122 Amendments of Emma WIESNER related to 2020/0360(COD)
Amendment 139 #
Proposal for a regulation
Recital 12 a (new)
Recital 12 a (new)
(12 a) To enable sector integration, to acknowledge changes in consumer behaviour and to increase demand for green transport, charging infrastructure for electric vehicles should be eligible for the PCI Status;
Amendment 142 #
Proposal for a regulation
Recital 13
Recital 13
(13) The Commission’s communication on energy system integration underlines the need for integrated energy infrastructure planning across energy carriers, infrastructures, and consumption sectors. Such system integration starts from the point of departure of applying the energy efficiency first principle and taking a holistic approach in policy and beyond individual sectors. It also addresses the decarbonisation needs of the hard to abate sectors, such as parts of industry or certain modes of transport, where direct electrification is, currently, technically or economically challenging. Such investments include hydrogen and electrolysers, which are progressing towards commercial large-scale deployment. The Commission’s Hydrogen Strategy gives priority to hydrogen production from renewable electricity, which is the cleanest solution and is most compatible with the EU climate neutrality objective. In a transitional phase however, other forms of low-carbon hydrogen are needed to more rapidly replace existing hydrogen and kick-start an economy of scale.
Amendment 153 #
Proposal for a regulation
Recital 15 a (new)
Recital 15 a (new)
(15 a) Moreover, a focus should equally be laid on flexibility and energy storage solutions to support investments that allow for the stability of the grid and enable further integration of renewable energy sources; energy storage will be a crucial feature of the power grid given the volatile nature of renewable energy sources on the one hand and our need for grid stability and security of supply on the other;
Amendment 155 #
Proposal for a regulation
Recital 15 a (new)
Recital 15 a (new)
(15 a) Moreover, a new infrastructure category shall be introduced for network components contributing to operational safety and ancillary services to support investments that allow for the stability of the grid, power and voltage quality while enabling further integration of renewable energy sources.
Amendment 157 #
Proposal for a regulation
Recital 15 b (new)
Recital 15 b (new)
(15 b) Moreover, a new infrastructure category should be created for district heating and cooling systems.
Amendment 183 #
Proposal for a regulation
Recital 22
Recital 22
(22) To ensure voltage and frequency stability, particular attention should be given to the stability of the European electricity network under the changing conditions, for instance through exploring all possible sustainable energy storage solutions, especially in view of the growing share of renewable electricity.
Amendment 195 #
Proposal for a regulation
Recital 27
Recital 27
(27) Projects of common interest should be implemented as quickly as possible and should be closely monitored and evaluated, while keeping the administrative burden for project promoters to a minimum. The Commission should nominate European coordinators for projects facing particular difficulties or delays. The progress in the implementation of the specific projects as well as the fulfilment of the obligations pertaining to this Regulation should be taken into account in the selection process for subsequent Union lists for the respective projects.
Amendment 199 #
Proposal for a regulation
Recital 33
Recital 33
(33) In order to simplify and expedite the permitting process for offshore grids for renewable energy, the Member States around a particular sea basin should endevour to harmonise the relevant legislation and procedures and create one unique points of contact, referred to as an ‘offshore one-stop shop’, in view of regional specificities and geography, for the for facilitating, integrating and coordinating the process of granting of permits toall permit granting procedures of such projects. Moreover, the establishment of a one-stop shop per sea basin for offshore grids for renewable energy should reduce complexity, increase efficiency and speed up the permitting process of offshore transmission assets often crossing many jurisdictions. It shall issue comprehensive decisions for these projects on behalf of the relevant national Member States in a coordinated, collaborative or integrated manner.
Amendment 208 #
Proposal for a regulation
Recital 40 a (new)
Recital 40 a (new)
(40 a) The needs of an integrated energy market will go beyond a physical cross- border footprint of infrastructure projects in order to contribute to the TEN-E pillars, such as sustainability or security of supply. There will be an equal a need for cross-border and local projects that will have a positive effect on the Union's power grid, such as electrolysers, district heating and cooling networks or storage infrastructure of a certain capacity and ability to be replicable in more than one Member State.
Amendment 257 #
Proposal for a regulation
Recital 5
Recital 5
(5) The evaluation of Regulation (EU) No 347/2013 has clearly shown that the framework has effectively improved the integration of Member States’ networks, stimulated energy trade and hence contributed to the competitiveness of the Union. Projects of common interest in electricity and gas have strongly contributed to security of supply. For gas, the infrastructure is now well connected and supply resilience has improved substantially since 2013. This fact combined with fossil fuel infrastructure not being compatible with the Union climate neutrality goal causes gas infrastructure to no longer qualify as projects of common interests. Regional cooperation in Regional Groups and through cross-border cost allocation is an important enabler for project implementation. However, in many cases the cross-border cost allocation did not result in reducing the financing gap of the project, as intended. While the majority of permitting procedures have been shortened, in some cases the process is still long. The financial assistance from the Connecting Europe Facility (CEF) has been an important factor as grants for studies have helped projects to reduce risks in the early stages of development, while grants for works have supported projects addressing key bottlenecks that market finance could not sufficiently address.
Amendment 258 #
Proposal for a regulation
Article 2 – paragraph 1 – point 8
Article 2 – paragraph 1 – point 8
(8) ‘smart electricity grid’ means an electricity network where the grid operator can digitally monitor the actions of the users connected to it, and information and communication technologies (ICT) for communicating with related grid operators, generators, energy storage, consumers and/or prosumers, with a view to transmitting electricity in a sustainable, cost-efficient and secure way;
Amendment 265 #
Proposal for a regulation
Article 2 – paragraph 1 – point 9 a (new)
Article 2 – paragraph 1 – point 9 a (new)
(9 a) ’low carbon gas’ means gases such as biogas, biomethane, and hydrogen with the lifecycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council
Amendment 289 #
Proposal for a regulation
Recital 13
Recital 13
(13) The Commission’s communication on energy system integration underlines the need for integrated energy infrastructure planning across energy carriers, infrastructures, and consumption sectors. Such system integration starts from the point of departure of applying the energy efficiency first principle and taking a holistic approach in policy and beyond individual sectors. It also addresses the decarbonisation needs of the hard to abate sectors, such as parts of industry or certain modes of transport, where direct electrification is, currently, technically or economically challenging. Such investments include hydrogen and electrolysers, which are progressing towards commercial large-scale deployment. The Commission’s Hydrogen Strategy gives priority to hydrogen production from renewable electricity, which is the cleanest solution and is most compatible with the EU climate neutrality objective. In a transitional phase however, other forms of low-carbon hydrogen are needed to more rapidly replace existing hydrogen and kick-start an economy of scale.
