BETA


2005/2168(INI) Deployment of the European rail signalling system ERTMS/ETCS

Progress: Procedure completed

RoleCommitteeRapporteurShadows
Lead TRAN CRAMER Michael (icon: Verts/ALE Verts/ALE)
Lead committee dossier:
Legal Basis:
RoP 54

Events

2006/08/01
   EC - Commission response to text adopted in plenary
Documents
2006/07/12
   EC - Commission response to text adopted in plenary
Documents
2006/06/15
   EP - Results of vote in Parliament
2006/06/15
   EP - Decision by Parliament
Details

The European Parliament adopted a resolution by 527 votes in favour 13 against and 8 abstentions, based on the own-initiative report drafted by Michael CRAMER (Greens/EFA, DE) in response to the Commission communication on the deployment of the European rail signalling system ERTMS/ETCS. (Please see the summary of 02/05/2006.)

Documents
2006/06/15
   EP - End of procedure in Parliament
2006/06/14
   EP - Debate in Parliament
2006/05/16
   EP - Committee report tabled for plenary, single reading
Documents
2006/05/16
   EP - Committee report tabled for plenary
Documents
2006/05/02
   EP - Vote in committee
Details

The committee adopted the own-initiative report drawn up by Michael CRAMER (Greens/EFA, DE) in response to the Commission communication on the deployment of the European rail signalling system ERTMS/ETCS. The report said that this was "a major cross-border European economic project" and that progress towards a standard train protection and signalling system could play a central role in the strategy of easing the strain on the roads and shifting transport flows to the railways.

The committee recognised that the ERTMS was superior to national systems in that it would be cheaper as far as new acquisitions and maintenance are concerned, safer at all speeds and very often would enable line capacity to be increased substantially. The technology involved would give the railway industry a "historic opportunity" to exploit digital technology to the full and gain in competitiveness over other modes of transport. MEPs added that it would be "unsatisfactory" for old systems and ERTMS to coexist side by side for decades, and called for the migration stage to be made as short as possible. The Commission was urged to hold consultations with the European Railways Agency (ERA), the Member States and the industry with a view to submitting a binding 'ERTMS master plan' without delay.

On the question of priorities, the report said that, if ERTMS is to succeed, the six corridors dealt with (Rotterdam-Genoa, Naples-Berlin-Stockholm, Antwerp-Basel-Lyon, Seville-Lyon-Turin-Trieste-Ljubljana, Dresden-Prague-Brno-Vienna-Budapest and Duisburg-Berlin-Warsaw) and the trains running on them must be equipped "quickly and completely" with ERTMS and resources should be concentrated on them. MEPs also stressed that no EU support should be granted unless the system was complete when a route was equipped with ERTMS, i.e. it should extend "from platform to platform or freight centre to freight centre as far as the national border or the port served".

On financing, the committee said that it was both "legitimate and necessary" to grant EU funding for the deployment of ERTMS, by using the TEN-transport budget, regional development funds, the Cohesion Fund and appropriations from the EU's research budget. It stressed that the costs should be apportioned fairly among Member States, the EU, railway companies and the rail industry, and urged the Member States to treat ERTMS as a priority in their transport and budget decisions over the next few years. Finally, the report said that the necessary provisions should be incorporated into the proposed regulation laying down the general rules for granting EU aid for the trans-European transport networks.

2006/03/24
   EP - Amendments tabled in committee
Documents
2006/02/07
   EP - Committee draft report
Documents
2005/09/29
   EP - Committee referral announced in Parliament
2005/09/12
   EP - CRAMER Michael (Verts/ALE) appointed as rapporteur in TRAN
2005/07/04
   EC - Non-legislative basic document
Details

PURPOSE: To present a strategy on the deployment of a European rail signalling system ERTMS/ETCS

CONTENT: This Communication examines how to improve the harmonisation of Europe’s rail signalling programme. It focuses, in particular, on the European Rail Traffic Management System (ERTMS), which the Commission compares to other large EU transport ambitions such as Galileo. ERTMS forms an essential component of priority Community rail projects garnering 20% of investment from the trans-European network. Rolling stock equipped with ERTMS could reach EUR 5 billion by 2016.

