2007/05/04
   EC - Follow-up document
Details

This is the third annual MAP progress report. To recall, MAP was set up, initially, to cover the period 2001-2005 but was later extended to the end of 2006. The report covers the three financial instruments set up by MAP namely: the SME Guarantee Facility; the ETF Start-up Facility and the Seed Capital Action.

SME Guarantee Facility: The objective of this Facility is to promote entrepreneurship, enhance growth and competitiveness and to improve the overall financial environment for SMEs in the Community. It does so by seeking to encourage the growth of SMEs through increasing their debt financing. The Facility provides higher volumes of guarantees for existing guarantee products of the Financial Intermediaries (FIs); by offering access to financing for a larger number of small companies and by offering a wider variety of investments and guarantees for riskier loans. In addition, the SME Guarantee Facility covers part of the losses incurred under the guarantees up to a pre-determined amount (the cap). It applies only to companies with up to 100 employees. In short, the Facility offers: Loan Guarantees; Micro-credit Guarantees; Equity Guarantees; and ICT Guarantees.

At the end of 2005, the budgetary resources committed under the SME Guarantee Facility amounted to EUR 267.50 million – representing 64.3% of the total MAP budget. As far as the “utilisation” of the Facility is concerned (meaning the aggregate volume of guarantees issued by the EIF in relation to the signed agreements between the EIF and the FIs under the facility), at the end of 2005 the average utilisation reached 67% for the Loan Guarantee window, 66% for the Micro-credit window and 65% for the Equity window. This is fully in line with expectations.

Guarantee schemes, in general, have a very high leverage effect as do Loan Guarantees as they are often provided in the form of counter-guarantees to institutions that in turn provide guarantees to other actors such as intermediaries and banks. Due to the risk-sharing between these various actors the leverage, in terms of volume of loans supported, is very high.

The number of final beneficiaries increased progressively and stood at nearly 140 000 at the end of 2005 (of which more than 115 000 under the Loan Guarantee window). In 2005 about 570 000 persons were recorded as employed at the date of the loan issues against less than 310 000 in 2004. At the end of 2005 Final Beneficiaries with up to 10 employees made up 91% of the total number of SME’s under the Loan Guarantee window, 100% under the Micro-credit window and 64% under the Equity Guarantee window. These figures clearly demonstrate that the SME Guarantee Facility remains focused on its target population as set out in the EU “Charter for small enterprises”.

ETF Start-up Facility: The purpose of the ETF Start-up Facility is to increase the availability of risk capital to innovative SMEs during their creation and their early state development. It invests in specialised venture capital (VC) funds that have been made available to provide equity or other forms of risk capital to SMEs. At the end of 2005 the budgetary resources committed under the ETF Start-up amounted to EUR 143.20 million, representing 34.4% of the MAP budget.

Since the start of MAP, 12 requests for approval have been submitted to the European Commission for approval. Nine have been signed by the EIF with VC funds. One investment of EUR 15 million in Germany is still under negotiations. For the remaining two approved proposals, the operations have not materialised. Five out of the ten contracts were signed in 2005. Several deals are still in the pipeline. If successful they should materialise in the course of 2006.

In general, the VC funds, in which the EIF has invested, have an international, national or regional focus. Funds are mainly oriented towards early stage investments in high technology sectors, such as information and communication technologies, internet, healthcare and life sciences. Given that the VC funds are still in the early stages of their investment periods it is too early to provide any meaningful data on their employment potential. Up to December 2005, the VC funds had invested in 35 portfolio companies, which reported a total of 568 employees as of June 2005.

Seed Capital Action: The purpose of the Seed Capital Action is to stimulate the supply of capital for the creation of innovative new businesses with growth and job creation potential, including those in the traditional economy, through support for seed funds, incubators or similar schemes. At the end of 2005 the budgetary resources committed under the SCA amounted to EUR 5.6 million, representing 1.3% of the MAP budget committed until the end of 2005. The VC funds approved through the SCA scheme have contractual agreements with the EIF under the ETF Start-up initiative. By the end of 2005 three grant agreements were signed with the two VC funds.

Conclusions: The Commission concludes its report by stating that the SME Guarantee Facility has had a positive market take-up. The Loan Guarantee and the Micro-credit windows have been particularly successful allowing the participating Financial Intermediaries to increase volumes and to take on more risk. At the end of 2005 the Facility covered 27 countries and 45 portfolios of 41 Financial Intermediaries.

The implementation of the ETF Start-up Facility has, on the other hand, faced some difficulties in the period 2002 to 2003, due to the difficult fundraising situation prevailing on the EU venture capital market. Precisely for this reason, the report argues, the ETF Start-up Facility has a key role to play as a unique and important European financial instrument fostering investments in strategic sectors. The demand for early stage funding remains important and European technology centres (especially research centres and universities) continue to generate valuable results in terms of concepts and intellectual property rights.

