2004/0221(CNS) Nuclear energy: Bohunice V1 nuclear power plant in Slovakia, implementation of the Protocol No 9 annexed to the Accession Act 2004

Progress: Procedure completed

RoleCommitteeRapporteurShadows
Lead ITRE HARMS Rebecca (icon: Verts/ALE Verts/ALE)
Committee Opinion AFET
Committee Opinion BUDG LEWANDOWSKI Janusz (icon: PPE-DE PPE-DE)
Committee Opinion ENVI
Lead committee dossier:
Legal Basis:
Euratom Treaty A 203

Events

2011/07/13
   EC - Follow-up document
Details

The Commission presents a report on the use of financial resources provided to Lithuania, Slovakia and Bulgaria to support the decommissioning of early shut-down nuclear power-plants under the Acts of Accession. The report assesses the implementation status of EU financial assistance, particularly covering the implementation of the decommissioning programme during the period 2004 – 2009. It also considers financial assistance from the preceding period and recent progress made in 2010 in order to provide a consistent and comprehensive picture.

It recalls that the EU assistance programme is dedicated to the following NPPs:

Ignalina NPP (INPP) units 1 and 2 in Lithuania. Bohunice V1 NPP (V1 NPP) units 1 and 2 in Slovakia and Kozloduy NPP (KNPP) units 1 to 4 in Bulgaria.

All designated nuclear units in Lithuania, Slovakia and Bulgaria have been safely shut down in line with their Accession Agreements. Decommissioning works are currently ongoing. This situation has been achieved as a direct consequence of the successful implementation of the EU assistance programme, which have faced a variety of difficulties, at both the political and technical level. Considerable efforts were taken by Member States to renegotiate their political commitments, however through the EU`s expression of solidarity and the provision of appropriate financial assistance all countries respected their Accession Treaty commitments to shut down their reactor units.

The boundary conditions for each country are unique and impact upon the choice of technology, strategy and reasoning associated with the selection of projects. Therefore it is difficult to present a direct comparison of the effectiveness of the EU assistance provided to each Member State. An assessment of the needs and capabilities was undertaken prior to the instigation of projects at each NPP. Identification and implementation of projects also benefited from a regular re-evaluation of the national strategies and decommissioning plans.

Lithuania-Ignalina Nuclear Power Plant : Unit 1 was permanently shut down on 31 December 2004, and unit 2 on 31 ecember 2009. The total EU assistance to Lithuania between 1999 and 2013 is anticipated to be EUR 1367 million.

The programme evolved within a difficult political climate. Up to 2009 Lithuania campaigned strongly to postpone the closure of unit 2 until 2012. The lack of commitment to closure impacted negatively on the progress towards decommissioning. Despite these difficulties, both units were finally shut down on schedule as prescribed in the Accession Treaty. Today they are safely maintained, and are in a decommissioning phase. As of today the reactor core of unit 1 has been completely defueled. No electricity shortages or black-out were experienced following the closures. Considering this difficult background, the performance towards decommissioning can be considered as satisfactory. Although delays have been experienced in some of the decommissioning projects and have given rise to additional costs, these delays have not as yet had a direct impact on the critical path of the decommissioning. However, the project "slack" has been exhausted and significant efforts will be required in order to avoid major delays and additional cost increases.

Slovakia– Bohunice V1 Nuclear Power Plant : Unit 1 was permanently shut-down on 31 December 2006 and unit 2 on 31 December 2008. The total EU assistance to Slovakia between 1999 and 2013 is foreseen to be EUR 613 million.

Since the beginning of the programme several issues such as: the reorganisation of JAVYS (the state-owned organisation responsible for the post-shut down supervision and for the decommissioning of V1 NPP), communication difficulties between the parties; the gas crisis in early 2009 have contributed to the complexity of the programme implementation and delays in some projects. Despite these difficulties, both units were shut down on schedule, and have been safely maintained. They are now in the decommissioning phase. No electricity shortages were experienced following the closure. As such the overall performance can be considered satisfactory. Delays experienced in some projects might have a negative impact on issuance of decommissioning license (scheduled for mid 2011). The EU continues to monitor closely the progress towards the achievement of this key milestone.

Bulgaria – Kozloduy Nuclear Power Plant : Units 1 and 2 were shut down on 31 December 2002 and units 3 and 4 were shut down on 31 December 2006. The total EU assistance to Bulgaria between 1999 and 2013 is anticipated to be EUR 867.78 million.

The decommissioning programme has progressed in a particularly unfavourable political context. In 2006 attempts were made to postpone the closures, and again, after 2006 to reopen the shutdown reactors. Despite these difficulties the overall performance of the programme can be considered satisfactory given that all units have been shut down as prescribed in the Accession Treaty. Units 1&2 are entirely defueled, the dry spent fuel storage is close to completion and first dismantling works have started. Waste treatment and storage facilities are under implementation. No electricity black-out occurred following the closure of the reactor units.

The commitment of the current Bulgarian government, together with the separation of units 1&2 from 3&4 will support and impact positively on the timely progression of the decommissioning programme. A major benefit realised in relation to the EU assistance is the change in the decommissioning strategy from one of "deferred dismantling" to "immediate – continuous dismantling". This reduces the overall time for decommissioning and makes best use of available staff to execute dismantling works. This will have a positive impact on the overall costs for decommissioning. A substantial proportion of the funds have been allocated to energy projects to address consequences of the early-closure.

Conclusion: the scale of the problem encountered by each country was a function of the different reactor types to be decommissioned, the state of the existing infrastructure required to support the decommissioning and waste management challenges, the possibilities regarding replacing the lost electrical generating capacity, the regulatory and political environment and the choice of decommissioning strategy. Despite initial difficulties, the reactors were shut-down on schedule and the majority have been de-fueled as a first important step towards irreversible closure and decommissioning of the NPPs.

In each Member State the finances available for projects exceed the disbursements. The funds have been made available on an annual basis since 1999 at a time when Member States were not yet able to make full use of them. As a consequence, some funds have accumulated. More recently these funds have been utilised more effectively and efficiently and they will be fully absorbed within the next two years.

Significant progress has been demonstrated for the three programmes over the past years and up to the end of the reporting period with the majority of the decommissioning and energy-sector-related projects having been identified or prepared and with a significant proportion already under implementation.

In all countries the majority of funding was directed towards decommissioning and radioactive waste (RAW) management related projects. Lithuania and Bulgaria used a significant portion for spent fuel storage and waste management. Currently, the facilities necessary for decommissioning, treatment and storage of RAW and spent nuclear fuel are under construction, the licensing documentation is elaborated and first preparatory dismantling works have started. The energy sector has benefited where projects were in line with the EU and national energy policies. EU assistance was advanced from an early stage to the energy sector in order to address the loss of electricity generating capacity. This approach proved to be particularly beneficial and effective in the case of Bulgaria, in mitigating the effects of the recent energy and financial crises. Although delays occurred in some decommissioning projects, these are actively addressed to minimise their impact on the critical path of the decommissioning.

The countries' legal framework and management structures continue to be adapted taking into account the changes from electricity producing companies to decommissioning organisations.

Outlook: measures in the decommissioning and energy windows will continue up until the end of the financing perspective as guided by the strategies identified. Decommissioning related projects will be prioritised above energy related projects where funds are limited.

The use of the EU assistance within the decommissioning window will be focusing on the completion of the necessary infrastructure, RAW treatment, the realisation of the necessary decommissioning licenses and on dismantling. New decommissioning organisation and management structures will be instigated and reinforced to address the dismantling activities, while the execution of the dismantling works by plant staff continues.

Energy sector projects are well advanced. Actions in this area are currently considered to be sufficient. Although the final financial commitment will be made in 2013, the implementation of the works from these commitments will extend beyond this date. The aim of the EU assistance remains to provide assistance to the Member States rather than the full financing of the decommissioning or the full compensation of closure consequences. The assistance provided shall be complemented by adequate national resources.

2011/07/13
   EC - Follow-up document
2007/05/23
   Final act published in Official Journal
Details

PURPOSE: to provide financing for the decommissioning of the Bohunice V1 nuclear power plant in Slovakia.

