25 Amendments of Gerben-Jan GERBRANDY related to 2016/0379(COD)

Amendment 132 #
Proposal for a regulation
Recital 5
(5) In the past, electricity customers were purely passive, often buying electricity at regulated prices which had no direct relation to the market. In the future, customers need to be enabled to fully participate in the market on equal footing with other market participants and be empowered to manage their energy consumption. To integrate growing shares of renewable energy, the future electricity system should make use of all available sources of flexibility, particularly demand response and storage and of digitalisation through the integration of innovative technologies with the electricity system. To achieve effective decarbonisation at lowest cost, it also needs to encourage energy efficiency.
2017/09/25
Committee: ITRE
Amendment 188 #
Proposal for a regulation
Recital 36
(36) Regional operational centres should primarily act in the interest of system and market operation of the region over the interests of any single entity. Hence, regional operational centres should be entrusted with decision-making powers to act and to direct actions to be taken by transmission system operators of the system operation region for certain functions and with an enhanced advisory role for the remaining functions. Regional operational centres should ensure that decision-making processes are based on equitable treatment, geographical balance and inclusiveness, in order to ensure the representation of all transmission systems of the region.
2017/09/25
Committee: ITRE
Amendment 193 #
Proposal for a regulation
Recital 38
(38) In order to raise efficiencies in the electricity distribution networks in the Union and ensure close cooperation with transmission system operators and ENTSO for electricity, a European entity of distribution system operators in the Union ("EU DSO entity") should be established. The tasks of the EU DSO entity should be well-defined and its working method should ensure efficiency, transparency, independence and representativeness amongst the Union distribution system operators. The EU DSO Entity should closely cooperate with ENTSO for Electricity on the preparation and implementation of the network codes where applicable, on the need for standardisation to facilitate crossborder data exchange between transmission system operators and distribution system operators, and should work on providing guidance on the integration inter alia of distributed generation and storage in distribution networks or other areas which relate to the management of distribution networks.
2017/09/25
Committee: ITRE
Amendment 203 #
Proposal for a regulation
Article 1 – paragraph 1 – point b
(b) setting fundamental principles for well-functioning, integrated electricity markets, which allow non-discriminatory market access for all resource providers and electricity customers, empower consumers, enable demand response, energy storage and energy efficiency, facilitate aggregation of distributed demand and supply, and contribute to the decarbonisation of the economy by enabling market integration and market- based remuneration of electricity generated from renewable sources. Interconnections between Member States further contribute to an efficient integration of electricity from renewable energy sources to countervail their variability, reduce balancing costs and encourage competition. Each Member State shall ensure that its level of electricity interconnection is equivalent to at least 10% of their installed production capacity by 2020, with a view to reaching a more ambitious level by2030;
2017/09/25
Committee: ITRE
Amendment 232 #
Proposal for a regulation
Article 2 – paragraph 2 – point u
(u) 'capacity mechanism' means an temporary administrative measure to ensure the achievement of the desirednecessary level of security of supply by remunerating resources for their availability not including measures relating to ancillary services;
2017/09/25
Committee: ITRE
Amendment 264 #
Proposal for a regulation
Article 3 – paragraph 1 – point c
(c) customers shall be enabled to benefit from market opportunities and increased competition on retail markets and be empowered to act as participant in the energy market and the energy transition;
2017/09/25
Committee: ITRE
Amendment 398 #
Proposal for a regulation
Article 5 – paragraph 8
8. The procurement of balancing capacity shall be facilitated cross-border and on a regional level in accordance with point 8 of Annex I. The procurement shall be based on a primary market and organised in such a way as to be non- discriminatory between market participants in the prequalification process individually or through aggregation.
2017/09/25
Committee: ITRE
Amendment 441 #
Proposal for a regulation
Article 7 – paragraph 4
4. By 1 January 2025, the imbalance settlement period shall be 15 minutes or less in all control areas.
2017/09/25
Committee: ITRE
Amendment 490 #
Proposal for a regulation
Article 11 – paragraph 1
1. Dispatching of power generation facilities and demand response shall be transparent, non-discriminatory and market based unless otherwise provided under paragraphs 2 to 4.
2017/09/25
Committee: ITRE
Amendment 547 #
Proposal for a regulation
Article 11 – paragraph 4
4. GeneratingIn order to maintain a stable regulatory framework for investors, generating or energy storage installations using renewable energy sources or high- efficiency cogeneration which have been commissioned prior to [OP: entry into force] and have, when commissioned, been subject to priority dispatch under Article 15(5) of Directive 2012/27/EU of the European Parliament and of the Council or Article 16(2) of Directive 2009/28/EC of the European Parliament and of the Council 35 shall remain subject to priority dispatch. Priority dispatch shall no longer be applicable from the date where the generating or energy storage installation is subject to significant modifications, which shall be the case at least where a new connection agreement is required or the generation or energy storage capacity is increased. _________________ 35 Directive 2009/28/EC of the European Parliament and of the Council of 23 April 2009 on the promotion of the use of energy from renewable sources and amending and subsequently repealing Directives 2001/77/EC and 2003/30/EC (OJ L 140, 5.6.2009, p. 16).
2017/09/25
Committee: ITRE
Amendment 575 #
Proposal for a regulation
Article 12 – paragraph 3
3. The responsible system operators shall report at least once per year to the competent regulatory authority, which shall be transmitted to the Agency, on curtailment or downward redispatching of generating installations using renewable energy sources or high-efficiency cogeneration and on measures taken to reduce the need for such curtailment or downward redispatching in the future, including investments in digitalisation of the grid infrastructure and in services that increase flexibility. Curtailment or redispatching of generating installations using renewable energy sources or high- efficiency cogeneration shall be subject to compensation pursuant to paragraph 6.