Amendment 302 #
Proposal for a regulation
Recital 15
Recital 15
Amendment 309 #
Proposal for a regulation
Recital 15 a (new)
Recital 15 a (new)
(15a) Moreover, a new infrastructure category shall be introduced for network components contributing to operational safety and ancillary services to support investments that allow for the stability of the grid, power and voltage quality while enabling further integration of renewable energy sources.
Amendment 310 #
Proposal for a regulation
Recital 15 b (new)
Recital 15 b (new)
(15b) Moreover, a new infrastructure category should be created for district heating and cooling systems.
Amendment 313 #
Proposal for a regulation
Article 4 – paragraph 1 – point c – point ii
Article 4 – paragraph 1 – point c – point ii
(ii) is located on the territory of one Member State and has a significantpositive cross- border impacteffect or is replicable as set out in point (1) of Annex IV, whereas ‘replicable’ requires both knowledge sharing and knowledge transfer of at least two Member States or regions. The replicability of a project shall contribute to, amongst others, decarbonisation, the energy efficiency first principle, increase of the share of renewable energies or improvement of sector integration.
Amendment 350 #
Proposal for a regulation
Article 4 – paragraph 3 – point a – point i
Article 4 – paragraph 3 – point a – point i
(i) market integration, including through lifting the isolation of at least one Member State and, reducing energy infrastructure bottlenecks; competition and system flexibility; and reinvestments in existing infrastructure, necessary to maintain current levels of system integration;
Amendment 356 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – introductory part
Article 4 – paragraph 3 – point b – introductory part
(b) for smart electricity grid projects and network components falling under the energy infrastructure category set out in point (1)(d) and (1)(e) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable energy into the grid, and at least two of the following specific criteria:
Amendment 361 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point ii
Article 4 – paragraph 3 – point b – point ii
(ii) market integration, including through efficient system operation and, use of interconnectors; and reinvestments in existing infrastructure; necessary to maintain operational conditions;
Amendment 363 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point iii a (new)
Article 4 – paragraph 3 – point b – point iii a (new)
(iii a) sector integration, through the improvement of the interaction of different energy vectors or energy sectors, for instance through the increase of synergies in adjacent sectors, such as transport and mobility;
Amendment 368 #
Proposal for a regulation
Recital 33
Recital 33
(33) In order to simplify and expedite the permitting process for offshore grids for renewable energy, the Member States around a particular sea basin should endeavour to harmonise the relevant legislation and procedures and create one unique points of contact, referred to as an ‘offshore one-stop shop’, in view of regional specificities and geography, for the for facilitating, integrating and coordinating the process of granting of permits toall permit granting procedures of such projects. Moreover, the establishment of a one-stop shop per sea basin for offshore grids for renewable energy should reduce complexity, increase efficiency and speed up the permitting process of offshore transmission assets often crossing many jurisdictions. It shall issue comprehensive decisions for these projects on behalf of the relevant national Member States in a coordinated, collaborative or integrated manner.
Amendment 404 #
Proposal for a regulation
Article 1 – paragraph 2 – point a
Article 1 – paragraph 2 – point a
(a) addresses the identification of projects of common interest necessary to implement priority corridors and areas falling under the energy infrastructure categories in electricity, smart gas gridsdistrict heating and cooling, hydrogen, electrolysers, and carbon dioxide set out in Annex II (‘energy infrastructure categories’);
Amendment 418 #
Proposal for a regulation
Article 4 – paragraph 3 – point f a (new)
Article 4 – paragraph 3 – point f a (new)
(f a) for district heating and cooling networks falling under the energy infrastructure category set out in point [6 new] of Annex II the project is to contribute significantly to sustainability and to reaching the climate targets 2030 as well as climate neutrality 2050 through a reduction of greenhouse gas emissions as well as an increase of the share of renewable energy in the heating and cooling sector, as well as a better integration and interlinking of the sectors.
Amendment 421 #
Proposal for a regulation
Article 2 – paragraph 1 – point 9
Article 2 – paragraph 1 – point 9
Amendment 431 #
Proposal for a regulation
Article 2 – paragraph 1 – point 9 a (new)
Article 2 – paragraph 1 – point 9 a (new)
(9a) ‘district heating and cooling networks’ means an efficient network in line with the energy efficiency first principle which uses carbon free heat systems, such as geothermal or solar thermal heat, biofuels, or the use of waste heat and cold pursuant to the definition of (EU)2018/2001.
Amendment 460 #
Proposal for a regulation
Article 8 – paragraph 6
Article 8 – paragraph 6
6. By [31 July 2022] and for each specific Regional Group per priority offshore grid corridor, as defined in Annex I, national competent authorities in Member States belonging to the respective Group, shall jointly create one unique points of contact per priority offshore grid corridor, ‘offshore one-stop shops’, for project promoters, which shall be. The offshore one-stop shop shall, without prejudice to relevant requirements under international and Union law, facilitate the issuing of the comprehensive decision. The comprehensive decision shall be the final proof that the project of common interest has achieved ready-to-build status and there shall be no other requirements for any additional permits or authorisations in that respect. The comprehensive decision shall be issued within the time limit referred to in Article 10(1) and (2) and in accordance with schemes similar to those laid out in Article 8 Paragraph 3. The offshore one-stop shall be further responsible for facilitating and coordinating the permit granting process for offshore grids for renewable energy projects of common interest, taking into account also the need for coordination between the permitting process for the energy infrastructure and the one for the generation assets. The offshore one-stop shops shall act as a repository of existing sea basin studies and plans, aiming at facilitating the permitting process of individual projects of common interest and coordinate the issuance of the comprehensive decisions for such projects by the relevant national competent authorities. Each Regional Group per priority offshore grid corridor, with the assistance of the national competent authorities in the Members States belonging to the Group, shall set-up the offshore one-stop shops depending on regional specificities and geography and determine their location, resource allocation and specific rules for their functioning.