LEGISLATIVE ACT : Council Regulation (Euratom) N° 549/2007 on the implementation of Protocol No 9 on Unit 1 and Unit 2 of the Bohunice V1 nuclear power plant in Slovakia to the Act concerning the conditions of accession to the European Union of the Czech Republic, Estonia, Cyprus, Latvia, Lithuania, Hungary, Malta, Poland, Slovenia and Slovakia.

CONTENT: This Regulation establishes the programme laying down detailed rules for implementation of the Community’s financial contribution provided for in Protocol No 9 annexed to the 2003 Act of Accession. Protocol No 9 on Unit 1 and Unit 2 of the Bohunice V1 nuclear power plant in Slovakia, as annexed to the 2003 Act of Accession, reiterates Slovakia’s commitment to close the Bohunice V1 nuclear power plant and, to this end, established an assistance programme with a budget of EUR 90 million for the period 2004 to 2006. However, in Protocol No 9 the Union also recognised that decommissioning of the Bohunice V1 nuclear power plant would have to continue beyond the Financial Perspectives 2002 to 2006 and that this effort represented a significant financial burden for Slovakia. Bohunice V1 nuclear power plant over the period from 2007 to 2013.

The Community contribution to the programme under the Regulation will be granted for the purpose of providing financial support for measures connected with the decommissioning of the Bohunice V1 nuclear power plant, measures for environmental upgrading in line with the acquis and for modernising conventional production capacity to replace the production capacity of the two reactors at the Bohunice V1 power plant and other measures which stem from the decision to close and decommission this plant and which contribute to the necessary restructuring, upgrading of the environment and modernisation of the energy production, transmission and distribution sectors in Slovakia as well as to enhancing security of supply and energy efficiency in Slovakia.

The financial reference amount necessary for implementation of the programme 2 for the period from 1 January 2007 to 31 December 2013 shall be EUR 423 million .

The amount of the appropriations allocated to the programme may be reviewed in the course of the period from 1 January 2007 to 31 December 2013 to take account of the progress made with implementation of the programme and ensure that the programming and allocation of the resources are based on actual payment needs and absorption capacity.

Financial assistance for measures under the programme, or parts thereof, may be made available as a Community contribution to the Bohunice International Decommissioning Support Fund, managed by the EBRD.

The Commission will ensure the implementation of this Regulation and shall report at regular intervals to the European Parliament and the Council. It will carry out a mid-term review, as stated above.

The European Parliament shall be informed by the Commission of committee proceedings on a regular basis. To that end, it will receive agendas for committee meetings, and the results of voting and summary records of the meetings and lists of the authorities and organisations to which the persons designated by the Member States to represent them belong.

ENTRY INTO FORCE : 12/06/2007.

2007/05/14
   EP/CSL - Act adopted by Council after consultation of Parliament
2007/05/14
   EP - End of procedure in Parliament
2007/05/14
   CSL - Council Meeting
2006/05/24
   EC - Document attached to the procedure
Details

Package of legislative proposals following the Interinstitutional Agreement on

budgetary discipline and sound financial management

The conclusion on 17 May 2006 by the Commission, the Council and the European Parliament of the agreement on the 2007-2013 financial framework (Interinstitutional Agreement on budgetary discipline and sound financial management – please refer to procedure ACI/2004/2099 ) marks a real success for Europe, providing a stable financial framework for the political priorities of the enlarged Union for the next seven years. It is now up to the institutions and Member States to ensure that the financial resources available are used and implemented as well as possible. Action at European level must contribute true added value to that taken at national, regional or local level and must have an optimum impact on each European player. The Commission is ready to play a full role in all these areas.

The agreement marks a decisive step forward towards the ultimate objective of providing the Union with operational programmes by the beginning of 2007. Work must now be continued on each legislative act. To this end, the Commission intends to continue to provide momentum and act as a facilitator, as it has been doing since the start of the negotiations.

As part of the negotiations on the 2007-2013 financial framework, in October 2005 the European Parliament, the Council and the Commission adopted a joint declaration in which they undertook to continue work on the legislative proposals currently being discussed and then, once the interinstitutional agreement had been adopted and on the basis of amended proposals by the Commission, to reach agreement on each of these proposals. Thus, in accordance with Article 250(2) of the EC Treaty and in order to facilitate this phase for each legislative act, the Commission has adopted a total of 30 proposals, 26 of which are amended and 4 new.

The proposals amended as a result of the IIA are as follows:

Programmes concerning the external policy of the Union and development cooperation:

Ø COD/2004/0219 ( European Neighbourhood and Partnership Instrument )

Ø COD/2004/0220 ( development co-operation and economic co-operation instrument )

Solidarity and Management of Migration Flows Programme (JHA):

Ø COD/2005/0046 (European Refugee Fund)

Ø COD/2005/0047 ( External borders fund, 2007-2013 )

Ø COD/2005/0049 ( European Return Fund )

Fundamental Rights and Justice Programme (JHA):

Ø COD/2005/0037/A (DAPHNE )

Ø COD/2005/0037/B ( drugs prevention and information )

RDT Framework Programme and specific programmes :

Ø COD/2005/0043 ( RDT Framework Programme )

Ø CNS/2005/0044 (Nuclear Research Programme )

Ø CNS/2005/0184 ( Joint Research Centre - JRC )

Ø CNS/2005/0185 ( Transnational cooperation specific programme )

Ø CNS/2005/0186 ( Specific programme Ideas, frontier research )

Ø CNS/2005/0187 (S pecific programme supporting researchers )

Ø CNS/2005/0188 ( RDT Capacities specific programme )

Ø CNS/2005/0189 ( specific programme direct actions by the Joint Research Centre JRC )

Ø CNS/2005/0190 ( fusion energy, nuclear fission and radiation protection specific programme)

Employment and social cohesion Programme: COD/2004/0158

Programmes in the fields of youth and education:

Ø COD/2004/0152 ( Youth )

Ø COD/2004/0153 ( Education – lifelong learning )

Consumer Protection and Public Health Framework programme:

Ø COD/2005/0042/A ( Public health )

Ø COD/2005/0042/B ( Consumers )

Programme in the fields of energy, environment and transport :

Ø COD/2004/0218 ( LIFE+)

Ø COD/2004/0154 ( TransEuropean networks in the areas of energy and transport )

Ø CNS/2004/0221 ( Decommissioning of the Bohunice nuclear plant )

GALILEO ( radio-navigation by satellite ): COD/2004/0156

In terms of new proposals , the Commission has already submitted three in the area of agriculture and rural development policy and fisheries and aquaculture policy:

Ø CNS/2006/0081 ( fisheries and aquaculture )

Ø CNS/2006/0082 ( rural development )

Ø CNS/2006/0083 ( common agricultural policy ).

Certain legislative acts do not form part of this package of measures, in particular those on which political agreement has been reached since 17 May. For these measures, the Commission has played a full part in helping to bring about agreement between the arms of the legislative authority. The same applies to the acts for which conclusion of the interinstitutional agreement does not modify the Commission’s original proposal. For all the others, which are included in the package presented, the changes proposed by the Commission take account of the content of the interinstitutional agreement adopted, either in a simplified form, where the financial resources allocated to each programme must be adapted, or in a more detailed form where the structure or even the content of the act must be revised. It should also be noted that four of the amended proposals contain amendments already voted on by the European Parliament at first reading and that one proposal has been divided into two amended proposals in response to a request by the Council and the European Parliament, although Parliament has not yet proceeded to a first reading of this proposal.

Based on these amended proposals, the Commission calls on the European Parliament and the Council to continue their discussions of these proposals and conclude them as soon as possible in order to ensure that all the legal instruments are available in time for the effective launch of the programmes in January 2007.

2006/05/24
   EC - Modified legislative proposal
2006/05/23
   EC - Modified legislative proposal published
2005/12/15
   EC - Commission response to text adopted in plenary
Documents
2005/11/16
   EP - Results of vote in Parliament
2005/11/16
   EP - Decision by Parliament
Details

The European Parliament adopted a resolution on the Bohunice V1 nuclear power plant in Slovakia by 377 votes in favour to 222 against with 59 abstentions. (Please see the summary dated 26/09/2005.) Before the final vote Rebecca HARMS (Greens/EFA DE) withdrew her name from the report and asked Parliament to vote against the report because MEPs had voted to raise EU spending.

