BETA

5 Amendments of Adina VĂLEAN related to 2011/0172(COD)

Amendment 386 #
Proposal for a directive
Article 2 – paragraph 1 – point 11 a (new)
11 a. "demand response" means changes in electric usage by end-use customers/micro generators from their current/normal consumption/injection patterns in response to changes in the price of electricity over time, or to incentive payments designed to adjust electricity usage or in response to acceptance of the consumer’s bid, alone or through aggregation, to sell demand reduction at a price in an organized electricity markets or to a retail provider;
2011/11/16
Committee: ITRE
Amendment 1338 #
Proposal for a directive
Article 12 – paragraph 1 – subparagraph 2 a (new)
Member States shall ensure that national energy regulatory authorities encourage demand side resources, such as demand response, to participate in a non- discriminatory manner alongside supply in local or regional energy markets. If necessary Member States shall require national regulatory authorities and TSOs to define technical specifications for participation in energy and tertiary reserve markets, on the basis of the technical requirements of these markets and demand response capabilities. The potential of demand response should be taken fully into account when implementing national capacity adequacy or other energy security related measures.
2011/11/18
Committee: ITRE
Amendment 1354 #
Proposal for a directive
Article 12 – paragraph 4
4. Member States shall ensure the removal of those incentives in transmission and distribution tariffs that unnecessarily increase the volume of distributed or transmitted energy, or those that might hamper participation of demand response, including service aggregators, in balancing and ancillary services. In particular, transmission and distribution tariffs shall be designed to reward network operators for improved efficiency in infrastructure design and operation, while removing incentives for increased throughput volumes, and while continuing to provide appropriate price signals and energy savings incentives to final customers. In this respect, in accordance with Article 3(2) of Directive 2009/72/EC and Article 3(2) of Directive 2009/73/EC, Member States may impose public service obligations relating to energy efficiency on undertakings operating in the electricity and gas sectors.
2011/11/18
Committee: ITRE
Amendment 1363 #
Proposal for a directive
Article 12 – paragraph 4 a (new)
4 a. Member States shall adopt measures and guidelines for the promotion and deployment of demand response for industrial, commercial and residential sites and buildings, in particular as regards integration of demand-side resources into regional electricity markets and their connection to the energy grid, in the context of the future national action plans for the implementation of smart grids.
2011/11/18
Committee: ITRE
Amendment 1393 #
Proposal for a directive
Article 12 – paragraph 6 – subparagraph 1
Member States shall take the appropriate steps to ensure that, where this is consistent with the mode of operation of the high-efficiency cogeneration installation, high-efficiency cogeneration operators and demand response aggregators can offer balancing services and other operational services at the level of transmission system operators or distribution system operators where this is consistent with the mode of operation of the high-efficiency cogeneration installation. Transmission system operators and distribution system operators shall ensure that such services are part of a services bidding process which is transparent and open to scrutiny.
2011/11/18
Committee: ITRE