Safety concerns constitute one of the major forces for introducing harmonised signalling methods. Also at stake is the EU’s economic competitiveness and the need to create an inter-operable rail system allowing for the smooth transport of rail passengers and goods across the EU. Before this ambition can be fully realised a number of obstacles need to be over come. Currently, for example, there are more than twenty different signalling systems coexisting in Europe. Locomotives which cross EU borders have to be equipped with a variety of on-board systems able to process the information transmitted by different track systems. Take, for instance, the Thalys Paris-Brussels-Cologne and Amsterdam runs. The trains operating this route are equipped with seven types of signalling systems with a screen for each signalling system in the driver’s cab. This alone pushes up the cost of each train by 60%.

The ERTMS, which is a direct result of EU RT&D funding, offers a major advance in improving the inter-operability and safety of the EU’s networks. Specifically speaking, the ERTMS is made up of two components. The first is GSM-R, which is a GSM standard using various frequencies unique to rail systems - although it does have other functions. It acts as a radio system used for exchanging voice and data information between the track and the train. The second component is ETCS or the European Train Control System, which transmits permitted speed information to the train divers, as well as constantly monitoring the driver’s compliance with the speed limits. Currently, Member States are busy replacing obsolete radio signalling with the GSM-R systems. Fearing that this may lead to yet another patch-work layer of diverse provisions, the Commission is urging a harmonised Community approach to the implementation of both the GSM-R and ETCS. Not only would harmonised standards bolster safety issues they would also strengthen the EU’s economy in line with the goals set out by the Lisbon agenda. The Communication points out that, although some legislation already exists to apply modern, harmonised technology, the speed with which current legislation will be enacted is too slow. At current rates much of the EU’s rail infrastructure will remain outdated by 2025. The essence, according to the Commission, is to speed up the overall application of ETCS for the sake of passenger safety and for the sake of a competitive European economy. Moreover, with ETCS, it will be possible to provide secondary lines with a signalling system offering a standard of safety at least equivalent to that of the systems currently used on high-speed lines.

In light of the number of obvious advantages associated with GSM-R and ETCS, the Commission is urging a rapid co-ordinated introduction of the new technologies. In order to do so, the Commission has prepared a strategy outlined in a technical annex to the Communication whereby the number of lines equipped with ETCS would be so high that the rest of the EU’s rail infrastructure would have to be equipped with it as well. This strategy would allow for a new European standard that would permit the rail sector to gradually overcome technical barriers, which do not affect its competitors. In concrete terms, the annex show how, according to initial estimates, investments amounting to approximately EUR 5 billion will make it possible to achieve this critical mass by 2016. The Commission will support about 50% of the investments, including those relating to the adaptation of rolling stock. A substantial financial effort will be put into the promotion of inter-operability and the deployment of ETCS in particular.

To conclude, the Commission considers that the rapid and co-ordinated deployment of ERTMS will have a snowball effect and the use of ERTMS will become the rule rather than the exception on the trans-European network. The Commission invites the European Parliament and the Council to support the guidelines contained in this Communication.

2005/07/03
   EC - Non-legislative basic document published
Details

PURPOSE: To present a strategy on the deployment of a European rail signalling system ERTMS/ETCS

CONTENT: This Communication examines how to improve the harmonisation of Europe’s rail signalling programme. It focuses, in particular, on the European Rail Traffic Management System (ERTMS), which the Commission compares to other large EU transport ambitions such as Galileo. ERTMS forms an essential component of priority Community rail projects garnering 20% of investment from the trans-European network. Rolling stock equipped with ERTMS could reach EUR 5 billion by 2016.

Safety concerns constitute one of the major forces for introducing harmonised signalling methods. Also at stake is the EU’s economic competitiveness and the need to create an inter-operable rail system allowing for the smooth transport of rail passengers and goods across the EU. Before this ambition can be fully realised a number of obstacles need to be over come. Currently, for example, there are more than twenty different signalling systems coexisting in Europe. Locomotives which cross EU borders have to be equipped with a variety of on-board systems able to process the information transmitted by different track systems. Take, for instance, the Thalys Paris-Brussels-Cologne and Amsterdam runs. The trains operating this route are equipped with seven types of signalling systems with a screen for each signalling system in the driver’s cab. This alone pushes up the cost of each train by 60%.