Parliament felt that the estimated costs of the early closure and decommissioning of the two units are higher than the basis used for the Commission's calculation. Therefore, Parliament wanted to raise EU appropriations from EUR 237 million as in the Commission's proposal to EUR 400 million for the period from 1.1.2007 to 31.12.2013 . The additional amount of EUR 163 million should be made available by the European Union and especially to those Member States that will benefit from the closure of the nuclear power plant in the context of the annual budgetary procedure. Parliament also inserted a clause stating that the measures to be supported using Community budget will be defined in more detail by the Commission in 2006 after it receives the decommissioning plans comprising all the necessary information on decommissioning process from the Slovak authorities. On the basis of this plan the Commission will give its yearly approval to measures to be financed. The financial assistance from the Community budget should continue after 31.12.2013.

Documents
2005/11/15
   EP - Debate in Parliament
2005/10/05
   EP - Committee report tabled for plenary, 1st reading/single reading
Documents
2005/10/05
   EP - Committee report tabled for plenary, 1st reading/single reading
Documents
2005/09/26
   EP - Vote in committee
Details

The committee adopted the report by Rebecca HARMS (Greens/EFA, DE) amending the proposal under the consultation procedure:

- EU funding should be increased from EUR 237 million, as proposed by the Commission, to EUR 400 million for the period from 1 January 2007 to 31 December 2013, given that the estimated costs of the early closure and decommissioning of the two units of the Bohunice V1 nuclear power plant in Slovakia were much higher than the basis used for the Commission's calculation;

- a new clause in Article 2 provided for the Commission to define the measures to be financed from the EU budget in more detail in 2006 after it had received the relevant Decommissioning Plan from the Slovak authorities. The Commission would take its annual decision on whether to approve the measures to be financed on the basis of that plan;

- a new clause in Article 3 stipulated that the Community should continue to provide funding after 31 December 2013, on the grounds that decommissioning of the nuclear power plant was a lengthy process which would go far beyond that date.

2005/09/15
   EP - Committee opinion
Documents
2005/07/06
   EP - Amendments tabled in committee
Documents
2005/03/15
   EP - HARMS Rebecca (Verts/ALE) appointed as rapporteur in ITRE
2004/12/14
   EP - Committee referral announced in Parliament
2004/10/26
   EP - LEWANDOWSKI Janusz (PPE-DE) appointed as rapporteur in BUDG
2004/09/29
   EC - Legislative proposal
Details

PURPOSE : to provide financing for the decommissioning of the Bohunice V1 nuclear power plant in Slovakia.

CONTENT : Slovakia has committed to closure of Unit 1 and Unit 2 of the Bohunice V1 nuclear power plant by 31 December 2006 and 31 December 2008, respectively, at the latest. The Union has expressed its willingness to continue to provide financial assistance up to 2006 as an extension of the pre-accession aid planned under the Phare programme in support of Slovakia's decommissioning efforts.

In the Protocol the European Union has also recognised that decommissioning of the Bohunice V1 nuclear power plant will have to continue beyond the current Financial Perspectives and that this effort represents a significant financial burden for Slovakia. Decisions on the continuation of assistance from the Union in this field after 2006 will take account of this situation.

With this proposal, the European Commission is calling for legislative measures needed for the European Union to continue granting financial assistance beyond 2006 to Slovakia for the closure of the Bohunice V1 nuclear power plant. The decommissioning of nuclear installations involves the commitment of considerable sums of money (about 15% of the investment cost of a reactor) and extends over an extremely long period of time. The measures financed by this support must obviously cover the technical operations involved in the decommissioning of nuclear installations. However, the plan is not to limit them to the technical aspects alone, but also to take account of other areas, such as security of energy supply, and the social aspects (redeployment of power plant staff).

The contribution for certain measures may amount to up to 100% of the total expenditure. Every effort shall be made to continue the co-financing practice established under the preaccession assistance and the assistance given over the period 2004-2006 for Slovakia's decommissioning effort as well as to attract co-financing from other sources, as appropriate.

The financial assistance may be made available as a Community contribution to the Bohunice International Decommissioning Support Fund managed by the European Bank for Reconstruction and Development.

FINANCIAL IMPLICATIONS :

- Budget line : the budget line used for the years 2004-2006 is 060505 nuclear safety – transitional measures (decommissioning).

- Total : EUR 237 million.

- Period of application : 2007-2013.

- Impact on human resources : 2.5 permanent staff representing a total of EUR 270 000 per year (in addition to the financial envelope).

2004/09/28
   EC - Legislative proposal published
Details

PURPOSE : to provide financing for the decommissioning of the Bohunice V1 nuclear power plant in Slovakia.

CONTENT : Slovakia has committed to closure of Unit 1 and Unit 2 of the Bohunice V1 nuclear power plant by 31 December 2006 and 31 December 2008, respectively, at the latest. The Union has expressed its willingness to continue to provide financial assistance up to 2006 as an extension of the pre-accession aid planned under the Phare programme in support of Slovakia's decommissioning efforts.

In the Protocol the European Union has also recognised that decommissioning of the Bohunice V1 nuclear power plant will have to continue beyond the current Financial Perspectives and that this effort represents a significant financial burden for Slovakia. Decisions on the continuation of assistance from the Union in this field after 2006 will take account of this situation.

With this proposal, the European Commission is calling for legislative measures needed for the European Union to continue granting financial assistance beyond 2006 to Slovakia for the closure of the Bohunice V1 nuclear power plant. The decommissioning of nuclear installations involves the commitment of considerable sums of money (about 15% of the investment cost of a reactor) and extends over an extremely long period of time. The measures financed by this support must obviously cover the technical operations involved in the decommissioning of nuclear installations. However, the plan is not to limit them to the technical aspects alone, but also to take account of other areas, such as security of energy supply, and the social aspects (redeployment of power plant staff).

The contribution for certain measures may amount to up to 100% of the total expenditure. Every effort shall be made to continue the co-financing practice established under the preaccession assistance and the assistance given over the period 2004-2006 for Slovakia's decommissioning effort as well as to attract co-financing from other sources, as appropriate.

The financial assistance may be made available as a Community contribution to the Bohunice International Decommissioning Support Fund managed by the European Bank for Reconstruction and Development.

FINANCIAL IMPLICATIONS :

- Budget line : the budget line used for the years 2004-2006 is 060505 nuclear safety – transitional measures (decommissioning).

- Total : EUR 237 million.

- Period of application : 2007-2013.

- Impact on human resources : 2.5 permanent staff representing a total of EUR 270 000 per year (in addition to the financial envelope).

Documents

Votes

Rapport Harms A6-0282/2005 - am. 5 #

2005/11/16 Outcome: +: 441, -: 184, 0: 22
PL FR ES DE CZ IT GB HU PT SK LT BE NL MT EL IE LU SI LV EE CY FI DK SE AT
Total
50
69
46
87
22
59
73
20
21
14
12
20
26
5
19
12
5
6
8
5
6
14
13
18
17
icon: PPE-DE PPE-DE
243
2

Malta PPE-DE

2

Luxembourg PPE-DE

3

Slovenia PPE-DE

3

Estonia PPE-DE

For (1)

1
4

Denmark PPE-DE

Against (1)

1
icon: PSE PSE
173

Czechia PSE

2

Lithuania PSE

2

Ireland PSE

1

Luxembourg PSE

For (1)

1

Slovenia PSE

For (1)

1

Estonia PSE

2
icon: NI NI
26

Czechia NI

1

United Kingdom NI

Abstain (1)

3

Belgium NI

2

Austria NI

Against (1)

1
icon: UEN UEN
20

Lithuania UEN

2

Ireland UEN

3

Denmark UEN

For (1)

1
icon: IND/DEM IND/DEM
33

France IND/DEM

2

Czechia IND/DEM

1

Netherlands IND/DEM

2

Greece IND/DEM

Abstain (1)

1

Ireland IND/DEM

Against (1)