Regarding Seed Capital Actions, the programme has not been as successful as originally hoped – largely due to constraints relating to eligibility criteria and difficult market conditions for venture capital in the MAP starting period. Only three grant agreements have been signed so far.

The successor programme to MAP, the “Competitiveness and Innovation Programme” or CIP was adopted in 2006. CIP will bring together, within a coherent framework, specific Community support programmes and relevant parts of other Community programmes in the fields most critical to boosting European productivity and innovation capacity whilst at the same time respecting environmental concerns.

2005/11/03
   Final act published in Official Journal
Details

PURPOSE : to prolong the Multiannual programme for enterprise and entrepreneurship and to increase the financial reference amount and to amend Council Decision 2000/819/EC.

LEGISLATIVE ACT : Decision 1776/2005/EC of the European Parliament and of the Council amending Council Decision 2000/819/EC on a multiannual programme for enterprise and entrepreneurship, and in particular for small and medium-sized enterprises (SMEs) (2001 to 2005).

CONTENT : this Decision aims to ensure the continuity of Community support for enterprise and entrepreneurship, and in particular for small and medium-sized enterprises (SMEs). It extends the period of validity of Decision 2000/819/EC by another year until 31 December 2006 and increase the financial reference amount by EUR 88,5 million.

The financial reference amount of EUR 450 million shall be replaced by EUR 538,5 million.

2005/09/28
   CSL - Draft final act
Documents
2005/09/28
   CSL - Final act signed
2005/09/28
   EP - End of procedure in Parliament
2005/07/18
   EP/CSL - Act adopted by Council after Parliament's 1st reading
2005/07/18
   CSL - Council Meeting
2005/06/16
   EC - Commission response to text adopted in plenary
Documents
2005/05/26
   EP - Text adopted by Parliament, 1st reading/single reading
Details

The European Parliament adopted a resolution drafted by Britta THOMSEN (PES, DK) and made one amendment to the Commission’s proposal, increasing the overall budget. (Please see the summary of 26/04/2005).

2005/05/26
   EP - Results of vote in Parliament
2005/05/26
   EP - Decision by Parliament, 1st reading
Details

The European Parliament adopted a resolution drafted by Britta THOMSEN (PES, DK) and made one amendment to the Commission’s proposal, increasing the overall budget. (Please see the summary of 26/04/2005).

Documents
2005/05/25
   EP - Debate in Parliament
2005/04/27
   EP - Committee report tabled for plenary, 1st reading/single reading
Documents
2005/04/27
   EP - Committee report tabled for plenary, 1st reading
Documents
2005/04/26
   EP - Vote in committee, 1st reading
Details

The committee adopted the report by Britta THOMSEN (PES, DK) approving the proposal under the 1st reading of the codecision procedure, subject to just one amendment increasing the overall budget from EUR 531.5 million, as proposed by the Commission, to EUR 538.5 million in order to bring the budget for 2006 closer to the budgeted amount for 2004 (EUR 91 million).

2005/03/09
   ESC - Economic and Social Committee: opinion, report
2005/01/27
   EP - THOMSEN Britta (PSE) appointed as rapporteur in ITRE
2004/12/14
   EP - Committee referral announced in Parliament, 1st reading
2004/12/07
   EC - Legislative proposal
Details

PURPOSE : to prolong the Multiannual programme for enterprise and entrepreneurship and to increase the financial reference amount and to amend Council Decision 2000/819/EC.

CONTENT : the multiannual programme (MAP) for enterprise and entrepreneurship, and in particular for small and medium-sized enterprises (SMEs) was adopted on 20 December 2000 to run from 1 January 2001 to 31 December 2005, with a budget of EUR 450 million.

The implementation of the MAP has been subject to regular evaluations. A public consultation on possible elements of a future support programme for entrepreneurship and enterprise competitiveness, to succeed the MAP, was carried out by the Commission in 2004. This consultation indicated strong support for a wider basis for policy analyses, development and co-ordination as well as for specific measures to help enterprises to be competitive and innovative.

The proposed successor programme would have begun in 2006, under the current financial perspective, and ended in 2010, the target date for achieving the ambitious objectives set by the Lisbon agenda. The challenge for the new programme would therefore be to contribute to competitiveness in a more comprehensive way than achieved by the MAP. Subsequent to the evaluation and the public consultation, the Commission decided that a framework programme would have the greatest potential to boost innovation and competitiveness. The Commission proposed, in a Communication of 14 July 2004, to prepare such a framework programme in the context of the new financial perspective (2007-13).

It is not possible to present such a Commission proposal for a framework programme on innovation and competitiveness in 2004 in order to ensure its operation as of 1 January 2006. The framework programme for innovation and competitiveness should also dovetail with the 7 th Framework Programme for Research. Consequently, both new framework programmes should start consecutively on 1 January 2007.

