9 Amendments of Mathilde ANDROUËT related to 2022/0160(COD)
Amendment 55 #
Proposal for a directive
Article 1 – paragraph 1 – point 2
Article 1 – paragraph 1 – point 2
Directive (EU) 2018/2001
Article 3 – paragraph 1
Article 3 – paragraph 1
Amendment 138 #
Proposal for a directive
Article 1 – paragraph 1 – point 7
Article 1 – paragraph 1 – point 7
Directive (EU) 2018/2001
Article 16a – paragraph 1
Article 16a – paragraph 1
(1) Member States shall ensure that the permit-granting process referred to in Article 16(1) shall not exceed one year for projects in renewables go-to areas. Where duly justifiis conducted oin the ground of extraordinary circumstances, this one- year period may be extended by up to three months. In such a case, Member States shall clearly inform the developer about the extraordinary circumstances that justified the extensionaccordance with the national law in force.
Amendment 142 #
Proposal for a directive
Article 1 – paragraph 1 – point 7
Article 1 – paragraph 1 – point 7
Directive (EU) 2018/2001
Article 16a – paragraph 2
Article 16a – paragraph 2
(2) The permit-granting process for the repowering of plants and for new installations with an electrical capacity of less than 150 kW, co-located energy storage facilities as well as their grid connection, located in renewables go-to areas shall not exceed six months. Where duly justified on the ground of extraordinary circumstances, such as on grounds of overriding safety reasons where the repowering project impacts substantially on the grid or the original capacity, size or performance of the installation, that one year period may be extended by up to three months. Member States shall clearlybe conducted in accordance with the national law in form the project developer about the extraordinary circumstances that justify the extensionce.
Amendment 180 #
Proposal for a directive
Article 1 – paragraph 1 – point 8
Article 1 – paragraph 1 – point 8
Directive (EU) 2018/2001
Article 16b – paragraph 1
Article 16b – paragraph 1
(1) Member States shall ensure that the permit-granting process referred to in Article 16(1) shall not exceed two years, for projects outside renewables go-to areas. Where duly justifiis conducted oin the grounds of extraordinary circumstances, that two-year period may be extended by up to three months. In such a case, Member States shall clearly inform the developer about the extraordinary circumstances that justified the extensionaccordance with the national law in force.
Amendment 197 #
Proposal for a directive
Article 1 – paragraph 1 – point 9
Article 1 – paragraph 1 – point 9
Directive (EU) 2018/2001
Article 16c – paragraph 1
Article 16c – paragraph 1
(1) Member States shall ensure that the permit-granting process referred to in Article 16(1) for the installation of solar energy equipment, including building- integrated solar installations, in existing or future artificial structures, with the exclusion of artificial water surfaces, shall not exceed three monthsis conducted in accordance with the national law in force, provided that the primary aim of such structures is not solar energy production. By derogation from Article 4(2) of Directive 2011/92/EU and Annex II, points 3(a) and (b), alone or in conjunction with point 13(a) to that Directive, such installation of solar equipment shall be exempted from the requirement, if applicable, to carry out a dedicated environmental impact assessment under Article 2(1) of Directive 2011/92/EU.
Amendment 204 #
Proposal for a directive
Article 1 – paragraph 1 – point 10
Article 1 – paragraph 1 – point 10
Directive (EU) 2018/2001
Article 16d
Article 16d
Amendment 210 #
Proposal for a directive
Article 2 – paragraph 1 – point 1
Article 2 – paragraph 1 – point 1
Directive 2010/31/EU
Article 9a – paragraph 1
Article 9a – paragraph 1
Member States shall ensure that all new buildings are designed to optimise their solar energy generation potential on the basis of the solar irradiance of the site, enabling the later cost-effective attempt, where possible and in particular for new buildings, to foster the use of geothermal technology and rainwater harvesting systems for use in sanitary systems and for mainstallation of solar technologiining green spaces.
Amendment 211 #
Proposal for a directive
Article 2 – paragraph 1 – point 1
Article 2 – paragraph 1 – point 1
Directive 2010/31/EU
Article 9a – subparagraph 2
Article 9a – subparagraph 2
Amendment 218 #
Proposal for a directive
Article 3 – paragraph 1 – point 1
Article 3 – paragraph 1 – point 1
Directive 2012/27/EU
Article 3 – paragraph 5
Article 3 – paragraph 5