The ERTMS, which is a direct result of EU RT&D funding, offers a major advance in improving the inter-operability and safety of the EU’s networks. Specifically speaking, the ERTMS is made up of two components. The first is GSM-R, which is a GSM standard using various frequencies unique to rail systems - although it does have other functions. It acts as a radio system used for exchanging voice and data information between the track and the train. The second component is ETCS or the European Train Control System, which transmits permitted speed information to the train divers, as well as constantly monitoring the driver’s compliance with the speed limits. Currently, Member States are busy replacing obsolete radio signalling with the GSM-R systems. Fearing that this may lead to yet another patch-work layer of diverse provisions, the Commission is urging a harmonised Community approach to the implementation of both the GSM-R and ETCS. Not only would harmonised standards bolster safety issues they would also strengthen the EU’s economy in line with the goals set out by the Lisbon agenda. The Communication points out that, although some legislation already exists to apply modern, harmonised technology, the speed with which current legislation will be enacted is too slow. At current rates much of the EU’s rail infrastructure will remain outdated by 2025. The essence, according to the Commission, is to speed up the overall application of ETCS for the sake of passenger safety and for the sake of a competitive European economy. Moreover, with ETCS, it will be possible to provide secondary lines with a signalling system offering a standard of safety at least equivalent to that of the systems currently used on high-speed lines.

In light of the number of obvious advantages associated with GSM-R and ETCS, the Commission is urging a rapid co-ordinated introduction of the new technologies. In order to do so, the Commission has prepared a strategy outlined in a technical annex to the Communication whereby the number of lines equipped with ETCS would be so high that the rest of the EU’s rail infrastructure would have to be equipped with it as well. This strategy would allow for a new European standard that would permit the rail sector to gradually overcome technical barriers, which do not affect its competitors. In concrete terms, the annex show how, according to initial estimates, investments amounting to approximately EUR 5 billion will make it possible to achieve this critical mass by 2016. The Commission will support about 50% of the investments, including those relating to the adaptation of rolling stock. A substantial financial effort will be put into the promotion of inter-operability and the deployment of ETCS in particular.

To conclude, the Commission considers that the rapid and co-ordinated deployment of ERTMS will have a snowball effect and the use of ERTMS will become the rule rather than the exception on the trans-European network. The Commission invites the European Parliament and the Council to support the guidelines contained in this Communication.

Documents

Activities

Votes

Rapport Cramer A6-0183/2006 - résolution #

2006/06/15 Outcome: +: 527, -: 13, 0: 8
DE FR PL IT ES GB NL CZ BE EL HU AT PT FI SK IE DK SE LV LT SI MT LU EE CY
Total
75
60
48
49
43
54
23
20
19
20
16
16
16
12
12
11
9
11
7
6
5
5
5
4
2
icon: PPE-DE PPE-DE
199
3

Denmark PPE-DE

For (1)

1

Slovenia PPE-DE

2

Malta PPE-DE

2

Luxembourg PPE-DE

3

Estonia PPE-DE

For (1)

1
icon: PSE PSE
146

Czechia PSE

2

Hungary PSE

2

Finland PSE

2

Slovakia PSE

2

Ireland PSE

1

Sweden PSE

2

Lithuania PSE

For (1)

1

Slovenia PSE

For (1)

1

Luxembourg PSE

For (1)

1

Estonia PSE

2
icon: ALDE ALDE
67
2

Austria ALDE

1

Ireland ALDE

For (1)

1

Denmark ALDE

2

Sweden ALDE

For (1)

1

Slovenia ALDE

2

Estonia ALDE

For (1)

1

Cyprus ALDE

For (1)

1
icon: UEN UEN
36

Denmark UEN

For (1)

1

Lithuania UEN

1
icon: Verts/ALE Verts/ALE
35

Italy Verts/ALE

2

Spain Verts/ALE

Against (1)

3

United Kingdom Verts/ALE

Abstain (2)

5

Netherlands Verts/ALE

2

Belgium Verts/ALE

2

Austria Verts/ALE

1

Finland Verts/ALE

For (1)