Nevertheless, it is essential to ensure continuity of Community support for the improvement of the business environment and for the growth and competitiveness of enterprises, in particular SMEs. It is therefore important to avoid any disruption of the instruments operated under the MAP. In view of these circumstances, the Commission proposes that the current programme, as amended in 2004, should be prolonged until 31 December 2006. The financial reference amount should be increased by EUR 81.5 million.

FINANCIAL IMPLICATIONS :

- Budget lines and headings: the following existing budget lines: 010405: Improvement of the financial environment for SMEs; 02020301: Multiannual Programme for Enterprise and Entrepreneurship, and in particular for SMEs; 02010404: Administrative support.

- Overall figures: Total allocation for action: EUR 81.5 million for commitment. This amount represents the budgetary impact of the proposal to prolong the existing programme, which is due to end on 31 December 2005, for the additional year to 31 December 2006.

- Period of application: 1 January 2006 - 31 December 2006.

- Payment appropriations may extend beyond the end of the legal base until 31 December 2008.

- Overall estimate of expenditure (commitment and payment appropriations): EUR 74.700 million.

- Technical and administrative assistance and support expenditure: EUR 6.800 million.

- Overall financial impact of human resources and other administrative expenditure: EUR 8.914.

- Total cost : EUR 90.414.

2004/12/06
   EC - Legislative proposal published
Details

PURPOSE : to prolong the Multiannual programme for enterprise and entrepreneurship and to increase the financial reference amount and to amend Council Decision 2000/819/EC.

CONTENT : the multiannual programme (MAP) for enterprise and entrepreneurship, and in particular for small and medium-sized enterprises (SMEs) was adopted on 20 December 2000 to run from 1 January 2001 to 31 December 2005, with a budget of EUR 450 million.

The implementation of the MAP has been subject to regular evaluations. A public consultation on possible elements of a future support programme for entrepreneurship and enterprise competitiveness, to succeed the MAP, was carried out by the Commission in 2004. This consultation indicated strong support for a wider basis for policy analyses, development and co-ordination as well as for specific measures to help enterprises to be competitive and innovative.

The proposed successor programme would have begun in 2006, under the current financial perspective, and ended in 2010, the target date for achieving the ambitious objectives set by the Lisbon agenda. The challenge for the new programme would therefore be to contribute to competitiveness in a more comprehensive way than achieved by the MAP. Subsequent to the evaluation and the public consultation, the Commission decided that a framework programme would have the greatest potential to boost innovation and competitiveness. The Commission proposed, in a Communication of 14 July 2004, to prepare such a framework programme in the context of the new financial perspective (2007-13).

It is not possible to present such a Commission proposal for a framework programme on innovation and competitiveness in 2004 in order to ensure its operation as of 1 January 2006. The framework programme for innovation and competitiveness should also dovetail with the 7 th Framework Programme for Research. Consequently, both new framework programmes should start consecutively on 1 January 2007.

Nevertheless, it is essential to ensure continuity of Community support for the improvement of the business environment and for the growth and competitiveness of enterprises, in particular SMEs. It is therefore important to avoid any disruption of the instruments operated under the MAP. In view of these circumstances, the Commission proposes that the current programme, as amended in 2004, should be prolonged until 31 December 2006. The financial reference amount should be increased by EUR 81.5 million.

FINANCIAL IMPLICATIONS :

- Budget lines and headings: the following existing budget lines: 010405: Improvement of the financial environment for SMEs; 02020301: Multiannual Programme for Enterprise and Entrepreneurship, and in particular for SMEs; 02010404: Administrative support.

- Overall figures: Total allocation for action: EUR 81.5 million for commitment. This amount represents the budgetary impact of the proposal to prolong the existing programme, which is due to end on 31 December 2005, for the additional year to 31 December 2006.

- Period of application: 1 January 2006 - 31 December 2006.

- Payment appropriations may extend beyond the end of the legal base until 31 December 2008.

- Overall estimate of expenditure (commitment and payment appropriations): EUR 74.700 million.

- Technical and administrative assistance and support expenditure: EUR 6.800 million.

- Overall financial impact of human resources and other administrative expenditure: EUR 8.914.

- Total cost : EUR 90.414.

Documents

History

(these mark the time of scraping, not the official date of the change)