Amendment 473 #
Proposal for a regulation
Article 10 – paragraph 1 – point a – introductory part
Article 10 – paragraph 1 – point a – introductory part
(a) the pre-application procedure, covering the period between the start of the permit granting process and the acceptance of the submitted application file by the competent authority, shall take place within an indicative period of two years.
Amendment 480 #
Proposal for a regulation
Article 10 – paragraph 2 – introductory part
Article 10 – paragraph 2 – introductory part
2. The competent authority shall ensure that the combined duration of the two procedures referred to in paragraph 1 does not exceed a period of three years and six months. However, where the competent authority considers that one or both of the two procedures of the permit granting process will not be completed within the time limits set out in paragraph 1, it may decide, before their expiry and on a case by case basis, to extend one or both of those time limits by a maximum of nine months for both procedures combined. The Commission should monitor the permitting process more closely and in case of any delay the European Commission shall be notified immediately by the competent authority, whereas the latter shall duly justify the delay.
Amendment 518 #
Proposal for a regulation
Article 4 – paragraph 3 – point a – point i
Article 4 – paragraph 3 – point a – point i
(i) market integration, including through lifting the isolation of at least one Member State and, reducing energy infrastructure bottlenecks; competition and system flexibility; and reinvestments in existing infrastructure, necessary to maintain current levels of system integration;
Amendment 521 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – introductory part
Article 4 – paragraph 3 – point b – introductory part
(b) for smart electricity grid projects and network components falling under the energy infrastructure category set out in point (1)(d) and (1)(e) of Annex II, the project is to contribute significantly to sustainability through the integration of renewable energy into the grid, and at least two of the following specific criteria:
Amendment 523 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point ii
Article 4 – paragraph 3 – point b – point ii
(ii) market integration, including through efficient system operation and, use of interconnectors and reinvestments in existing infrastructure; necessary to maintain operational conditions;
Amendment 524 #
Proposal for a regulation
Article 4 – paragraph 3 – point b – point iii a (new)
Article 4 – paragraph 3 – point b – point iii a (new)
(iiia) sector integration, through the improvement of the interaction of different energy vectors or energy sectors, for instance through the increase of synergies in adjacent sectors, such as transport and mobility;
Amendment 595 #
Proposal for a regulation
Article 4 – paragraph 5 – subparagraph 2
Article 4 – paragraph 5 – subparagraph 2
Amendment 600 #
Proposal for a regulation
Article 5 – paragraph 1 – point a
Article 5 – paragraph 1 – point a
(a) feasibility and design studies including, as regards, climate mitigation and adaptation and compliance with environmental legislation and with the principle of “do no significant harm”;
Amendment 607 #
Proposal for a regulation
Article 5 – paragraph 4 – subparagraph 1 – point a
Article 5 – paragraph 4 – subparagraph 1 – point a
(a) the progress achieved in the development, construction and commissioning of the project, in particular with regard to permit granting and consultation procedures as well as compliance with environmental legislation, with the principle that the project “does not do significant harm” to the environment, and climate mitigation and adaptation measures taken;
Amendment 621 #
Proposal for a regulation
Article 8 – paragraph 6
Article 8 – paragraph 6
6. By [31 July 2022] and for each specific Regional Group per priority offshore grid corridor, as defined in Annex I, national competent authorities in Member States belonging to the respective Group, shall jointly create one unique points of contact per priority offshore grid corridor, ‘offshore one-stop shops’, for project promoters, which shall be. The offshore one-stop shop shall, without prejudice to relevant requirements under international and Union law, facilitate the issuing of the comprehensive decision. The comprehensive decision shall be the final proof that the project of common interest has achieved ready-to-build status and there shall be no other requirements for any additional permits or authorisations in that respect. The comprehensive decision shall be issued within the time limit referred to in Article 10(1) and (2) and in accordance with schemes similar to those laid out in Article 8 Paragraph 3. The offshore one-stop shall be further responsible for facilitating and coordinating the permit granting process for offshore grids for renewable energy projects of common interest, taking into account also the need for coordination between the permitting process for the energy infrastructure and the one for the generation assets. The offshore one-stop shops shall act as a repository of existing sea basin studies and plans, aiming at facilitating the permitting process of individual projects of common interest and coordinate the issuance of the comprehensive decisions for such projects by the relevant national competent authorities. Each Regional Group per priority offshore grid corridor, with the assistance of the national competent authorities in the Members States belonging to the Group, shall set-up the offshore one-stop shops depending on regional specificities and geography and determine their location, resource allocation and specific rules for their functioning.
Amendment 625 #
Proposal for a regulation
Article 10 – paragraph 1 – point a – introductory part
Article 10 – paragraph 1 – point a – introductory part
(a) the pre-application procedure, covering the period between the start of the permit granting process and the acceptance of the submitted application file by the competent authority, shall take place within an indicative period of two years.
Amendment 630 #
Proposal for a regulation
Article 10 – paragraph 2 – introductory part
Article 10 – paragraph 2 – introductory part
2. The competent authority shall ensure that the combined duration of the two procedures referred to in paragraph 1 does not exceed a period of three years and six months. However, where the competent authority considers that one or both of the two procedures of the permit granting process will not be completed within the time limits set out in paragraph 1, it may decide, before their expiry and on a case by case basis, to extend one or both of those time limits by a maximum of nine months for both procedures combined. The Commission should monitor the permitting process more closely and in case of any delay the European Commission shall be notified immediately by the competent authority, whereas the latter shall duly justify the delay.
Amendment 631 #
Proposal for a regulation
Article 14 – paragraph 2
Article 14 – paragraph 2
2. By [31 July 2023] the ENTSO for Electricity, with the involvement of the relevant TSOs, the national regulatory authorities and of the Commission and in line with the agreement referred to in paragraph 1, shall develop and publish integrated offshore network development plans starting from the 2050 objectives, with intermediate steps for 2030 and 2040, for each sea-basin, in line with the priority offshore grid corridors referred to in Annex I, taking into account environmental protection and other uses of the sea. Those integrated offshore network development plans shall thereafter be updated every threewo years.