1

Denmark IND/DEM

1

Sweden IND/DEM

3
icon: GUE/NGL GUE/NGL
35

France GUE/NGL

3

Spain GUE/NGL

Against (1)

1

United Kingdom GUE/NGL

Against (1)

1

Portugal GUE/NGL

Against (1)

3

Netherlands GUE/NGL

2

Greece GUE/NGL

1

Ireland GUE/NGL

Against (1)

1

Cyprus GUE/NGL

2

Finland GUE/NGL

Against (1)

1

Sweden GUE/NGL

2
icon: ALDE ALDE
77
2

Hungary ALDE

Against (1)

1

Ireland ALDE

Against (1)

1

Slovenia ALDE

2

Latvia ALDE

Against (1)

1

Estonia ALDE

Against (2)

2

Cyprus ALDE

Against (1)

1

Sweden ALDE

3

Austria ALDE

Against (1)

1
icon: Verts/ALE Verts/ALE
40

Italy Verts/ALE

2

United Kingdom Verts/ALE

5

Belgium Verts/ALE

2

Luxembourg Verts/ALE

Against (1)

1

Latvia Verts/ALE

Against (1)

1

Finland Verts/ALE

Against (1)

1

Denmark Verts/ALE

Against (1)

1

Sweden Verts/ALE

Against (1)

1

Austria Verts/ALE

2

Rapport Harms A6-0282/2005 - am. 12 #

2005/11/16 Outcome: +: 436, -: 190, 0: 25
FR PL ES IT CZ GB PT HU SK DE LT BE NL EL MT IE LU SI EE LV FI CY DK AT SE
Total
67
50
45
62
23
73
21
19
14
87
12
21
26
20
4
12
5
6
6
8
14
6
13
18
19
icon: PPE-DE PPE-DE
248
2

Malta PPE-DE

2

Luxembourg PPE-DE

3

Slovenia PPE-DE

3

Estonia PPE-DE

For (1)

1
4

Cyprus PPE-DE

Against (1)

3

Denmark PPE-DE

Against (1)

1
icon: PSE PSE
170

Czechia PSE

2

Lithuania PSE

2

Malta PSE

2

Ireland PSE

1

Luxembourg PSE

For (1)

1

Slovenia PSE

For (1)

1
icon: NI NI
28

Czechia NI

1

United Kingdom NI

Abstain (1)

3

Austria NI

For (1)

Against (1)

2
icon: UEN UEN
21

Lithuania UEN

2

Ireland UEN

3

Denmark UEN

For (1)

1
icon: IND/DEM IND/DEM
33

France IND/DEM

2

Italy IND/DEM

Against (1)

3

Czechia IND/DEM

1

Netherlands IND/DEM

2

Greece IND/DEM

Abstain (1)

1

Ireland IND/DEM

Against (1)

1

Denmark IND/DEM

1

Sweden IND/DEM

3
icon: GUE/NGL GUE/NGL
34

France GUE/NGL

3

Spain GUE/NGL

Against (1)

1

United Kingdom GUE/NGL

Against (1)

1

Portugal GUE/NGL

Against (1)

3

Netherlands GUE/NGL

2

Greece GUE/NGL

1

Ireland GUE/NGL

Against (1)

1

Finland GUE/NGL

Against (1)

1

Cyprus GUE/NGL

For (1)

2

Sweden GUE/NGL

2
icon: ALDE ALDE
77
2

Hungary ALDE

Against (1)

1

Ireland ALDE

Against (1)

1

Slovenia ALDE

2

Estonia ALDE

Against (2)

2

Latvia ALDE

Against (1)

1

Cyprus ALDE

Against (1)

1

Austria ALDE

Against (1)

1

Sweden ALDE

3
icon: Verts/ALE Verts/ALE
40

Italy Verts/ALE

2

United Kingdom Verts/ALE

5

Belgium Verts/ALE

2

Luxembourg Verts/ALE

Against (1)

1

Latvia Verts/ALE

Against (1)

1

Finland Verts/ALE

Against (1)

1

Denmark Verts/ALE

Against (1)

1

Austria Verts/ALE

2

Sweden Verts/ALE

Against (1)

1

History

(these mark the time of scraping, not the official date of the change)