docs/0
date
2004-12-07T00:00:00
docs
summary
type
Legislative proposal
body
EC
docs/1
date
2005-03-10T00:00:00
docs
title: PE355.548
type
Committee draft report
body
EP
docs/2
date
2005-04-05T00:00:00
docs
title: PE357.524
type
Amendments tabled in committee
body
EP
docs/3
date
2005-04-25T00:00:00
docs
title: PE357.674
committee
BUDG
type
Committee opinion
body
EP
docs/6
date
2007-05-04T00:00:00
docs
summary
type
Follow-up document
body
EC
docs/6/docs/0/url
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2007/0235/COM_COM(2007)0235_EN.pdf
New
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2007/0235/COM_COM(2007)0235_EN.pdf
docs/8
date
2007-05-04T00:00:00
docs
summary
type
Follow-up document
body
EC
events/0
date
2004-12-06T00:00:00
type
Legislative proposal published
body
EC
docs
summary
events/0
date
2004-12-07T00:00:00
type
Legislative proposal published
body
EC
docs
summary
events/10/docs/1/url
Old
https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2005:289:TOC
New
https://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2005:289:SOM:EN:HTML
docs/0/docs/0/url
Old
https://dm.eesc.europa.eu/EESCDocumentSearch/Pages/redresults.aspx?k=(documenttype:AC)(documentnumber:0245)(documentyear:2005)(documentlanguage:EN)
New
https://dmsearch.eesc.europa.eu/search/public?k=(documenttype:AC)(documentnumber:0245)(documentyear:2005)(documentlanguage:EN)
docs/4/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/A-6-2005-0118_EN.html
New
https://www.europarl.europa.eu/doceo/document/A-6-2005-0118_EN.html
docs/5/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/TA-6-2005-0189_EN.html
New
https://www.europarl.europa.eu/doceo/document/TA-6-2005-0189_EN.html
docs/8/docs/0/url
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2007/0235/COM_COM(2007)0235_EN.pdf
New
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2007/0235/COM_COM(2007)0235_EN.pdf
events/1/type
Old
Committee referral announced in Parliament, 1st reading/single reading
New
Committee referral announced in Parliament, 1st reading
events/2/type
Old
Vote in committee, 1st reading/single reading
New
Vote in committee, 1st reading
events/3
date
2005-04-27T00:00:00
type
Committee report tabled for plenary, 1st reading
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-6-2005-0118_EN.html title: A6-0118/2005
events/3
date
2005-04-27T00:00:00
type
Committee report tabled for plenary, 1st reading/single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/A-6-2005-0118_EN.html title: A6-0118/2005
events/4/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20050525&type=CRE
New
https://www.europarl.europa.eu/doceo/document/EN&reference=20050525&type=CRE
events/6
date
2005-05-26T00:00:00
type
Decision by Parliament, 1st reading
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/TA-6-2005-0189_EN.html title: T6-0189/2005
summary
The European Parliament adopted a resolution drafted by Britta THOMSEN (PES, DK) and made one amendment to the Commission’s proposal, increasing the overall budget. (Please see the summary of 26/04/2005).
events/6
date
2005-05-26T00:00:00
type
Decision by Parliament, 1st reading/single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/TA-6-2005-0189_EN.html title: T6-0189/2005
summary
The European Parliament adopted a resolution drafted by Britta THOMSEN (PES, DK) and made one amendment to the Commission’s proposal, increasing the overall budget. (Please see the summary of 26/04/2005).
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Industry, Research and Energy
committee
ITRE
rapporteur
name: THOMSEN Britta date: 2005-01-27T00:00:00 group: Socialist Group in the European Parliament abbr: PSE
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Industry, Research and Energy
committee
ITRE
date
2005-01-27T00:00:00
rapporteur
name: THOMSEN Britta group: Socialist Group in the European Parliament abbr: PSE
docs/0/docs/1/url
Old
https://eur-lex.europa.eu/JOHtml.do?uri=OJ:C:2005:234:SOM:EN:HTML
New
https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:C:2005:234:TOC
docs/4/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-118&language=EN
New
http://www.europarl.europa.eu/doceo/document/A-6-2005-0118_EN.html
docs/5/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-189
New
http://www.europarl.europa.eu/doceo/document/TA-6-2005-0189_EN.html
docs/6/body
EC
events/3/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-118&language=EN
New
http://www.europarl.europa.eu/doceo/document/A-6-2005-0118_EN.html
events/6/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-189
New
http://www.europarl.europa.eu/doceo/document/TA-6-2005-0189_EN.html
events/10/docs/1/url
Old
https://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2005:289:SOM:EN:HTML
New
https://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2005:289:TOC
activities
  • date: 2004-12-07T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0781/COM_COM(2004)0781_EN.pdf title: COM(2004)0781 type: Legislative proposal published celexid: CELEX:52004PC0781:EN body: EC commission: DG: url: http://ec.europa.eu/enterprise/ title: Enterprise and Industry type: Legislative proposal published
  • date: 2004-12-14T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: False committee_full: Budgets committee: BUDG body: EP responsible: True committee: ITRE date: 2005-01-27T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: PSE name: THOMSEN Britta
  • date: 2005-04-26T00:00:00 body: EP committees: body: EP responsible: False committee_full: Budgets committee: BUDG body: EP responsible: True committee: ITRE date: 2005-01-27T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: PSE name: THOMSEN Britta type: Vote in committee, 1st reading/single reading