Amendment 632 #
Proposal for a regulation
Article 14 – paragraph 3
Article 14 – paragraph 3
3. The integrated offshore network development plans shall be compatible with the latest Union-wide ten-Year Network Development Plans in order to ensure coherent development of onshore and offshore grid planning providing for an adequate and reliable transmission grid for transfer of electricity onshore as well as between coastal regions, regions inland, and landlocked Member States and to provide for a stable supply of electricity to centres of consumption or energy storage facilities.
Amendment 639 #
Proposal for a regulation
Article 11 – paragraph 1 – introductory part
Article 11 – paragraph 1 – introductory part
1. By [16 November 2022], the European Network of Transmission System Operators (ENTSO) for Electricity and the ENTSO for Gas shall publish and submit to Member States, the Commission, the European Parliament and the Agency their respective methodologiesy, including the network and market modelling, for a harmonised energy system-wide life-cycle cost-benefit analysis at Union level for projects of common interest falling under the categories set out in points (1)(a), (b), (ba), (c) and (e) and point (3) of Annex II.
Amendment 643 #
Proposal for a regulation
Article 11 – paragraph 1 – subparagraph 1
Article 11 – paragraph 1 – subparagraph 1
Those methodologiesy shall be applied for the preparation of each subsequent Union– wide ten-year network development plans developed by the ENTSO for Electricity or the ENTSO for Gas pursuant to Article 8 of Regulation (EC) No 715/2009 and Article 30 of Regulation (EU) 2019/943. Those methodologiesy shall be drawn up in line with the principles laid down in Annex V and be consistent with the rules and indicators set out in Annex IV.
Amendment 646 #
Proposal for a regulation
Article 11 – paragraph 1 – subparagraph 2
Article 11 – paragraph 1 – subparagraph 2
Prior to submitting their respective methodologiesy, the ENTSO for Electricity and the ENTSO for Gas shall conduct an extensive consultation process involving at least the organisations representing all relevant stakeholders, including the entity of distribution system operators in the Union (‘EU DSO entity’), all relevant hydrogen stakeholders, all relevant district heating and cooling stakeholders, all relevant carbon capture, storage and transportation stakeholders and, where it is deemed appropriate the national regulatory authorities and other national authorities.
Amendment 652 #
Proposal for a regulation
Article 11 – paragraph 2
Article 11 – paragraph 2
2. Within three months of the receipt of the methodologiesy together with the input received in the consultation process and a report on how it was taken into account, the Agency shall provide an opinion to the ENTSO for Electricity, the ENTSO for Gas, the Member States, and the Commission and publish it on the Agency’s website.
Amendment 658 #
Proposal for a regulation
Article 11 – paragraph 3
Article 11 – paragraph 3
3. The ENTSO for Electricity and the ENTSO for Gas, shall update the methodologiesy taking due account of the Agency’s opinion, as referred to in paragraph 2, and submit them to the Commission for its opinion.
Amendment 663 #
Proposal for a regulation
Article 11 – paragraph 4
Article 11 – paragraph 4
4. Within three months of the day of receipt of the updated methodologies, the Commission shall submit its opinion to the ENTSO for Electricity and the ENTSO for Gas.
Amendment 703 #
Proposal for a regulation
Article 11 – paragraph 11
Article 11 – paragraph 11
11. By [31 December 2023], the ENTSO for Electricity and the ENTSO for Gas shall jointlyshall submit to the Commission and the Agency a consistent and interlinked energy market and network model including electricity, gasdistrict heating and cooling networks, carbon capture, storage and transportation and hydrogen transmission infrastructure as well as storage, LNG and electrolysers, covering the energy infrastructure priority corridors and the areas drawn up in line with the principles laid down in Annex V.
Amendment 728 #
Proposal for a regulation
Article 12 – paragraph 1 – subparagraph 1
Article 12 – paragraph 1 – subparagraph 1
The guidelines shall include the energy efficiency first principle and ensure that the underlying ENTSO for Electricity and ENTSO for Gas scenarios are fully in line with the latest medium and long-term European Union decarbonisation targets and the latest available Commission scenarios.
Amendment 735 #
Proposal for a regulation
Article 12 – paragraph 2
Article 12 – paragraph 2
2. The ENTSO for Electricity and ENTSO for Gas shall follow the Agency’s framework guidelines when developing the joint scenarios to be used for the Union- wide ten-year network development plans.
Amendment 741 #
Proposal for a regulation
Article 12 – paragraph 3
Article 12 – paragraph 3
3. The ENTSO for Electricity and ENTSO for Gas shall invite the organisations representing all relevant stakeholders, including the Union DSO entity and all relevant district heating and cooling stakeholders, all relevant carbon capture, storage and transportation stakeholders and all relevant hydrogen stakeholders, to participate in the scenarios development process.
Amendment 744 #
Proposal for a regulation
Article 12 – paragraph 4
Article 12 – paragraph 4
4. The ENTSO for Electricity and the ENTSO for Gas shall publish and submit the draft joint scenarios report to the Agency and the Commission for their opinion.
Amendment 751 #
Proposal for a regulation
Article 12 – paragraph 5
Article 12 – paragraph 5
5. Within three months from the receipt of the draft joint scenarios report together with the input received in the consultation process and a report on how it was taken into account, the Agency shall submit its opinion to the ENTSO for Electricity, ENTSO for gas and the Commission.
Amendment 757 #
6. The Commission, giving due consideration to the Agency opinion defined under paragraph 5, shall submit its opinion to the ENTSO for Electricity and the ENTSO for Gas.
Amendment 776 #
Proposal for a regulation
Article 13 – paragraph 1 – introductory part
Article 13 – paragraph 1 – introductory part
1. Every two years the ENTSO for Electricity and the ENTSO for Gas shall publish and submit to the Commission and the Agency the infrastructure gaps reports developed within the framework of the Union-wide ten-year network development plans.
Amendment 777 #
Proposal for a regulation
Annex I – Part 1 – point 3 – paragraph 1
Annex I – Part 1 – point 3 – paragraph 1
Member States concerned: Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Netherlands Poland and Sweden.