docs/0
date
2004-09-29T00:00:00
docs
summary
type
Legislative proposal
body
EC
docs/0
date
2005-05-31T00:00:00
docs
title: PE359.894
type
Committee draft report
body
EP
docs/1/docs/0/url
https://www.europarl.europa.eu/doceo/document/ITRE-AM-360221_EN.html
docs/2/docs/0/url
https://www.europarl.europa.eu/doceo/document/BUDG-AD-360142_EN.html
docs/5/docs/0/url
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2006/0239/COM_COM(2006)0239_EN.pdf
New
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2006/0239/COM_COM(2006)0239_EN.pdf
events/0
date
2004-09-28T00:00:00
type
Legislative proposal published
body
EC
docs
summary
events/0
date
2004-09-29T00:00:00
type
Legislative proposal published
body
EC
docs
summary
events/7/date
Old
2006-05-24T00:00:00
New
2006-05-23T00:00:00
docs/2/docs/0/url
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE360.142&secondRef=02
docs/3/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/A-6-2005-0282_EN.html
New
https://www.europarl.europa.eu/doceo/document/A-6-2005-0282_EN.html
docs/4/docs/0/url
/oeil/spdoc.do?i=4302&j=0&l=en
docs/5/docs/0/url
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2006/0239/COM_COM(2006)0239_EN.pdf
New
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2006/0239/COM_COM(2006)0239_EN.pdf
docs/7/docs/0/url
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2011/0432/COM_COM(2011)0432_EN.pdf
New
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2011/0432/COM_COM(2011)0432_EN.pdf
events/1/type
Old
Committee referral announced in Parliament, 1st reading/single reading
New
Committee referral announced in Parliament
events/2/type
Old
Vote in committee, 1st reading/single reading
New
Vote in committee
events/3/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/A-6-2005-0282_EN.html
New
https://www.europarl.europa.eu/doceo/document/A-6-2005-0282_EN.html
events/4/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20051115&type=CRE
New
https://www.europarl.europa.eu/doceo/document/EN&reference=20051115&type=CRE
events/6
date
2005-11-16T00:00:00
type
Decision by Parliament
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/TA-6-2005-0429_EN.html title: T6-0429/2005
summary
events/6
date
2005-11-16T00:00:00
type
Decision by Parliament, 1st reading/single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/TA-6-2005-0429_EN.html title: T6-0429/2005
summary
events/10/docs/1/url
Old
https://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2007:131:SOM:EN:HTML
New
https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2007:131:TOC
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Industry, Research and Energy
committee
ITRE
rapporteur
name: HARMS Rebecca date: 2005-03-15T00:00:00 group: Greens/European Free Alliance abbr: Verts/ALE
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Industry, Research and Energy
committee
ITRE
date
2005-03-15T00:00:00
rapporteur
name: HARMS Rebecca group: Greens/European Free Alliance abbr: Verts/ALE
committees/2
type
Committee Opinion
body
EP
associated
False
committee_full
Budgets
committee
BUDG
rapporteur
name: LEWANDOWSKI Janusz date: 2004-10-26T00:00:00 group: European People's Party (Christian Democrats) and European Democrats abbr: PPE-DE
committees/2
type
Committee Opinion
body
EP
associated
False
committee_full
Budgets
committee
BUDG
date
2004-10-26T00:00:00
rapporteur
name: LEWANDOWSKI Janusz group: European People's Party (Christian Democrats) and European Democrats abbr: PPE-DE
docs/2/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE360.142
New
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE360.142&secondRef=02
docs/3/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-282&language=EN
New
http://www.europarl.europa.eu/doceo/document/A-6-2005-0282_EN.html
docs/4/body
EC
docs/5/docs/0/url
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2006/0239/COM_COM(2006)0239_EN.pdf
New
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2006/0239/COM_COM(2006)0239_EN.pdf
docs/8/docs/0/url
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/sec/2011/0914/COM_SEC(2011)0914_EN.pdf
New
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/sec/2011/0914/COM_SEC(2011)0914_EN.pdf
events/0/docs/0/url
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0624/COM_COM(2004)0624_EN.pdf
New
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2004/0624/COM_COM(2004)0624_EN.pdf
events/3/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-282&language=EN
New
http://www.europarl.europa.eu/doceo/document/A-6-2005-0282_EN.html
events/6/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-429
New
http://www.europarl.europa.eu/doceo/document/TA-6-2005-0429_EN.html
docs/7/docs/0/url
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2011/0432/COM_COM(2011)0432_EN.pdf
New
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2011/0432/COM_COM(2011)0432_EN.pdf
docs/8/docs/0/url
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/sec/2011/0914/COM_SEC(2011)0914_EN.pdf
New
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/sec/2011/0914/COM_SEC(2011)0914_EN.pdf
events/10/docs/1/url
Old
https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2007:131:TOC
New
https://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2007:131:SOM:EN:HTML
activities
  • date: 2004-09-29T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0624/COM_COM(2004)0624_EN.pdf title: COM(2004)0624 type: Legislative proposal published celexid: CELEX:52004PC0624(02):EN body: EC commission: DG: Energy and Transport Commissioner: PIEBALGS Andris type: Legislative proposal published
  • date: 2004-12-14T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: False committee_full: Foreign Affairs committee: AFET body: EP responsible: False committee: BUDG date: 2004-10-26T00:00:00 committee_full: Budgets rapporteur: group: PPE-DE name: LEWANDOWSKI Janusz body: EP responsible: False committee_full: Environment, Public Health and Food Safety committee: ENVI body: EP responsible: True committee: ITRE date: 2005-03-15T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: Verts/ALE name: HARMS Rebecca
  • date: 2005-09-26T00:00:00 body: EP committees: body: EP responsible: False committee_full: Foreign Affairs committee: AFET body: EP responsible: False committee: BUDG date: 2004-10-26T00:00:00 committee_full: Budgets rapporteur: group: PPE-DE name: LEWANDOWSKI Janusz body: EP responsible: False committee_full: Environment, Public Health and Food Safety committee: ENVI body: EP responsible: True committee: ITRE date: 2005-03-15T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: Verts/ALE name: HARMS Rebecca type: Vote in committee, 1st reading/single reading
  • date: 2005-10-05T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-282&language=EN type: Committee report tabled for plenary, 1st reading/single reading title: A6-0282/2005 body: EP committees: body: EP responsible: False committee_full: Foreign Affairs committee: AFET body: EP responsible: False committee: BUDG date: 2004-10-26T00:00:00 committee_full: Budgets rapporteur: group: PPE-DE name: LEWANDOWSKI Janusz body: EP responsible: False committee_full: Environment, Public Health and Food Safety committee: ENVI body: EP responsible: True committee: ITRE date: 2005-03-15T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: Verts/ALE name: HARMS Rebecca type: Committee report tabled for plenary, 1st reading/single reading
  • date: 2005-11-15T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20051115&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
  • date: 2005-11-16T00:00:00 docs: url: http://www.europarl.europa.eu/oeil/popups/sda.do?id=4302&l=en type: Results of vote in Parliament title: Results of vote in Parliament url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-429 type: Decision by Parliament, 1st reading/single reading title: T6-0429/2005 body: EP type: Results of vote in Parliament
  • date: 2006-05-24T00:00:00 docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2006&nu_doc=[%n] title: COM(2004)0624/2 type: Modified legislative proposal published celexid: CELEX:52004PC0624(02):EN body: EC commission: DG: Energy and Transport Commissioner: PIEBALGS Andris type: Modified legislative proposal published
  • date: 2007-05-14T00:00:00 body: CSL type: Council Meeting council: General Affairs meeting_id: 2799
  • date: 2007-05-14T00:00:00 body: EP type: End of procedure in Parliament
  • date: 2007-05-14T00:00:00 body: EP/CSL type: Act adopted by Council after consultation of Parliament
  • date: 2007-05-23T00:00:00 type: Final act published in Official Journal docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32007R0549 title: Regulation 2007/549 url: http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2007:131:TOC title: OJ L 131 23.05.2007, p. 0001
commission
  • body: EC dg: Energy and Transport commissioner: PIEBALGS Andris
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Industry, Research and Energy
committee
ITRE
date
2005-03-15T00:00:00
rapporteur
name: HARMS Rebecca group: Greens/European Free Alliance abbr: Verts/ALE
committees/0
body
EP
responsible
False
committee_full
Foreign Affairs
committee
AFET
committees/1
type
Committee Opinion
body
EP
associated
False
committee_full
Foreign Affairs
committee
AFET
opinion
False
committees/1
body
EP
responsible
False
committee
BUDG
date
2004-10-26T00:00:00
committee_full
Budgets
rapporteur
group: PPE-DE name: LEWANDOWSKI Janusz
committees/2
type
Committee Opinion
body
EP
associated
False
committee_full
Budgets
committee
BUDG
date
2004-10-26T00:00:00
rapporteur
name: LEWANDOWSKI Janusz group: European People's Party (Christian Democrats) and European Democrats abbr: PPE-DE
committees/2
body
EP
responsible
False
committee_full
Environment, Public Health and Food Safety
committee
ENVI
committees/3
type
Committee Opinion
body
EP
associated
False
committee_full
Environment, Public Health and Food Safety
committee
ENVI
opinion
False
committees/3
body
EP
responsible
True
committee
ITRE
date
2005-03-15T00:00:00
committee_full
Industry, Research and Energy
rapporteur
group: Verts/ALE name: HARMS Rebecca
council
  • body: CSL type: Council Meeting council: General Affairs meeting_id: 2799 url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=2799*&MEET_DATE=14/05/2007 date: 2007-05-14T00:00:00
docs
  • date: 2005-05-31T00:00:00 docs: title: PE359.894 type: Committee draft report body: EP
  • date: 2005-07-06T00:00:00 docs: title: PE360.221 type: Amendments tabled in committee body: EP
  • date: 2005-09-15T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE360.142 title: PE360.142 committee: BUDG type: Committee opinion body: EP