  • date: 2005-04-27T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-118&language=EN type: Committee report tabled for plenary, 1st reading/single reading title: A6-0118/2005 body: EP committees: body: EP responsible: False committee_full: Budgets committee: BUDG body: EP responsible: True committee: ITRE date: 2005-01-27T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: PSE name: THOMSEN Britta type: Committee report tabled for plenary, 1st reading/single reading
  • date: 2005-05-25T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20050525&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
  • date: 2005-05-26T00:00:00 docs: url: http://www.europarl.europa.eu/oeil/popups/sda.do?id=4035&l=en type: Results of vote in Parliament title: Results of vote in Parliament url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-189 type: Decision by Parliament, 1st reading/single reading title: T6-0189/2005 body: EP type: Results of vote in Parliament
  • date: 2005-07-18T00:00:00 body: CSL type: Council Meeting council: Agriculture and Fisheries meeting_id: 2676
  • date: 2005-07-18T00:00:00 body: EP/CSL type: Act adopted by Council after Parliament's 1st reading
  • date: 2005-09-28T00:00:00 body: CSL type: Final act signed
  • date: 2005-09-28T00:00:00 body: EP type: End of procedure in Parliament
  • date: 2005-11-03T00:00:00 type: Final act published in Official Journal docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32005D1776 title: Decision 2005/1776 url: http://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2005:289:SOM:EN:HTML title: OJ L 289 03.11.2005, p. 0014-0014
commission
  • body: EC dg: Internal Market, Industry, Entrepreneurship and SMEs commissioner: --
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Industry, Research and Energy
committee
ITRE
date
2005-01-27T00:00:00
rapporteur
name: THOMSEN Britta group: Socialist Group in the European Parliament abbr: PSE
committees/0
body
EP
responsible
False
committee_full
Budgets
committee
BUDG
committees/1
type
Committee Opinion
body
EP
associated
False
committee_full
Budgets
committee
BUDG
opinion
False
committees/1
body
EP
responsible
True
committee
ITRE
date
2005-01-27T00:00:00
committee_full
Industry, Research and Energy
rapporteur
group: PSE name: THOMSEN Britta
council
  • body: CSL type: Council Meeting council: Agriculture and Fisheries meeting_id: 2676 url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=SMPL&ROWSPP=25&RESULTSET=1&NRROWS=500&DOC_LANCD=EN&ORDERBY=DOC_DATE+DESC&CONTENTS=2676*&MEET_DATE=18/07/2005 date: 2005-07-18T00:00:00
docs
  • date: 2005-03-09T00:00:00 docs: url: https://dm.eesc.europa.eu/EESCDocumentSearch/Pages/redresults.aspx?k=(documenttype:AC)(documentnumber:0245)(documentyear:2005)(documentlanguage:EN) title: CES0245/2005 url: https://eur-lex.europa.eu/JOHtml.do?uri=OJ:C:2005:234:SOM:EN:HTML title: OJ C 234 22.09.2005, p. 0014-0016 type: Economic and Social Committee: opinion, report body: ESC
  • date: 2005-03-10T00:00:00 docs: title: PE355.548 type: Committee draft report body: EP
  • date: 2005-04-05T00:00:00 docs: title: PE357.524 type: Amendments tabled in committee body: EP
  • date: 2005-04-25T00:00:00 docs: title: PE357.674 committee: BUDG type: Committee opinion body: EP
  • date: 2005-04-27T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-118&language=EN title: A6-0118/2005 type: Committee report tabled for plenary, 1st reading/single reading body: EP
  • date: 2005-05-26T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-189 title: T6-0189/2005 url: https://eur-lex.europa.eu/JOHtml.do?uri=OJ:C:2006:117E:SOM:EN:HTML title: OJ C 117 18.05.2006, p. 0019-0117 E summary: The European Parliament adopted a resolution drafted by Britta THOMSEN (PES, DK) and made one amendment to the Commission’s proposal, increasing the overall budget. (Please see the summary of 26/04/2005). type: Text adopted by Parliament, 1st reading/single reading body: EP
  • date: 2005-06-16T00:00:00 docs: url: /oeil/spdoc.do?i=4035&j=0&l=en title: SP(2005)2482/2 type: Commission response to text adopted in plenary
  • date: 2005-09-28T00:00:00 docs: url: http://register.consilium.europa.eu/content/out?lang=EN&typ=SET&i=ADV&RESULTSET=1&DOC_ID=3635%2F05&DOC_LANCD=EN&ROWSPP=25&NRROWS=500&ORDERBY=DOC_DATE+DESC title: 03635/1/2005 type: Draft final act body: CSL
  • date: 2007-05-04T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2007/0235/COM_COM(2007)0235_EN.pdf title: COM(2007)0235 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2007&nu_doc=235 title: EUR-Lex summary: This is the third annual MAP progress report. To recall, MAP was set up, initially, to cover the period 2001-2005 but was later extended to the end of 2006. The report covers the three financial instruments set up by MAP namely: the SME Guarantee Facility; the ETF Start-up Facility and the Seed Capital Action. SME Guarantee Facility: The objective of this Facility is to promote entrepreneurship, enhance growth and competitiveness and to improve the overall financial environment for SMEs in the Community. It does so by seeking to encourage the growth of SMEs through increasing their debt financing. The Facility provides higher volumes of guarantees for existing guarantee products of the Financial Intermediaries (FIs); by offering access to financing for a larger number of small companies and by offering a wider variety of investments and guarantees for riskier loans. In addition, the SME Guarantee Facility covers part of