BETA

Activities of Dominique VLASTO related to 2007/0199(COD)

Plenary speeches (1)

Conditions for access to the natural gas transmission networks - Internal market in natural gas - European strategic energy technology plan (debate)
2016/11/22
Dossiers: 2007/0199(COD)

Amendments (4)

Amendment 206 #
Proposal for a regulation – amending act
Article 1 – point 7 – point b
Regulation (EC) No 1775/2005
Article 5 – paragraph 3 – point a
(a) in the event of contractual congestion, the transmission system operator shall offer unused capacity on the primary market at least on a day-ahead and interruptible basis, insofar as this does not prevent the implementation of long-term supply contracts;
2008/04/14
Committee: ITRE
Amendment 214 #
Proposal for a regulation – amending act
Article 1 – point 8
Regulation (EC) No 1775/2005
Article 5 a – paragraph 3 – subparagraph 1 a (new)
Those measures shall take into account the integrity of the system concerned as well as security of supply.
2008/04/14
Committee: ITRE
Amendment 233 #
Proposal for a regulation – amending act
Article 1 – point 10
Regulation (EC) No 1775/2005
Article 6 a – paragraph 4
4. All LNG and storage system operators shall make public the amount of gas in each storage facility or group of storage facilities in a same balancing zone or LNG facility, inflows and outflows, and the available storage and LNG facility capacities, including for those facilities exempted from third party access. The information shall also be communicated to the transmission system operator who shall make it public on an aggregated level per system or subsystem defined by the relevant points. The information shall be updated at least every day.
2008/04/14
Committee: ITRE
Amendment 268 #
Proposal for a regulation – amending act
Article 1 – point 14
Regulation (EC) No 1775/2005
Article 9 – paragraph 2 – subparagraph 2 a (new)
In the event of amendments to the guidelines referred to in the first subparagraph and the adoption of guidelines on the points referred to in paragraph 1, the Commission shall carry out a prior impact assessment and consult all the parties concerned by the guidelines, including, if necessary, supply undertakings, customers, system users, transmission system operators, distribution system operators, LNG system operators and storage system operators, and shall request the participation of the Agency.
2008/04/14
Committee: ITRE