Amendment 779 #
Proposal for a regulation
Annex I – Part 2 – point 4 – introductory part
Annex I – Part 2 – point 4 – introductory part
(4) Northern Seas offshore grids (‘NSOG’): integrated offshore electricity and hydrogen grids development and the related interconnectors in the North Sea, the Irish Sea, the English Channel and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 780 #
Proposal for a regulation
Annex I – Part 2 – point 5 – introductory part
Annex I – Part 2 – point 5 – introductory part
(5) Baltic Energy Market Interconnection Plan offshore grids (‘BEMIP offshore’): integrated offshore electricity and hydrogen grids development and the related interconnectors in the Baltic Sea and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 780 #
Proposal for a regulation
Article 13 – paragraph 1 – subparagraph 1
Article 13 – paragraph 1 – subparagraph 1
When assessing the infrastructure gaps the ENTSO for Electricity and the ENTSO for Gas shall implement the energy efficiency first principle and consider with priority all relevant non- infrastructure related solutions to address the identified gaps.
Amendment 781 #
Proposal for a regulation
Annex I – Part 2 – point 6 – introductory part
Annex I – Part 2 – point 6 – introductory part
(6) South and East offshore grids: integrated offshore electricity and hydrogen grids development and the related interconnectors in the Mediterranean Sea, Black Sea and neighbouring waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 785 #
Proposal for a regulation
Annex I – Part 2 – point 7 – introductory part
Annex I – Part 2 – point 7 – introductory part
(7) South Western Europe offshore grids: integrated offshore electricity and hydrogen grids development and the related interconnectors in the North Atlantic Ocean waters to transport electricity and hydrogen from renewable offshore energy sources to centres of consumption and storage and to increase cross-border electricitrenewable energy exchange.
Amendment 789 #
Proposal for a regulation
Article 13 – paragraph 1 – subparagraph 2
Article 13 – paragraph 1 – subparagraph 2
Prior to submitting their respectiveits reports, the ENTSO for Electricity and the ENTSO for Gas shall conduct an extensive consultation process involving all relevant stakeholders, including the Union DSO entity, all relevant district heating and cooling stakeholders, all relevant carbon capture, storage and transportation stakeholders and all relevant hydrogen stakeholders and all the Member States representatives part of the priority corridors defined in Annex I.
Amendment 794 #
Proposal for a regulation
Article 13 – paragraph 2
Article 13 – paragraph 2
2. The ENTSO for Electricity and the ENTSO for Gas shall submit their respectiveshall submit its draft infrastructure gaps report to the Agency and the Commission for their opinion.
Amendment 799 #
Proposal for a regulation
Article 13 – paragraph 3
Article 13 – paragraph 3
3. Within three months following receipt of the infrastructure gaps report together with the input received in the consultation process and a report on how it was taken into account, the Agency shall submit its opinion to the ENTSO for Electricity or ENTSO for Gas and the Commission.
Amendment 804 #
Proposal for a regulation
Article 13 – paragraph 4
Article 13 – paragraph 4
4. The Commission, considering the Agency’s opinion referred to in paragraph 3, shall draft and submit its opinion to the ENTSO for Electricity or the ENTSO for Gas.
Amendment 805 #
Proposal for a regulation
Annex I – Part 4 – point 11 – introductory part
Annex I – Part 4 – point 11 – introductory part
(11) Smart electricity grids deployment: adoption of smart grid technologies across the Union to efficiently integrate the behaviour and actions of all users connected to the electricity network, in particular the generation of large amounts of electricity from renewable or distributed energy sources and demand response by consumers, energy storage.
Amendment 809 #
Proposal for a regulation
Article 13 – paragraph 5
Article 13 – paragraph 5
5. The ENTSO for Electricity and the ENTSO for Gas shall adapt their infrastructure gaps reports taking due account of the Agency’s opinion and in line with the Commission’s opinion before the publication of the final infrastructure gaps reports.
Amendment 816 #
Proposal for a regulation
Annex I – Part 4 – point 13 a (new)
Annex I – Part 4 – point 13 a (new)
(13 a) District Heating and Cooling:Upgrading and consolidation of district heating and district cooling networks to ensure a decarbonised supply of heat and cold and increase these sectors, as well as applying the energy efficiency first principle and sector integration through the use of waste heat and increasing flexibility for the energy system through power-to-heat. Member States concerned: all
Amendment 816 #
Proposal for a regulation
Article 14 – paragraph 2
Article 14 – paragraph 2
2. By [31 July 2023] the ENTSO for Electricity, with the involvement of the relevant TSOs, the national regulatory authorities and of the Commission and in line with the agreement referred to in paragraph 1, shall develop and publish integrated offshore network development plans starting from the 2050 objectives, with intermediate steps for 2030 and 2040, for each sea-basin, in line with the priority offshore grid corridors referred to in Annex I, taking into account environmental protection and other uses of the sea. Those integrated offshore network development plans shall thereafter be updated every threewo years.
Amendment 821 #
Proposal for a regulation
Article 14 – paragraph 3
Article 14 – paragraph 3
3. The integrated offshore network development plans shall be compatible with the latest Union-wide ten-Year Network Development Plans in order to ensure coherent development of onshore and offshore grid planning providing for an adequate and reliable transmission grid for transfer of electricity onshore as well as between coastal regions, regions inland, and landlocked Member States and to provide for a stable supply of electricity to centres of consumption or energy storage facilities.