the losses incurred under the guarantees up to a pre-determined amount (the cap). It applies only to companies with up to 100 employees. In short, the Facility offers: Loan Guarantees; Micro-credit Guarantees; Equity Guarantees; and ICT Guarantees. At the end of 2005, the budgetary resources committed under the SME Guarantee Facility amounted to EUR 267.50 million – representing 64.3% of the total MAP budget. As far as the “utilisation” of the Facility is concerned (meaning the aggregate volume of guarantees issued by the EIF in relation to the signed agreements between the EIF and the FIs under the facility), at the end of 2005 the average utilisation reached 67% for the Loan Guarantee window, 66% for the Micro-credit window and 65% for the Equity window. This is fully in line with expectations. Guarantee schemes, in general, have a very high leverage effect as do Loan Guarantees as they are often provided in the form of counter-guarantees to institutions that in turn provide guarantees to other actors such as intermediaries and banks. Due to the risk-sharing between these various actors the leverage, in terms of volume of loans supported, is very high. The number of final beneficiaries increased progressively and stood at nearly 140 000 at the end of 2005 (of which more than 115 000 under the Loan Guarantee window). In 2005 about 570 000 persons were recorded as employed at the date of the loan issues against less than 310 000 in 2004. At the end of 2005 Final Beneficiaries with up to 10 employees made up 91% of the total number of SME’s under the Loan Guarantee window, 100% under the Micro-credit window and 64% under the Equity Guarantee window. These figures clearly demonstrate that the SME Guarantee Facility remains focused on its target population as set out in the EU “Charter for small enterprises”. ETF Start-up Facility: The purpose of the ETF Start-up Facility is to increase the availability of risk capital to innovative SMEs during their creation and their early state development. It invests in specialised venture capital (VC) funds that have been made available to provide equity or other forms of risk capital to SMEs. At the end of 2005 the budgetary resources committed under the ETF Start-up amounted to EUR 143.20 million, representing 34.4% of the MAP budget. Since the start of MAP, 12 requests for approval have been submitted to the European Commission for approval. Nine have been signed by the EIF with VC funds. One investment of EUR 15 million in Germany is still under negotiations. For the remaining two approved proposals, the operations have not materialised. Five out of the ten contracts were signed in 2005. Several deals are still in the pipeline. If successful they should materialise in the course of 2006. In general, the VC funds, in which the EIF has invested, have an international, national or regional focus. Funds are mainly oriented towards early stage investments in high technology sectors, such as information and communication technologies, internet, healthcare and life sciences. Given that the VC funds are still in the early stages of their investment periods it is too early to provide any meaningful data on their employment potential. Up to December 2005, the VC funds had invested in 35 portfolio companies, which reported a total of 568 employees as of June 2005. Seed Capital Action: The purpose of the Seed Capital Action is to stimulate the supply of capital for the creation of innovative new businesses with growth and job creation potential, including those in the traditional economy, through support for seed funds, incubators or similar schemes. At the end of 2005 the budgetary resources committed under the SCA amounted to EUR 5.6 million, representing 1.3% of the MAP budget committed until the end of 2005. The VC funds approved through the SCA scheme have contractual agreements with the EIF under the ETF Start-up initiative. By the end of 2005 three grant agreements were signed with the two VC funds. Conclusions: The Commission concludes its report by stating that the SME Guarantee Facility has had a positive market take-up. The Loan Guarantee and the Micro-credit windows have been particularly successful allowing the participating Financial Intermediaries to increase volumes and to take on more risk. At the end of 2005 the Facility covered 27 countries and 45 portfolios of 41 Financial Intermediaries. The implementation of the ETF Start-up Facility has, on the other hand, faced some difficulties in the period 2002 to 2003, due to the difficult fundraising situation prevailing on the EU venture capital market. Precisely for this reason, the report argues, the ETF Start-up Facility has a key role to play as a unique and important European financial instrument fostering investments in strategic sectors. The demand for early stage funding remains important and European technology centres (especially research centres and universities) continue to generate valuable results in terms of concepts and intellectual property rights. Regarding Seed Capital Actions, the programme has not been as successful as originally hoped – largely due to constraints relating to eligibility criteria and difficult market conditions for venture capital in the MAP starting period. Only three grant agreements have been signed so far. The successor programme to MAP, the “Competitiveness and Innovation Programme” or CIP was adopted in 2006. CIP will bring together, within a coherent framework, specific Community support programmes and relevant parts of other Community programmes in the fields most critical to boosting European productivity and innovation capacity whilst at the same time respecting environmental concerns. type: Follow-up document body: EC
