under the scope of this Regulation, Council Directive 89/665/EEC and Council Directive 92/13/EEC shall apply accordingly
2021/10/18
Committee: INTA
Amendment 521 #
Proposal for a regulation
Article 15
1. Information received pursuant to this Regulation shall be used only for the purpose for which it was requested. 2. Neither the Commission nor the Council, nor the European Parliament nor Member States, nor their officials shall reveal any information of a confidential nature received pursuant to this Regulation, without specific permission from the supplier of such information. 3. The supplier of information may request to treat information submitted as confidential. The request for confidentiality shall be accompanied by a non-confidential summary of the information or a statement of the reasons why the information cannot be summarised. 4. If a request for confidentiality is not justified and if the supplier is unwilling either to make the information public or to authorise its disclosure in generalised or summary form, the information in question may be disregarded. 5. Paragraphs 1 to 4 shall not preclude the disclosure of general information by the Union authorities. Such disclosure must take into account the legitimate interest of the parties concerned in not having their business secrets divulged.Article 15 deleted Confidentiality
2021/10/18
Committee: INTA
Amendment 523 #
Proposal for a regulation
Article 16 – paragraph 1
By 31 December 2018Three years after the date of entry into force of this Regulation and at least every three years thereafter , the Commission shall submit a report to the European Parliament and the Council on the application of this Regulation and on progress made in international negotiations regarding access for Union economic operators to public contract or concession award procedures inrocurement and concession markets of third countries undertaken under this Regulation. To this effect, Member States shall upon request provide the Commission with appropriate informationMember States will inform the Commission when applying an IPI measure, with appropriate information on the application of measures under this Regulation, including as regards the number of procurement procedures at central and sub-central level in which a given IPI measure was applied, the number of tenders received from third countries subject to that IPI measure, as well as cases in which a specific exception from the IPI measure was applied.
2021/10/18
Committee: INTA
Amendment 531 #
Proposal for a regulation
Article 17 a (new)
Article 17a Review No later than three years after the adoption of an implementing act or after the date of entry into force of this Regulation, whichever is the earliest, and every three years thereafter, the Commission shall review the scope, functioning and efficiency of this Regulation, and shall report its findings to the European Parliament and the Council.
2021/10/18