Proposal for a regulation
Article 4 Directive 2014/94/EU
Targets for electric recharging infrastructure dedicated to heavy-duty 1. Member States shall ensure a minimum coverage of publicly accessible recharging points dedicated to heavy-duty vehicles in their territory. To that end, Member States shall ensure that: (a) along the TEN-T core network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 60 km in-between them: (i) by 31 December 2025, each recharging pool shall offer a power output of at least 1400 kW and include at least one recharging station with an individual power output of at least 350 kW; (ii) by 31 December 2030, each recharging pool shall offer a power output of at least 3500 kW and include at least two recharging stations with an individual power output of at least 350 kW; (b) along the TEN-T comprehensive network, publicly accessible recharging pools dedicated to heavy-duty vehicles and meeting the following requirements are deployed in each direction of travel with a maximum distance of 100 km in-between them: (i) by 31 December 2030, each recharging pool shall offer a power output of at least 1400 kW and include at least one recharging station with an individual power output of at least 350 kW; (ii) by 1 December 2035, each recharging pool shall offer a power output of at least 3500 kW and include at least two recharging stations with an individual power output of at least 350 kW; (c) by 31 December 2030, in each safe and secure parking area at least one recharging station dedicated to heavy- duty vehicles with a power output of at least 100 kW is installed; (d) by 31 December 2025, in each urban node publicly accessible recharging points dedicated to heavy-duty vehicles providing an aggregated power output of at least 600 kW are deployed, provided by recharging stations with an individual power output of at least 150 kW; (e) by 31 December 2030, in each urban node publicly accessible recharging points dedicated to heavy-duty vehicles providing an aggregated power output of at least 1200 kW are deployed, provided by recharging stations with an individual power output of at least 150 kW. 2. Neighbouring Member States shall ensure that the maximum distances referred to in points (a) and (b) are not exceeded for cross-border sections of the TEN-T core and the TEN-T comprehensive network.Article 4 deleted vehicles