events
  • date: 2004-12-07T00:00:00 type: Legislative proposal published body: EC docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0781/COM_COM(2004)0781_EN.pdf title: COM(2004)0781 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2004&nu_doc=781 title: EUR-Lex summary: PURPOSE : to prolong the Multiannual programme for enterprise and entrepreneurship and to increase the financial reference amount and to amend Council Decision 2000/819/EC. CONTENT : the multiannual programme (MAP) for enterprise and entrepreneurship, and in particular for small and medium-sized enterprises (SMEs) was adopted on 20 December 2000 to run from 1 January 2001 to 31 December 2005, with a budget of EUR 450 million. The implementation of the MAP has been subject to regular evaluations. A public consultation on possible elements of a future support programme for entrepreneurship and enterprise competitiveness, to succeed the MAP, was carried out by the Commission in 2004. This consultation indicated strong support for a wider basis for policy analyses, development and co-ordination as well as for specific measures to help enterprises to be competitive and innovative. The proposed successor programme would have begun in 2006, under the current financial perspective, and ended in 2010, the target date for achieving the ambitious objectives set by the Lisbon agenda. The challenge for the new programme would therefore be to contribute to competitiveness in a more comprehensive way than achieved by the MAP. Subsequent to the evaluation and the public consultation, the Commission decided that a framework programme would have the greatest potential to boost innovation and competitiveness. The Commission proposed, in a Communication of 14 July 2004, to prepare such a framework programme in the context of the new financial perspective (2007-13). It is not possible to present such a Commission proposal for a framework programme on innovation and competitiveness in 2004 in order to ensure its operation as of 1 January 2006. The framework programme for innovation and competitiveness should also dovetail with the 7 th Framework Programme for Research. Consequently, both new framework programmes should start consecutively on 1 January 2007. Nevertheless, it is essential to ensure continuity of Community support for the improvement of the business environment and for the growth and competitiveness of enterprises, in particular SMEs. It is therefore important to avoid any disruption of the instruments operated under the MAP. In view of these circumstances, the Commission proposes that the current programme, as amended in 2004, should be prolonged until 31 December 2006. The financial reference amount should be increased by EUR 81.5 million. FINANCIAL IMPLICATIONS : - Budget lines and headings: the following existing budget lines: 010405: Improvement of the financial environment for SMEs; 02020301: Multiannual Programme for Enterprise and Entrepreneurship, and in particular for SMEs; 02010404: Administrative support. - Overall figures: Total allocation for action: EUR 81.5 million for commitment. This amount represents the budgetary impact of the proposal to prolong the existing programme, which is due to end on 31 December 2005, for the additional year to 31 December 2006. - Period of application: 1 January 2006 - 31 December 2006. - Payment appropriations may extend beyond the end of the legal base until 31 December 2008. - Overall estimate of expenditure (commitment and payment appropriations): EUR 74.700 million. - Technical and administrative assistance and support expenditure: EUR 6.800 million. - Overall financial impact of human resources and other administrative expenditure: EUR 8.914. - Total cost : EUR 90.414.
  • date: 2004-12-14T00:00:00 type: Committee referral announced in Parliament, 1st reading/single reading body: EP
  • date: 2005-04-26T00:00:00 type: Vote in committee, 1st reading/single reading body: EP summary: The committee adopted the report by Britta THOMSEN (PES, DK) approving the proposal under the 1st reading of the codecision procedure, subject to just one amendment increasing the overall budget from EUR 531.5 million, as proposed by the Commission, to EUR 538.5 million in order to bring the budget for 2006 closer to the budgeted amount for 2004 (EUR 91 million).
  • date: 2005-04-27T00:00:00 type: Committee report tabled for plenary, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-118&language=EN title: A6-0118/2005
  • date: 2005-05-25T00:00:00 type: Debate in Parliament body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20050525&type=CRE title: Debate in Parliament
  • date: 2005-05-26T00:00:00 type: Results of vote in Parliament body: EP docs: url: https://oeil.secure.europarl.europa.eu/oeil/popups/sda.do?id=4035&l=en title: Results of vote in Parliament
  • date: 2005-05-26T00:00:00 type: Decision by Parliament, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-189 title: T6-0189/2005 summary: The European Parliament adopted a resolution drafted by Britta THOMSEN (PES, DK) and made one amendment to the Commission’s proposal, increasing the overall budget. (Please see the summary of 26/04/2005).
  • date: 2005-07-18T00:00:00 type: Act adopted by Council after Parliament's 1st reading body: EP/CSL
  • date: 2005-09-28T00:00:00 type: Final act signed body: CSL
  • date: 2005-09-28T00:00:00 type: End of procedure in Parliament body: EP