2017/09/25
Committee: ITRE
Amendment 579 #
Proposal for a regulation
Article 12 – paragraph 3
3. The responsible system operators shall report at least once per year to the competent regulatory authority on curtailment or downward redispatching of generating, energy storage or demand- response installations using renewable energy sources or high-efficiency cogeneration and on measures taken to reduce the need for such curtailment or downward redispatching in the future. Curtailment or redispatching of generating installations using renewable energy sources, energy storage, demand-response or high-efficiency cogeneration shall be subject to compensation pursuant to paragraph 6.
2017/09/25
Committee: ITRE
Amendment 582 #
Proposal for a regulation
Article 12 – paragraph 4 – point a
(a) guarantee the capability of transmission and distribution networks to transmit electricity produced from renewable energy sources, energy storage, demand-response or high- efficiency cogeneration with minimum possible curtailment or redispatching. That shall not prevent network planning from taking into account limited curtailment or redispatching where this is shown to be more economically efficient and does not exceed 5 % of installed capacities using renewable energy sources, energy storage, demand-response or high- efficiency cogeneration in their area, provided that an appropriate consultation with stakeholders is carried out before its approval;
2017/09/25
Committee: ITRE
Amendment 647 #
Proposal for a regulation
Article 12 – paragraph 6 a (new)
6 a. Member States shall ensure that the information reported under paragraph 3 is reflected through the national reporting process on the internal energy market, as provided in the Governance Regulation (art.21).
2017/09/25
Committee: ITRE
Amendment 728 #
Proposal for a regulation
Article 16 – paragraph 1
1. Charges applied by network operators for access to networks , including charges for connection to the networks, charges for use of networks, and, where applicable, charges for related network reinforcements, shall be transparent, take into account the need for network security and flexibility and reflect actual costs incurred insofar as they correspond to those of an efficient and structurally comparable network operator and are applied in a non-discriminatory manner. In particular, they shall be applied in a way which does not discriminate between production or energy storage connected at the distribution level and production connected at the transmission level, either positively or negatively. They shall not discriminate against energy storage and shall not create disincentives, specifically not double charging energy storage, and aggregation and shall not create disincentives for self-generation, self-consumption, and for participation in demand response. Without prejudice to paragraph 3, those charges shall not be distance- related.
2017/09/25
Committee: ITRE
Amendment 771 #
Proposal for a regulation
Article 16 – paragraph 8
8. Regulatory authorities shall provide incentives to distribution system operators to procure services for the operation and development of their networks and integrate innovative solutions in the distribution systems. For that purpose regulatory authorities shall recognise as eligible and include all relevant costs in distribution tariffs and introduce performance targets in order to incentivise distribution system operators to raise efficiencies, including energy efficiency, digitalisation and flexibility, in their networks.
2017/09/25
Committee: ITRE
Amendment 934 #
Proposal for a regulation
Article 20 – paragraph 1
1. When applying capacity mechanisms Member States shall have a reliability standard in place indicating their desired level of security of supply in a transparent manner. In case of cross- border bidding zones, such reliability standards shall be established jointly by the relevant authorities.
2017/09/25
Committee: ITRE
Amendment 1119 #
Proposal for a regulation
Article 25 – paragraph 2
2. In performing its functions under EU law, the ENTSO for Electricity shall act for the European good and independent from individual national interests or the national interests of transmission system operators, and shall contribute to the efficient and sustainable achievement of the objectives set out in the policy framework for climate and energy covering the period from 2020 to 2030, in particular by contributing to the efficient integration of electricity generated from renewable energy sources in combination with energy storage and demand response and to increases in energy efficiency.
2017/09/25
Committee: ITRE
Amendment 1131 #
Proposal for a regulation
Article 27 – paragraph 1 – point new (h a (new)
new (h a) standardisation, in cooperation with the EU DSO entity, of relevant data formats and protocols to facilitate crossborder exchange of data ;
2017/09/25
Committee: ITRE
Amendment 1201 #
Proposal for a regulation
Article 34 – paragraph 1 – point h
(h) facilitate the crossborder and regional procurement of balancing capacity;
2017/09/25
Committee: ITRE
Amendment 1260 #
Proposal for a regulation
Article 38 – paragraph 1
1. Regional operational centres shall develop a procedure for the adoption of decisions and recommendations, that ensures geographically balanced representation and equitable treatment between members of the Regional operational centre.
2017/09/25
Committee: ITRE
Amendment 1355 #
Proposal for a regulation
Article 47 – paragraph 4
4. Transmission system operators shall publish relevant data on aggregated forecast and actual demand, on availability and actual use of generation and load assets, on availability and use of the networks and interconnections, and on balancing power and reserve capacity and on the availability of flexibility. For availability and actual use of small generation and load units, aggregated estimate data may be used.
2017/09/25
Committee: ITRE
Amendment 1422 #
Proposal for a regulation
Article 51 – paragraph 1 – point d
(d) digitalisation of distribution networks including deployment of smart grids and intelligensmart metering systems ;
2017/09/25
Committee: ITRE
Amendment 1423 #
Proposal for a regulation
Article 51 – paragraph 1 – point e
(e) data managementguarantee non-discriminatory and neutral access to data regardless of the data management model, and promote standardization, cross-border data exchange, in particular with ENTSO for Electricity where relevant to facilitate data exchange, cyber security and data protection;
2017/09/25
Committee: ITRE
Amendment 1431 #
Proposal for a regulation
Article 51 – paragraph 1 – point f a (new)
(f a) definition of standardised market products, at least for crossborder bidding zones, in cooperation with all relevant market participants including transmission system operators, demand response providers and other system users;
2017/09/25
Committee: ITRE