  • date: 2005-10-05T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-282&language=EN title: A6-0282/2005 type: Committee report tabled for plenary, 1st reading/single reading body: EP
  • date: 2005-12-15T00:00:00 docs: url: /oeil/spdoc.do?i=4302&j=0&l=en title: SP(2005)5015 type: Commission response to text adopted in plenary
  • date: 2006-05-24T00:00:00 docs: url: http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2006/0239/COM_COM(2006)0239_EN.pdf title: COM(2006)0239 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2006&nu_doc=239 title: EUR-Lex summary: Package of legislative proposals following the Interinstitutional Agreement on budgetary discipline and sound financial management The conclusion on 17 May 2006 by the Commission, the Council and the European Parliament of the agreement on the 2007-2013 financial framework (Interinstitutional Agreement on budgetary discipline and sound financial management – please refer to procedure ACI/2004/2099 ) marks a real success for Europe, providing a stable financial framework for the political priorities of the enlarged Union for the next seven years. It is now up to the institutions and Member States to ensure that the financial resources available are used and implemented as well as possible. Action at European level must contribute true added value to that taken at national, regional or local level and must have an optimum impact on each European player. The Commission is ready to play a full role in all these areas. The agreement marks a decisive step forward towards the ultimate objective of providing the Union with operational programmes by the beginning of 2007. Work must now be continued on each legislative act. To this end, the Commission intends to continue to provide momentum and act as a facilitator, as it has been doing since the start of the negotiations. As part of the negotiations on the 2007-2013 financial framework, in October 2005 the European Parliament, the Council and the Commission adopted a joint declaration in which they undertook to continue work on the legislative proposals currently being discussed and then, once the interinstitutional agreement had been adopted and on the basis of amended proposals by the Commission, to reach agreement on each of these proposals. Thus, in accordance with Article 250(2) of the EC Treaty and in order to facilitate this phase for each legislative act, the Commission has adopted a total of 30 proposals, 26 of which are amended and 4 new. The proposals amended as a result of the IIA are as follows: Programmes concerning the external policy of the Union and development cooperation: Ø COD/2004/0219 ( European Neighbourhood and Partnership Instrument ) Ø COD/2004/0220 ( development co-operation and economic co-operation instrument ) Solidarity and Management of Migration Flows Programme (JHA): Ø COD/2005/0046 (European Refugee Fund) Ø COD/2005/0047 ( External borders fund, 2007-2013 ) Ø COD/2005/0049 ( European Return Fund ) Fundamental Rights and Justice Programme (JHA): Ø COD/2005/0037/A (DAPHNE ) Ø COD/2005/0037/B ( drugs prevention and information ) RDT Framework Programme and specific programmes : Ø COD/2005/0043 ( RDT Framework Programme ) Ø CNS/2005/0044 (Nuclear Research Programme ) Ø CNS/2005/0184 ( Joint Research Centre - JRC ) Ø CNS/2005/0185 ( Transnational cooperation specific programme ) Ø CNS/2005/0186 ( Specific programme Ideas, frontier research ) Ø CNS/2005/0187 (S pecific programme supporting researchers ) Ø CNS/2005/0188 ( RDT Capacities specific programme ) Ø CNS/2005/0189 ( specific programme direct actions by the Joint Research Centre JRC ) Ø CNS/2005/0190 ( fusion energy, nuclear fission and radiation protection specific programme) Employment and social cohesion Programme: COD/2004/0158 Programmes in the fields of youth and education: Ø COD/2004/0152 ( Youth ) Ø COD/2004/0153 ( Education – lifelong learning ) Consumer Protection and Public Health Framework programme: Ø COD/2005/0042/A ( Public health ) Ø COD/2005/0042/B ( Consumers ) Programme in the fields of energy, environment and transport : Ø COD/2004/0218 ( LIFE+) Ø COD/2004/0154 ( TransEuropean networks in the areas of energy and transport ) Ø CNS/2004/0221 ( Decommissioning of the Bohunice nuclear plant ) GALILEO ( radio-navigation by satellite ): COD/2004/0156 In terms of new proposals , the Commission has already submitted three in the area of agriculture and rural development policy and fisheries and aquaculture policy: Ø CNS/2006/0081 ( fisheries and aquaculture ) Ø CNS/2006/0082 ( rural development ) Ø CNS/2006/0083 ( common agricultural policy ). Certain legislative acts do not form part of this package of measures, in particular those on which political agreement has been reached since 17 May. For these measures, the Commission has played a full part in helping to bring about agreement between the arms of the legislative authority. The same applies to the acts for which conclusion of the interinstitutional agreement does not modify the Commission’s original proposal. For all the others, which are included in the package presented, the changes proposed by the Commission take account of the content of the interinstitutional agreement adopted, either in a simplified form, where the financial resources allocated to each programme must be adapted, or in a more detailed form where the structure or even the content of the act must be revised. It should also be noted that four of the amended proposals contain amendments already voted on by the European Parliament at first reading and that one proposal has been divided into two amended proposals in response to a request by the Council and the European Parliament, although Parliament has not yet proceeded to a first reading of this proposal. Based on these amended proposals, the Commission calls on the European Parliament and the Council to continue their discussions of these proposals and conclude them as soon as possible in order to ensure that all the legal instruments are available in time for the effective launch of the programmes in January 2007. type: Document attached to the procedure body: EC
  • date: 2006-05-24T00:00:00 docs: url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2006&nu_doc=[%n] title: EUR-Lex title: COM(2004)0624/2 type: Modified legislative proposal body: EC
  • date: 2011-07-13T00:00:00 docs: url: http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2011/0432/COM_COM(2011)0432_EN.pdf title: COM(2011)0432 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=432 title: EUR-Lex summary: The Commission presents a report on the use of financial resources provided to Lithuania, Slovakia and Bulgaria to support the decommissioning of early shut-down nuclear power-plants under the Acts of Accession. The report assesses the implementation status of EU financial assistance, particularly covering the implementation of the decommissioning programme during the period 2004 – 2009. It also considers financial assistance from the preceding period and recent progress made in 2010 in order to provide a consistent and comprehensive picture. It recalls that the EU assistance programme is dedicated to the following NPPs: Ignalina NPP (INPP) units 1 and 2 in Lithuania. Bohunice V1 NPP (V1 NPP) units 1 and 2 in Slovakia and Kozloduy NPP (KNPP) units 1 to 4 in Bulgaria. All designated nuclear units in Lithuania, Slovakia and Bulgaria have been safely shut down in line with their Accession Agreements. Decommissioning works are currently ongoing. This situation has been achieved as a direct consequence of the successful implementation of the EU assistance programme, which have faced a variety of difficulties, at both the political and technical level. Considerable efforts were taken by Member States to renegotiate their political commitments, however through the EU`s expression of solidarity and the provision of appropriate financial assistance all countries respected their Accession Treaty commitments to shut down their reactor units. The boundary conditions for each country are unique and impact upon the choice of technology, strategy and reasoning associated with the selection of projects. Therefore it is difficult to present a direct comparison of the effectiveness of the EU assistance provided to each Member State. An assessment of the needs and capabilities was undertaken prior to the instigation of projects at each NPP. Identification and implementation of projects also benefited from a regular re-evaluation of the national strategies and decommissioning plans. Lithuania-Ignalina Nuclear Power Plant : Unit 1 was permanently shut down on 31 December 2004, and unit 2 on 31 ecember 2009. The total EU assistance to Lithuania between 1999 and 2013 is anticipated to be EUR 1367 million. The programme evolved within a difficult political climate. Up to 2009 Lithuania campaigned strongly to postpone the closure of unit 2 until 2012. The lack of commitment to closure impacted negatively on the progress towards decommissioning. Despite these difficulties, both units were finally shut down on schedule as prescribed in the Accession Treaty. Today they are safely maintained, and are in a decommissioning phase. As of today the reactor core of unit 1 has been completely defueled. No electricity shortages or black-out were experienced following the closures. Considering this difficult background, the performance towards decommissioning can be considered as satisfactory. Although delays have been experienced in some of the decommissioning projects and have given rise to additional costs, these delays have not as yet had a direct impact on the critical path of the decommissioning. However, the project "slack" has been exhausted and significant efforts will be required in order to avoid major delays and additional cost increases. Slovakia– Bohunice V1 Nuclear Power Plant : Unit 1 was permanently shut-down on 31 December 2006 and unit 2 on 31 December 2008. The total EU assistance to Slovakia between 1999 and 2013 is foreseen to be EUR 613 million. Since the beginning of the programme several issues such as: the reorganisation of JAVYS (the state-owned organisation responsible for the post-shut down supervision and for the decommissioning of V1 NPP), communication difficulties between the parties; the gas crisis in early 2009 have contributed to the complexity of the programme implementation and delays in some projects. Despite these difficulties, both units were shut down on schedule, and have been safely maintained. They are now in the decommissioning phase. No electricity shortages were experienced following the closure. As such the overall performance can be considered satisfactory. Delays experienced in some projects might have a