  • date: 2005-11-03T00:00:00 type: Final act published in Official Journal summary: PURPOSE : to prolong the Multiannual programme for enterprise and entrepreneurship and to increase the financial reference amount and to amend Council Decision 2000/819/EC. LEGISLATIVE ACT : Decision 1776/2005/EC of the European Parliament and of the Council amending Council Decision 2000/819/EC on a multiannual programme for enterprise and entrepreneurship, and in particular for small and medium-sized enterprises (SMEs) (2001 to 2005). CONTENT : this Decision aims to ensure the continuity of Community support for enterprise and entrepreneurship, and in particular for small and medium-sized enterprises (SMEs). It extends the period of validity of Decision 2000/819/EC by another year until 31 December 2006 and increase the financial reference amount by EUR 88,5 million. The financial reference amount of EUR 450 million shall be replaced by EUR 538,5 million. docs: title: Decision 2005/1776 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32005D1776 title: OJ L 289 03.11.2005, p. 0014-0014 url: https://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2005:289:SOM:EN:HTML
other
  • body: EC dg: url: http://ec.europa.eu/enterprise/ title: Enterprise and Industry
procedure/dossier_of_the_committee
Old
ITRE/6/25390
New
  • ITRE/6/25390
procedure/final/url
Old
http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32005D1776
New
https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32005D1776
procedure/instrument
Old
Decision
New
  • Decision
  • Amending Decision 2000/819/EC 2000/0107(CNS)
procedure/subject
Old
  • 3.45.02 Small and medium-sized enterprises (SME), craft industries
New
3.45.02
Small and medium-sized enterprises (SME), craft industries
procedure/summary
  • Amending Decision 2000/819/EC
links/European Commission/title
Old
PreLex
New
EUR-Lex
activities/10/docs/1/url
Old
http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2005:289:TOC
New
http://eur-lex.europa.eu/JOHtml.do?uri=OJ:L:2005:289:SOM:EN:HTML
procedure/subject/0
Old
3.45.02 Small and medium-sized enterprises SMEs, craft industries
New
3.45.02 Small and medium-sized enterprises (SME), craft industries
activities
  • date: 2004-12-07T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2004/0781/COM_COM(2004)0781_EN.pdf title: COM(2004)0781 type: Legislative proposal published celexid: CELEX:52004PC0781:EN body: EC type: Legislative proposal published commission: DG: url: http://ec.europa.eu/enterprise/ title: Enterprise and Industry
  • date: 2004-12-14T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: False committee_full: Budgets committee: BUDG body: EP responsible: True committee: ITRE date: 2005-01-27T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: PSE name: THOMSEN Britta
  • date: 2005-04-26T00:00:00 body: EP committees: body: EP responsible: False committee_full: Budgets committee: BUDG body: EP responsible: True committee: ITRE date: 2005-01-27T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: PSE name: THOMSEN Britta type: Vote in committee, 1st reading/single reading
  • date: 2005-04-27T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2005-118&language=EN type: Committee report tabled for plenary, 1st reading/single reading title: A6-0118/2005 body: EP committees: body: EP responsible: False committee_full: Budgets committee: BUDG body: EP responsible: True committee: ITRE date: 2005-01-27T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: PSE name: THOMSEN Britta type: Committee report tabled for plenary, 1st reading/single reading
  • date: 2005-05-25T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20050525&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
  • date: 2005-05-26T00:00:00 docs: url: http://www.europarl.europa.eu/oeil/popups/sda.do?id=4035&l=en type: Results of vote in Parliament title: Results of vote in Parliament url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2005-189 type: Decision by Parliament, 1st reading/single reading title: T6-0189/2005 body: EP type: Results of vote in Parliament
  • date: 2005-07-18T00:00:00 body: CSL type: Council Meeting council: Agriculture and Fisheries meeting_id: 2676
  • date: 2005-07-18T00:00:00 body: EP/CSL type: Act adopted by Council after Parliament's 1st reading
  • date: 2005-09-28T00:00:00 body: CSL type: Final act signed
  • date: 2005-09-28T00:00:00 body: EP type: End of procedure in Parliament
  • date: 2005-11-03T00:00:00 type: Final act published in Official Journal docs: url: http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!CELEXnumdoc&lg=EN&numdoc=32005D1776 title: Decision 2005/1776 url: http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=OJ:L:2005:289:TOC title: OJ L 289 03.11.2005, p. 0014-0014
committees
  • body: EP responsible: False committee_full: Budgets committee: BUDG
  • body: EP responsible: True committee: ITRE date: 2005-01-27T00:00:00 committee_full: Industry, Research and Energy rapporteur: group: PSE name: THOMSEN Britta
links
European Commission
other
  • body: EC dg: url: http://ec.europa.eu/enterprise/ title: Enterprise and Industry
procedure
dossier_of_the_committee
ITRE/6/25390
reference
2004/0272(COD)
subtype
Legislation
legal_basis
EC Treaty (after Amsterdam) EC 157-p3
stage_reached
Procedure completed
summary
Amending Decision 2000/819/EC
instrument
Decision
title
Enterprise policy, SMEs: prolongation of the multiannual programme MAP until 31 December 2006
type
COD - Ordinary legislative procedure (ex-codecision procedure)
final
subject
3.45.02 Small and medium-sized enterprises SMEs, craft industries