Amendment 826 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point b
Annex II – paragraph 1 – point 1 – point b
(b) electricitnergy storage facilities used for storing electricitnergy on a permanent or temporary basis in above-ground or underground infrastructure or geological sites, provided they are directly connected to high-voltage transmission lines designed for a voltage of 110 kV or more; deferring the final use of electricity to a later moment than when it was generated or the conversion of electrical energy into a form of energy which can be stored, the storing of that energy, and the subsequent reconversion of that energy back into electrical energy or use as another energy carrier;
Amendment 829 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point b a (new)
Annex II – paragraph 1 – point 1 – point b a (new)
(b a) charging infrastructure for electric vehicles;
Amendment 835 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point d
Annex II – paragraph 1 – point 1 – point d
(d) systems and components integrating ICT, through operational digital platforms, control systems and sensor technologies both at transmission and, medium and low voltage distribution level, aiming at a more efficient and intelligent electricity transmission and distribution network, increased capacity to integrate new forms of generation, storage and consumption and facilitating new business models and market structures;
Amendment 838 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point e a (new)
Annex II – paragraph 1 – point 1 – point e a (new)
(e a) equipment, installation or network components that contribute to operational security or increased voltage quality by providing ancillary services, remedial actions or other services necessary for electricity system defence and restoration, including services providing inertia, synthetic inertia, fault current injection, grid forming capacities, voltage regulation, frequency regulation, protection, monitoring and control systems at all voltage levels and substations;
Amendment 841 #
Proposal for a regulation
Annex II – paragraph 1 – point 2 – point a
Annex II – paragraph 1 – point 2 – point a
(a) any of the following equipment or installation aiming at enabling and facilitating the integration of renewable and low-carbon gases with a carbon threshold of which the life cycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council. Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU)2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1 taking into account the carbon intensity of the electricity in the country of production for electricity use. Quantified life-cycle GHG emission savings are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party, (including biomethane or hydrogen) into the network: digital systems and components integrating ICT, control systems and sensor technologies to enable the interactive and intelligent monitoring, metering, quality control and management of gas production, transmission, distribution and consumption within a gas network. Furthermore, such projects may also include equipment to enable reverse flows from the distribution to the transmission level and related necessary upgrades to the existing network.
Amendment 856 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, for hydrogen in gaseous or liquid state, excluding pipelines for the local distribution of hydrogen;
Amendment 867 #
Proposal for a regulation
Article 16 – paragraph 10
Article 16 – paragraph 10
10. By [31 December 2022], the Commission shall adopt implementing acts containing binding guidelines to ensure uniform conditions for the implementation of this Article and the offshore grids for renewable energy cross-border cost sharing as referred to in Article 15(1). The guidelines shall also address the special situation of offshore grids for renewable energy projects of common interest by including principles on how their cross- border cost allocation shall be coordinated with the financing, market and political arrangements of offshore generation sites connected to them. In adopting or amending the guidelines, the Commission shall consult ACER, the ENTSO for Electricity, the ENTSO for Gas, and, where relevant, other stakeholders. Those implementing acts shall be adopted in accordance with the advisory procedure referred to in Article 21(2).
Amendment 873 #
(c a) storage facilities connected to the electricity networks that enable integration with electricity sectors, enabling the operations of the energy systems across multiple energy carriers ;
Amendment 891 #
Proposal for a regulation
Annex II – paragraph 1 – point 4 – point a
Annex II – paragraph 1 – point 4 – point a
(a) electrolysers that: (i) have at least 100 MW capacity, (ii) the production complies with the life cycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council.60 Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU) 2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1 taking into account the carbon intensity of the electricity in the country of production. Quantified life-cycle GHG emission savings are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party, and (iii) have also a network-related function; _________________ 60 OJ L 328, 21.12.2018, p. 82.
Amendment 906 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b
Annex II – paragraph 1 – point 5 – point b
(b) facilities for liquefaction and buffer storage of carbon dioxide in view of its further transportation. This does not include infrastructure within a geological formation used for the permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC and associated surface and injection facilities;
Amendment 911 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b a (new)
Annex II – paragraph 1 – point 5 – point b a (new)
(b a) equipment and infrastructure within a geological formation used for the permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC and associated surface and injection facilities;
Amendment 912 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 a (new)
Annex II – paragraph 1 – point 5 a (new)
(5 a) concerning district heating and cooling: district heating and cooling systems meeting the following criteria: (a) at least 1000 MW installed capacity for heating or 100 MW installed capacity for cooling, (b) existence of a district heating network for the transport of hot steam or water or a distribution network for the transport of chilled liquids in at least one of the following categories: low cooling temperature (5-25 degrees Celsius), low temperature (30-40 degrees Celsius), average temperature (40-90 degrees Celsius) or high temperature (from 100 degrees Celsius), (c) heat generators producing heat or waste heat that can be injected in the district heating network pursuant to the definition of ‘waste heat and cold’ of (EU) 2018/2001; ‘highly efficient cogeneration of (EU) 2012/27, geothermal energy, heat pumps or bioenergy;
Amendment 914 #
Proposal for a regulation
Annex I – Part 1 – point 3 – paragraph 1
Annex I – Part 1 – point 3 – paragraph 1
Member States concerned: Denmark, Estonia, Finland, Germany, Latvia, Lithuania, Netherlands Poland and Sweden.
Amendment 921 #
Proposal for a regulation
Annex III – Part 1 – point 1 – introductory part
Annex III – Part 1 – point 1 – introductory part
(1) with regard to energy infrastructure falling under the competency of national regulatory authorities, each Group shall be composed of representatives of the Member States, national regulatory authorities, TSOs, DSOs, as well as the Commission, the Agency and the DSO- Entity and the ENTSO for Electricity or the ENTSO for Gas, as relevant.
Amendment 951 #
Proposal for a regulation
Annex IV – point 1 – introductory part
Annex IV – point 1 – introductory part
(1) a project with significant cross- border impacteffect or cross-border replicability is a project on the territory of a Member State, which fulfils the following conditions:
Amendment 953 #
Proposal for a regulation
Annex IV – point 1 – point a
Annex IV – point 1 – point a
(a) for electricity transmission, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or several other Member States, having the effect of increasing the cross- border grid transfer capacity at the border of that Member State with one or several other Member States, by at least 500 Megawatt compared to the situation without commissioning of the project;
Amendment 957 #
Proposal for a regulation
Annex IV – point 1 – point a a (new)
Annex IV – point 1 – point a a (new)
(a a) for network components that contribute to operational security or increased voltage quality, the project is designed for equipment and installations at high-voltage, medium-voltage or low- voltage level. This includes transmission and distribution system operators or solely distribution system operators from at least two Member States. Projects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 GWH/year, of which at least 20 % originate from variable renewable resources;
Amendment 966 #
Proposal for a regulation
Annex IV – point 1 – point c
Annex IV – point 1 – point c
(c) for smart electricity grids, the project is designed for equipment and installations at high-voltage and, medium- voltage and low-voltage level. It involves transmission system operators, transmission and distribution system operators or solely distribution system operators from at least two Member States. DProjects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project and ensure interoperability. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 Gigawatthours/year, of which at least 20 % originate from variable renewable resources ;
Amendment 977 #
Proposal for a regulation
Annex IV – point 1 – point g
Annex IV – point 1 – point g
(g) for smart gas grids, a project involves transmission system operators, transmission and distribution system operators or solely distribution system operators from at least two Member States. DProjects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project and ensure interoperability.
