17 Amendments of Marian-Jean MARINESCU related to 2013/0082(COD)
Amendment 23 #
Proposal for a regulation
Recital 6
Recital 6
(6) Data and information regarding foreseeable developments in production, transmission and storage capacities and projects in the various energy sectors are of interest to the Union and important to future investment. It is therefore necessary to ensure that the Commission is notified of investment projects on which construction or decommissioning work has started or on which a final investment decision has been taken. In order to clarify the stage when the notification of planned investment projects should be made, the present regulation should cover only those projects which are approved to be built by the competent authority, and thus have been granted the necessary authorization.
Amendment 29 #
Proposal for a regulation
Recital 15
Recital 15
(15) The Commission and in particular its Market Observatory for Energy should provide a regular and cross-sector analysis of the structural evolution and perspectives of the Union energy system and, where appropriate, more focused analysis on certain aspects of this energy system. This analysis should in particular contribute to enhancing energy security by identifying possible infrastructure and investment gaps and associated risks in view of an energy supply and demand balance and should complement national approaches, by developing regional dimensions. The analysis should also form a contribution to a discussion at Union level about energy infrastructures and should therefore be forwarded to the European Parliament, the Council and the European Economic and Social Committee and made available to interested parties.
Amendment 30 #
Proposal for a regulation
Recital 15 a (new)
Recital 15 a (new)
(15a) Small and medium-sized enterprises should be able to benefit from the monitoring tool for investment projects resulting from this Regulation which will make the collected data publicly available and, in the long term, contribute to new and better coordinated investments.
Amendment 31 #
Proposal for a regulation
Recital 16
Recital 16
(16) The Commission may be assisted by experts from Member States or any other competent experts,; with a view to developing a common understanding of potential infrastructure gaps and associated risks and to fostering transparency regarding future developments. which is of particular interest for new market entrants.
Amendment 32 #
Proposal for a regulation
Recital 16 a (new)
Recital 16 a (new)
(16a) Given the reporting of investment projects at regular intervals, the Commission should provide an analysis to the Member States notifying the measures necessary to reduce risks of underinvestment or inadequacy of investments.
Amendment 40 #
Proposal for a regulation
Article 2 – paragraph 1 – point 2 – introductory part
Article 2 – paragraph 1 – point 2 – introductory part
2. ‘investment projects’ means projects which are authorized by the competent authorities and aiming at:
Amendment 42 #
Proposal for a regulation
Article 2 – paragraph 1 – point 7 a (new)
Article 2 – paragraph 1 – point 7 a (new)
(7a) ‘capture’ means the process of capturing carbon dioxide from industrial installations for storage purposes;
Amendment 44 #
Proposal for a regulation
Article 2 – paragraph 1 – point 11 a (new)
Article 2 – paragraph 1 – point 11 a (new)
(11a) ‘aggregated data’ means data aggregated on a national or regional level. If aggregation on a national level would reveal commercially sensitive information of an individual undertaking, aggregation on a regional level may be done. The appropriate regional level shall be decided by the Commission upon a joint proposal of the concerned Member States or their delegated entities;
Amendment 49 #
Proposal for a regulation
Article 5 – paragraph 1 – point b a (new)
Article 5 – paragraph 1 – point b a (new)
(ba) the dates on which necessary construction authorisations and permits were granted;
Amendment 54 #
Proposal for a regulation
Article 6 – paragraph 2
Article 6 – paragraph 2
2. The Commission may publish aggregated data and information forwarded pursuant to this Regulation, in particular in analyses referred to in Article 10(3), provided that the data and information are published in an aggregated form at national or regional level and that no details concerning individual undertakings and installations are disclosed or can be inferred.
Amendment 60 #
Proposal for a regulation
Article 10 – paragraph 1 – subparagraph 1 – point c a (new)
Article 10 – paragraph 1 – subparagraph 1 – point c a (new)
(ca) monitoring EU investment projects in third countries having an impact on the EU energy market and security.
Amendment 61 #
Proposal for a regulation
Article 10 – paragraph 1 – subparagraph 1 – point c b (new)
Article 10 – paragraph 1 – subparagraph 1 – point c b (new)
(cb) analysing the evolution of the investment projects from the time of their authorisation to the present stage;
Amendment 62 #
Proposal for a regulation
Article 10 – paragraph 2 – subparagraph 2 a (new)
Article 10 – paragraph 2 – subparagraph 2 a (new)
The Commission shall provide an analysis to the Member States notifying the measures necessary to reduce risks of underinvestment or inadequacy of investments.
Amendment 64 #
Proposal for a regulation
Article 11 – paragraph 1 a (new)
Article 11 – paragraph 1 a (new)
In order to improve the quality of data, the review may reconsider minimum thresholds set out in the appendix of the proposed regulation, as well as specify in a template the main characteristics of infrastructure or capacities planned or under construction.
Amendment 74 #
Proposal for a regulation
Annex 1 – point 3.1 – indent 6
Annex 1 – point 3.1 – indent 6
– concentrated solar thermal and geothermal installations (with a capacity of 210 MW or more),
Amendment 77 #
Proposal for a regulation
Annex 1 – point 3.1 – indent 7
Annex 1 – point 3.1 – indent 7
– photovoltaic installations (with a capacity of 105 MW or more).
Amendment 82 #
Proposal for a regulation
Annex 1 – point 5.1 a (new)
Annex 1 – point 5.1 a (new)
(5.1a) Capture - CO2 capture installations connected to the production installations referred to in points 1.1 and 3.1 (where there is the case) with a capturing capacity of 100 kt/ year or more.