Amendment 107 #
Proposal for a regulation
Article 1 – paragraph 1 – point 16 a (new)
Article 1 – paragraph 1 – point 16 a (new)
Amendment 114 #
Proposal for a regulation
Article 2 – paragraph 3 – subparagraph 1
Article 2 – paragraph 3 – subparagraph 1
3. Where a leakage of thosee SF6 gases is detected, the operators shall ensure that the equipment is repaired without undue delay., as long as the service security and the technical conditions allow it and that the environmental impact of this repair is acceptable (lower than in the case of no repair during the probable remaining lifetime of the equipment)
Amendment 157 #
Proposal for a regulation
Article 5 – paragraph 1 – subparagraph 2
Article 5 – paragraph 1 – subparagraph 2
This paragraph shall apply to operators of electrical switchgear that contains SF6 and of the equipment referred to in Article 3(2). In the case of hermetically sealed SF6 MV Switchgear only (a) and (g) shall apply.
Amendment 173 #
Proposal for a regulation
Article 8 – paragraph 1 – point b
Article 8 – paragraph 1 – point b
(b) pPersons who handle SF6 when installing , serviceing, maintain, repairing or decommissioning electrical sSwitchgear that contains SF6;
Amendment 275 #
Proposal for a regulation
Article 13 – paragraph 4 a (new)
Article 13 – paragraph 4 a (new)
4a. Existing producers or importers who already place hydrofluorocarbons on the market in the Union for the purpose of supplying manufacturers that use HFCs as a process gas in the production of semiconductors shall be excluded from the phase down in article 13 (1) so long as the HFCs are placed solely on the market for use in the production of semiconductors and that use is verified with supporting documentation.