Amendment 980 #
Proposal for a regulation
Annex IV – point 1 – point g a (new)
Annex IV – point 1 – point g a (new)
(g a) for district heating and cooling the project has at least 1000 Megawatt heat production capacity or 100 Megawatt cooling capacity.
Amendment 980 #
Proposal for a regulation
Annex I – Part 4 – point 13
Annex I – Part 4 – point 13
Amendment 983 #
Proposal for a regulation
Annex IV – point 2 – point a
Annex IV – point 2 – point a
(a) for projects of mutual interest in the category set out in point (1)(a) and (e) of Annex II, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or more third countries and brings significant benefits, under the specific criteria listed in in Article 4(3), to at least two Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Electricity in the frame of Union-wide ten-year network development plan;
Amendment 994 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point d
Annex II – paragraph 1 – point 1 – point d
(d) systems and components integrating ICT, through operational digital platforms, control systems and sensor technologies both at transmission and, medium and low voltage distribution level, aiming at a more efficient and intelligent electricity transmission and distribution network, increased capacity to integrate new forms of generation, storage and consumption and facilitating new business models and market structures;
Amendment 995 #
Proposal for a regulation
Annex II – paragraph 1 – point 1 – point e a (new)
Annex II – paragraph 1 – point 1 – point e a (new)
(ea) equipment, installation or network components that contribute to operational security or increased voltage quality by providing ancillary services, remedial actions or other services necessary for electricity system defence and restoration, including services providing inertia, synthetic inertia, fault current injection, grid forming capacities, voltage regulation, frequency regulation, protection, monitoring and control systems at all voltage levels and substations;
Amendment 997 #
Proposal for a regulation
Annex II – paragraph 1 – point 2
Annex II – paragraph 1 – point 2
Amendment 998 #
Proposal for a regulation
Annex IV – point 3 – point a – point i
Annex IV – point 3 – point a – point i
(i) calculating, for cross-border projects and reinvestment projects, the impact on the grid transfer capability in both power flow directions, measured in terms of amount of power (in megawatt), and their contribution to reaching the minimum 15% interconnection target, for projects with significant cross-border impact, the impact on grid transfer capability at borders between relevant Member States, between relevant Member States and third countries or within relevant Member States and on demand- supply balancing and network operations in relevant Member States;
Amendment 999 #
Proposal for a regulation
Annex IV – point 3 – point a a (new)
Annex IV – point 3 – point a a (new)
(a a) level of sustainability measured as the greenhouse gas emission savings ;
Amendment 1002 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing new capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
Amendment 1003 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing newthe capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
Amendment 1005 #
Proposal for a regulation
Annex IV – point 3 – point c
Annex IV – point 3 – point c
(c) security of supply, interoperability and secure system operation measured in line with the analysis made in the latest available Union-wide ten-year network development plan in electricity, notably by assessing the impact of the project on the loss of load expectation for the area of analysis as defined in Annex V in terms of generation and transmission adequacy for a set of characteristic load periods, taking into account expected changes in climate- related extreme weather events and their impact on infrastructure resilience, expected changes in the economic and social development of the area and the expected significant increase in power demand from the transport sector, in particular for electric vehicles along highways and in urban areas.. Where applicable, the impact of the project on independent and reliable control of system operation and services shall be measured.
Amendment 1007 #
Proposal for a regulation
Annex IV – point 4 – introductory part
Annex IV – point 4 – introductory part
(4) Concerning projects falling under the category set out in point (1)(d) and (1)(e a new) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:
Amendment 1024 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point a
Annex II – paragraph 1 – point 3 – point a
(a) transmission pipelines for the transport of hydrogen, giving access to multiple network users on a transparent and non-discriminatory basis, which mainly contains high-pressure hydrogen pipelines, for hydrogen in gaseous or liquid state, excluding pipelines for the local distribution of hydrogen;
Amendment 1031 #
Proposal for a regulation
Annex II – paragraph 1 – point 3 – point c a (new)
Annex II – paragraph 1 – point 3 – point c a (new)
(ca) storage facilities connected to the electricity networks that enable integration with electricity sectors, enabling the operations of the energy systems across multiple Energy carriers
Amendment 1050 #
Proposal for a regulation
Annex II – paragraph 1 – point 4 – point a
Annex II – paragraph 1 – point 4 – point a
(a) electrolysers that: (i) have at least 100 MW capacity, (ii) the production complies with the life cycle greenhouse gas emissions savings requirement of 70 % relative to a fossil fuel comparator of 94g CO2e/MJ as set out in Article 25(2) and Annex V of Directive (EU) 2018/2001 of the European Parliament and of the Council.60 Life cycle greenhouse gas emissions savings are calculated using the methodology referred to in Article 28(5) of Directive (EU) 2018/2001 or, alternatively, using ISO 14067 or ISO 14064-1 taking into account the carbon intensity of the electricity in the country of production. Quantified life-cycle GHG emission savings are verified in line with Article 30 of Directive (EU) 2018/2001 where applicable, or by an independent third party, and (iii) have also a network-related function; _________________ 60 OJ L 328, 21.12.2018, p. 82.