negative impact on issuance of decommissioning license (scheduled for mid 2011). The EU continues to monitor closely the progress towards the achievement of this key milestone. Bulgaria – Kozloduy Nuclear Power Plant : Units 1 and 2 were shut down on 31 December 2002 and units 3 and 4 were shut down on 31 December 2006. The total EU assistance to Bulgaria between 1999 and 2013 is anticipated to be EUR 867.78 million. The decommissioning programme has progressed in a particularly unfavourable political context. In 2006 attempts were made to postpone the closures, and again, after 2006 to reopen the shutdown reactors. Despite these difficulties the overall performance of the programme can be considered satisfactory given that all units have been shut down as prescribed in the Accession Treaty. Units 1&2 are entirely defueled, the dry spent fuel storage is close to completion and first dismantling works have started. Waste treatment and storage facilities are under implementation. No electricity black-out occurred following the closure of the reactor units. The commitment of the current Bulgarian government, together with the separation of units 1&2 from 3&4 will support and impact positively on the timely progression of the decommissioning programme. A major benefit realised in relation to the EU assistance is the change in the decommissioning strategy from one of "deferred dismantling" to "immediate – continuous dismantling". This reduces the overall time for decommissioning and makes best use of available staff to execute dismantling works. This will have a positive impact on the overall costs for decommissioning. A substantial proportion of the funds have been allocated to energy projects to address consequences of the early-closure. Conclusion: the scale of the problem encountered by each country was a function of the different reactor types to be decommissioned, the state of the existing infrastructure required to support the decommissioning and waste management challenges, the possibilities regarding replacing the lost electrical generating capacity, the regulatory and political environment and the choice of decommissioning strategy. Despite initial difficulties, the reactors were shut-down on schedule and the majority have been de-fueled as a first important step towards irreversible closure and decommissioning of the NPPs. In each Member State the finances available for projects exceed the disbursements. The funds have been made available on an annual basis since 1999 at a time when Member States were not yet able to make full use of them. As a consequence, some funds have accumulated. More recently these funds have been utilised more effectively and efficiently and they will be fully absorbed within the next two years. Significant progress has been demonstrated for the three programmes over the past years and up to the end of the reporting period with the majority of the decommissioning and energy-sector-related projects having been identified or prepared and with a significant proportion already under implementation. In all countries the majority of funding was directed towards decommissioning and radioactive waste (RAW) management related projects. Lithuania and Bulgaria used a significant portion for spent fuel storage and waste management. Currently, the facilities necessary for decommissioning, treatment and storage of RAW and spent nuclear fuel are under construction, the licensing documentation is elaborated and first preparatory dismantling works have started. The energy sector has benefited where projects were in line with the EU and national energy policies. EU assistance was advanced from an early stage to the energy sector in order to address the loss of electricity generating capacity. This approach proved to be particularly beneficial and effective in the case of Bulgaria, in mitigating the effects of the recent energy and financial crises. Although delays occurred in some decommissioning projects, these are actively addressed to minimise their impact on the critical path of the decommissioning. The countries' legal framework and management structures continue to be adapted taking into account the changes from electricity producing companies to decommissioning organisations. Outlook: measures in the decommissioning and energy windows will continue up until the end of the financing perspective as guided by the strategies identified. Decommissioning related projects will be prioritised above energy related projects where funds are limited. The use of the EU assistance within the decommissioning window will be focusing on the completion of the necessary infrastructure, RAW treatment, the realisation of the necessary decommissioning licenses and on dismantling. New decommissioning organisation and management structures will be instigated and reinforced to address the dismantling activities, while the execution of the dismantling works by plant staff continues. Energy sector projects are well advanced. Actions in this area are currently considered to be sufficient. Although the final financial commitment will be made in 2013, the implementation of the works from these commitments will extend beyond this date. The aim of the EU assistance remains to provide assistance to the Member States rather than the full financing of the decommissioning or the full compensation of closure consequences. The assistance provided shall be complemented by adequate national resources. type: Follow-up document body: EC
  • date: 2011-07-13T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/sec/2011/0914/COM_SEC(2011)0914_EN.pdf title: SEC(2011)0914 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=SECfinal&an_doc=2011&nu_doc=914 title: EUR-Lex type: Follow-up document body: EC
events
  • date: 2004-09-29T00:00:00 type: Legislative proposal published body: EC docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0624/COM_COM(2004)0624_EN.pdf title: COM(2004)0624 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2004&nu_doc=624 title: EUR-Lex summary: PURPOSE : to provide financing for the decommissioning of the Bohunice V1 nuclear power plant in Slovakia. CONTENT : Slovakia has committed to closure of Unit 1 and Unit 2 of the Bohunice V1 nuclear power plant by 31 December 2006 and 31 December 2008, respectively, at the latest. The Union has expressed its willingness to continue to provide financial assistance up to 2006 as an extension of the pre-accession aid planned under the Phare programme in support of Slovakia's decommissioning efforts. In the Protocol the European Union has also recognised that decommissioning of the Bohunice V1 nuclear power plant will have to continue beyond the current Financial Perspectives and that this effort represents a significant financial burden for Slovakia. Decisions on the continuation of assistance from the Union in this field after 2006 will take account of this situation. With this proposal, the European Commission is calling for legislative measures needed for the European Union to continue granting financial assistance beyond 2006 to Slovakia for the closure of the Bohunice V1 nuclear power plant. The decommissioning of nuclear installations involves the commitment of considerable sums of money (about 15% of the investment cost of a reactor) and extends over an extremely long period of time. The measures financed by this support must obviously cover the technical operations involved in the decommissioning of nuclear installations. However, the plan is not to limit them to the technical aspects alone, but also to take account of other areas, such as security of energy supply, and the social aspects (redeployment of power plant staff). The contribution for certain measures may amount to up to 100% of the total expenditure. Every effort shall be made to continue the co-financing practice established under the preaccession assistance and the assistance given over the period 2004-2006 for Slovakia's decommissioning effort as well as to attract co-financing from other sources, as appropriate. The financial assistance may be made available as a Community contribution to the Bohunice International Decommissioning Support Fund managed by the European Bank for Reconstruction and Development. FINANCIAL IMPLICATIONS : - Budget line : the budget line used for the years 2004-2006 is 060505 nuclear safety – transitional measures (decommissioning). - Total : EUR 237 million. - Period of application : 2007-2013. - Impact on human resources : 2.5 permanent staff representing a total of EUR 270 000 per year (in addition to the financial envelope).
  • date: 2004-12-14T00:00:00 type: Committee referral announced in Parliament, 1st reading/single reading body: EP
  • date: 2005-09-26T00:00:00 type: Vote in committee, 1st reading/single reading body: EP summary: The committee adopted the report by Rebecca HARMS (Greens/EFA, DE) amending the proposal under the consultation procedure: - EU funding should be increased from EUR 237 million, as proposed by the Commission, to EUR 400 million for the period from 1 January 2007 to 31 December 2013, given that the estimated costs of the early closure and decommissioning of the two units of the Bohunice V1 nuclear power plant in Slovakia were much higher than the basis used for the Commission's calculation; - a new clause in Article 2 provided for the Commission to define the measures to be financed from the EU budget in more detail in 2006 after it had received the relevant Decommissioning Plan from the Slovak authorities. The Commission would take its annual decision on whether to approve the measures to be financed on the basis of that plan; - a new clause in Article 3 stipulated that the Community should continue to provide funding after 31 December 2013, on the grounds that decommissioning of the nuclear power plant was a lengthy process which would go far beyond that date.
  • date: 2005-10-05T00:00:00 type: Committee report tabled for plenary, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-282&language=EN title: A6-0282/2005
  • date: 2005-11-15T00:00:00 type: Debate in Parliament body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20051115&type=CRE title: Debate in Parliament
  • date: 2005-11-16T00:00:00 type: Results of vote in Parliament body: EP docs: url: https://oeil.secure.europarl.europa.eu/oeil/popups/sda.do?id=4302&l=en title: Results of vote in Parliament
  • date: 2005-11-16T00:00:00 type: Decision by Parliament, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-429 title: T6-0429/2005 summary: The European Parliament adopted a resolution on the Bohunice V1 nuclear power plant in Slovakia by 377 votes in favour to 222 against with 59 abstentions. (Please see the summary dated 26/09/2005.) Before the final vote Rebecca HARMS (Greens/EFA DE) withdrew her name from the report and asked Parliament to vote against the report because MEPs had voted to raise EU spending. Parliament felt that the estimated costs of the early closure and decommissioning of the two units are higher than the basis used for the Commission's calculation. Therefore, Parliament wanted to raise EU appropriations from EUR 237 million as in the Commission's proposal to EUR 400 million for the period from 1.1.2007 to 31.12.2013 . The additional amount of EUR 163 million should be made available by the European Union and especially to those Member States that will benefit from the closure of the nuclear power plant in the context of the annual budgetary procedure. Parliament also inserted a clause stating that the measures to be supported using Community budget will be defined in more detail by the Commission in 2006 after it receives the decommissioning plans comprising all the necessary information on decommissioning process from the Slovak authorities. On the basis of this plan the Commission will give its yearly approval to measures to be financed. The financial assistance from the Community budget should continue after 31.12.2013.
  • date: 2006-05-24T00:00:00 type: Modified legislative proposal published body: EC docs: url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2006&nu_doc=[%n] title: EUR-Lex title: COM(2004)0624/2
  • date: 2007-05-14T00:00:00 type: Act adopted by Council after consultation of Parliament body: EP/CSL
  • date: 2007-05-14T00:00:00 type: End of procedure in Parliament body: EP
  • date: 2007-05-23T00:00:00 type: Final act published in Official Journal summary: PURPOSE: to provide financing for the decommissioning of the Bohunice V1 nuclear power plant in Slovakia. LEGISLATIVE ACT : Council Regulation (Euratom) N° 549/2007 on the implementation of Protocol No 9 on Unit 1 and Unit 2 of the Bohunice V1 nuclear power plant in Slovakia to the Act concerning the conditions of accession to the European Union of the Czech Republic, Estonia, Cyprus, Latvia, Lithuania, Hungary, Malta, Poland, Slovenia and Slovakia. CONTENT: This Regulation establishes the programme laying down detailed rules for implementation of the Community’s financial contribution provided for in Protocol No 9 annexed to the 2003 Act of Accession. Protocol No 9 on Unit 1 and Unit 2 of the Bohunice V1 nuclear power plant in Slovakia, as annexed to the 2003 Act of Accession, reiterates Slovakia’s commitment to close the Bohunice V1 nuclear power plant and, to this end, established an assistance programme with a budget of EUR 90 million for the period 2004 to 2006. However, in Protocol No 9 the Union also recognised that decommissioning of the Bohunice V1 nuclear power plant would have to continue beyond the Financial Perspectives 2002 to 2006 and that this effort represented a significant financial burden for Slovakia. Bohunice V1 nuclear power plant over the period from 2007 to 2013. The Community contribution to the programme under the Regulation will be granted for the purpose of providing financial support for measures connected with the decommissioning of the Bohunice V1 nuclear power plant, measures for environmental upgrading in line with the acquis and for modernising conventional production capacity to replace the production capacity of the two reactors at the Bohunice V1 power plant and other measures which stem from the decision to close and decommission this plant and which contribute to the necessary restructuring, upgrading of the environment and modernisation of the energy production, transmission and distribution sectors in Slovakia as well as to enhancing security of supply and energy efficiency in Slovakia. The financial reference amount necessary for implementation of the programme 2 for the period from 1 January 2007 to 31 December 2013 shall be EUR 423 million . The amount of the appropriations allocated to the programme may be reviewed in the course of the period from 1 January 2007 to 31 December 2013 to take account of the progress made with implementation of the programme and ensure that the programming and allocation of the resources are based on actual payment needs and absorption capacity. Financial assistance for measures under the programme, or parts thereof, may be made available as a Community contribution to the Bohunice International Decommissioning Support Fund, managed by the EBRD. The Commission will ensure the implementation of this Regulation and shall report at regular intervals to the European Parliament and the Council. It will carry out a mid-term review, as stated above. The European Parliament shall be informed by the Commission of committee proceedings on a regular basis. To that end, it will receive agendas for committee meetings, and the results of voting and summary records of the meetings and lists of the authorities and organisations to which the persons designated by the Member States to represent them belong. ENTRY INTO FORCE : 12/06/2007. docs: title: Regulation 2007/549 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32007R0549 title: OJ L 131 23.05.2007, p. 0001 url: https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2007:131:TOC
other
  • body: EC dg: Energy and Transport commissioner: PIEBALGS Andris
procedure/dossier_of_the_committee
Old
ITRE/6/24210
New
  • ITRE/6/24210
procedure/final/url
Old
http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32007R0549
New
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32007R0549
procedure/instrument
Old
Regulation
New
  • Regulation
  • Repealed by 2011/0363(NLE)
procedure/subject
Old
  • 3.60.04 Nuclear energy, industry and safety
New
3.60.04
Nuclear energy, industry and safety
procedure/summary
  • Repealed by
activities/10/docs/1/url
Old
http://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2007:131:SOM:EN:HTML
New
http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2007:131:TOC
links/European Commission/title
Old
PreLex
New
EUR-Lex
activities
  • date: 2004-09-29T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0624/COM_COM(2004)0624_EN.pdf celexid: CELEX:52004PC0624(02):EN type: Legislative proposal published title: COM(2004)0624 type: Legislative proposal published body: EC commission: DG: Energy and Transport Commissioner: PIEBALGS Andris
  • date: 2004-12-14T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: False committee_full: Foreign Affairs committee: AFET body: EP responsible: False committee: BUDG date: 2004-10-26T00:00:00 committee_full: Budgets rapporteur: group: PPE-DE name: LEWANDOWSKI Janusz body: EP responsible: False committee_full: Environment, Public Health and Food Safety committee: ENVI body: EP responsible: True committee: ITRE date: 2005-03-15T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: Verts/ALE name: HARMS Rebecca
  • date: 2005-09-26T00:00:00 body: EP committees: body: EP responsible: False committee_full: Foreign Affairs committee: AFET body: EP responsible: False committee: BUDG date: 2004-10-26T00:00:00 committee_full: Budgets rapporteur: group: PPE-DE name: LEWANDOWSKI Janusz body: EP responsible: False committee_full: Environment, Public Health and Food Safety committee: ENVI body: EP responsible: True committee: ITRE date: 2005-03-15T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: Verts/ALE name: HARMS Rebecca type: Vote in committee, 1st reading/single reading
  • date: 2005-10-05T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-282&language=EN type: Committee report tabled for plenary, 1st reading/single reading title: A6-0282/2005 body: EP committees: body: EP responsible: False committee_full: Foreign Affairs committee: AFET body: EP responsible: False committee: BUDG date: 2004-10-26T00:00:00 committee_full: Budgets rapporteur: group: PPE-DE name: LEWANDOWSKI Janusz body: EP responsible: False committee_full: Environment, Public Health and Food Safety committee: ENVI body: EP responsible: True committee: ITRE date: 2005-03-15T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: Verts/ALE name: HARMS Rebecca type: Committee report tabled for plenary, 1st reading/single reading
  • date: 2005-11-15T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20051115&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
  • date: 2005-11-16T00:00:00 docs: url: http://www.europarl.europa.eu/oeil/popups/sda.do?id=4302&l=en type: Results of vote in Parliament title: Results of vote in Parliament url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-429 type: Decision by Parliament, 1st reading/single reading title: T6-0429/2005 body: EP type: Results of vote in Parliament
  • date: 2006-05-24T00:00:00 docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2006&nu_doc=[%n] celexid: CELEX:52004PC0624(02):EN type: Modified legislative proposal published title: COM(2004)0624/2 type: Modified legislative proposal published body: EC commission: DG: Energy and Transport Commissioner: PIEBALGS Andris
  • date: 2007-05-14T00:00:00 body: CSL type: Council Meeting council: General Affairs meeting_id: 2799
  • date: 2007-05-14T00:00:00 body: EP type: End of procedure in Parliament
  • date: 2007-05-14T00:00:00 body: EP/CSL type: Act adopted by Council after consultation of Parliament
  • date: 2007-05-23T00:00:00 type: Final act published in Official Journal docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32007R0549 title: Regulation 2007/549 url: http://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2007:131:SOM:EN:HTML title: OJ L 131 23.05.2007, p. 0001
committees
  • body: EP responsible: False committee_full: Foreign Affairs committee: AFET
  • body: EP responsible: False committee: BUDG date: 2004-10-26T00:00:00 committee_full: Budgets rapporteur: group: PPE-DE name: LEWANDOWSKI Janusz
  • body: EP responsible: False committee_full: Environment, Public Health and Food Safety committee: ENVI
  • body: EP responsible: True committee: ITRE date: 2005-03-15T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: Verts/ALE name: HARMS Rebecca
links
European Commission
other
  • body: EC dg: Energy and Transport commissioner: PIEBALGS Andris
procedure
dossier_of_the_committee
ITRE/6/24210
geographical_area
Slovakia
reference
2004/0221(CNS)
instrument
Regulation
legal_basis
Euratom Treaty A 203
stage_reached
Procedure completed
summary
Repealed by
subtype
Legislation
title
Nuclear energy: Bohunice V1 nuclear power plant in Slovakia, implementation of the Protocol No 9 annexed to the Accession Act 2004
type
CNS - Consultation procedure
final
subject
3.60.04 Nuclear energy, industry and safety