Amendment 1064 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b
Annex II – paragraph 1 – point 5 – point b
(b) facilities for liquefaction and buffer storage of carbon dioxide in view of its further transportation. This does not include infrastructure within a geological formation used for the permanent geological storage of carbon dioxide pursuant to Directive 2009/31/EC and associated surface and injection facilities;
Amendment 1066 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 – point b a (new)
Annex II – paragraph 1 – point 5 – point b a (new)
Amendment 1067 #
Proposal for a regulation
Annex II – paragraph 1 – point 5 a (new)
Annex II – paragraph 1 – point 5 a (new)
(5a) concerning district heating and cooling: district heating and cooling systems meeting the following criteria: (a) at least 1000 MW installed capacity for heating or 100 MW installed capacity for cooling, (b) existence of a district heating network for the transport of hot steam or water or a distribution network for the transport of chilled liquids in at least one of the following categories: low cooling temperature (5-25 degrees Celsius), low temperature (30-40 degrees Celsius), average temperature (40-90 degrees Celsius) or high temperature (from 100 degrees Celsius), (c) heat generators producing heat or waste heat that can be injected in the district heating network pursuant to the definition of ‘waste heat and cold’ of (EU) 2018/2001; ‘highly efficient cogeneration of (EU) 2012/27, geothermal energy, heat pumps or bioenergy;
Amendment 1072 #
Proposal for a regulation
Annex III – Part 1 – point 1 – introductory part
Annex III – Part 1 – point 1 – introductory part
(1) with regard to energy infrastructure falling under the competency of national regulatory authorities, each Group shall be composed of representatives of the Member States, national regulatory authorities, TSOs, as well as the Commission, the Agency and the ENTSO for Electricity or the ENTSO for Gas, as relevant.
Amendment 1073 #
Proposal for a regulation
Annex III – Part 1 – point 1 – introductory part
Annex III – Part 1 – point 1 – introductory part
(1) with regard to energy infrastructure falling under the competency of national regulatory authorities, each Group shall be composed of representatives of the Member States, national regulatory authorities, TSOs, DSOs, as well as the Commission, the Agency and the DSO- Entity and the ENTSO for Electricity or the ENTSO for Gas, as relevant.
Amendment 1087 #
Proposal for a regulation
Annex III – Part 2 – point 1 – point c
Annex III – Part 2 – point 1 – point c
(c) for projects having reached a sufficient degree of maturity, a project- specific cost-benefit analysis based on the methodologies developed by the ENTSO for electricity or the ENTSO for gas pursuant to Article 11;
Amendment 1109 #
Proposal for a regulation
Annex IV – point 1 – point a
Annex IV – point 1 – point a
(a) for electricity transmission, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or several other Member States, having the effect of increasing the cross- border grid transfer capacity at the border of that Member State with one or several other Member States, by at least 500 Megawatt compared to the situation without commissioning of the project;
Amendment 1110 #
Proposal for a regulation
Annex IV – point 1 – point a a (new)
Annex IV – point 1 – point a a (new)
(aa) for network components that contribute to operational security or increased voltage quality, the project is designed for equipment and installations at high-voltage, medium-voltage or low- voltage level. This includes transmission and distribution system operators or solely distribution system operators from at least two Member States. Projects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project. A project covers at least 50000 users, generators, consumers or prosumers of electricity, in a consumption area of at least 300 GWH/year, of which at least 20 % originate from variable renewable resources;
Amendment 1117 #
Proposal for a regulation
Annex IV – point 1 – point g
Annex IV – point 1 – point g
Amendment 1123 #
Proposal for a regulation
Annex IV – point 1 – point g
Annex IV – point 1 – point g
(g) for smart gas grids, a project involves transmission system operators, transmission and distribution system operators or solely distribution system operators from at least two Member States. DProjects involving solely distribution system operators without the direct involvement of transmission system operators can be involved only with the support of the transmission system operators in the form of a letter of intent, of at least two Member States, that are closely associated to the project and ensure interoperability.
Amendment 1126 #
Proposal for a regulation
Annex IV – point 1 – point g a (new)
Annex IV – point 1 – point g a (new)
(ga) for district heating and cooling the project has at least 1000 Megawatt heat production capacity or 100 Megawatt cooling capacity
Amendment 1129 #
Proposal for a regulation
Annex IV – point 2 – point a
Annex IV – point 2 – point a
(a) for projects of mutual interest in the category set out in point (1)(a) and (e) of Annex II, the project increases theor ensures maintained grid transfer capacity, or the capacity available for commercial flows, at the border of that Member State with one or more third countries and brings significant benefits, under the specific criteria listed in in Article 4(3), to at least two Member States. The calculation of the benefits for the Member States shall be performed and published by the ENTSO for Electricity in the frame of Union-wide ten-year network development plan;
Amendment 1135 #
Proposal for a regulation
Annex IV – point 3 – point a – point i
Annex IV – point 3 – point a – point i
(i) calculating, for cross-border projects and reinvestment projects, the impact on the grid transfer capability in both power flow directions, measured in terms of amount of power (in megawatt), and their contribution to reaching the minimum 15% interconnection target, for projects with significant cross-border impact, the impact on grid transfer capability at borders between relevant Member States, between relevant Member States and third countries or within relevant Member States and on demand- supply balancing and network operations in relevant Member States;
Amendment 1140 #
Proposal for a regulation
Annex IV – point 3 – point b – point ii
Annex IV – point 3 – point b – point ii
(ii) or electricitnergy storage, comparing newthe capacity provided by the project with total existing capacity for the same storage technology in the area of analysis as defined in Annex V;
Amendment 1143 #
Proposal for a regulation
Annex IV – point 4 – introductory part
Annex IV – point 4 – introductory part
(4) Concerning projects falling under the category set out in point (1)(d) and (1)(e a new) of Annex II, the criteria listed in Article 4 shall be evaluated as follows:
Amendment 1158 #
Proposal for a regulation
Annex IV – point 6
Annex IV – point 6
Amendment 1183 #
Proposal for a regulation
Annex V – point 1
Annex V – point 1
(1) the area for the analysis of an individual project shall cover all Member States and third countries, on whose territory the project is located, all directly neighbouring Member States and all other Member States significantly impacted by the project. For this purpose, ENTSO for electricity and ENTSO for gas shall cooperate with all the relevant system operators in the relevant third countries.
Amendment 1196 #
Proposal for a regulation
Annex V – point 8
Annex V – point 8
(8) it shall ensure that the climate mitigation and adaptation measures taken for each project are assessed and reflect the cost of greenhouse gas emissions in a consistent manner with other Union policies.