1

Denmark Verts/ALE

For (1)

1

Sweden Verts/ALE

For (1)

1

Latvia Verts/ALE

1

Luxembourg Verts/ALE

For (1)

1
icon: GUE/NGL GUE/NGL
27

France GUE/NGL

For (1)

1

Spain GUE/NGL

For (1)

1

United Kingdom GUE/NGL

1

Netherlands GUE/NGL

2

Portugal GUE/NGL

For (1)

Abstain (1)

2

Finland GUE/NGL

For (1)

1

Sweden GUE/NGL

For (1)

1

Cyprus GUE/NGL

1
icon: ITS ITS
12
2

United Kingdom ITS

Against (1)

1

Austria ITS

For (1)

1
icon: NI NI
10

United Kingdom NI

For (1)

Abstain (1)

2

Czechia NI

1

Austria NI

1

Slovakia NI

2
icon: IND/DEM IND/DEM
16

Poland IND/DEM

2

United Kingdom IND/DEM

5

Netherlands IND/DEM

2

Greece IND/DEM

1

Ireland IND/DEM

For (1)

1

Sweden IND/DEM

For (1)

Against (1)

2

History

(these mark the time of scraping, not the official date of the change)

docs/0
date
2005-07-04T00:00:00
docs
summary
type
Non-legislative basic document
body
EC
docs/3
date
2006-07-12T00:00:00
docs
url: /oeil/spdoc.do?i=4704&j=0&l=en title: SP(2006)3310
type
Commission response to text adopted in plenary
body
EC
docs/4
date
2006-07-12T00:00:00
docs
url: /oeil/spdoc.do?i=4704&j=0&l=en title: SP(2006)3310
type
Commission response to text adopted in plenary
body
EC
docs/4
date
2006-08-01T00:00:00
docs
url: /oeil/spdoc.do?i=4704&j=1&l=en title: SP(2006)3311
type
Commission response to text adopted in plenary
body
EC
docs/4/docs/0/url
Old
/oeil/spdoc.do?i=4704&j=0&l=en
New
/oeil/spdoc.do?i=4704&j=1&l=en
docs/5
date
2006-08-01T00:00:00
docs
url: /oeil/spdoc.do?i=4704&j=1&l=en title: SP(2006)3311
type
Commission response to text adopted in plenary
body
EC
docs/5/docs/0/url
Old
/oeil/spdoc.do?i=4704&j=1&l=en
New
/oeil/spdoc.do?i=4704&j=0&l=en
events/0/date
Old
2005-07-04T00:00:00
New
2005-07-03T00:00:00
docs/0/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE367.978
New
https://www.europarl.europa.eu/doceo/document/EN&reference=PE367.978
docs/1/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE370.141
New
https://www.europarl.europa.eu/doceo/document/EN&reference=PE370.141
docs/2/docs/0/url
Old
http://www.europarl.europa.eu/doceo/document/A-6-2006-0183_EN.html
New
https://www.europarl.europa.eu/doceo/document/A-6-2006-0183_EN.html
events/0/docs/0/url
Old
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2005/0298/COM_COM(2005)0298_EN.pdf
New
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2005/0298/COM_COM(2005)0298_EN.pdf
events/1/type
Old
Committee referral announced in Parliament, 1st reading/single reading
New
Committee referral announced in Parliament
events/2/type
Old
Vote in committee, 1st reading/single reading
New
Vote in committee
events/3
date
2006-05-16T00:00:00
type
Committee report tabled for plenary
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/A-6-2006-0183_EN.html title: A6-0183/2006
events/3
date
2006-05-16T00:00:00
type
Committee report tabled for plenary, single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/A-6-2006-0183_EN.html title: A6-0183/2006
events/4/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20060614&type=CRE
New
https://www.europarl.europa.eu/doceo/document/EN&reference=20060614&type=CRE
events/6
date
2006-06-15T00:00:00
type
Decision by Parliament
body
EP
docs
url: https://www.europarl.europa.eu/doceo/document/TA-6-2006-0275_EN.html title: T6-0275/2006
summary
The European Parliament adopted a resolution by 527 votes in favour 13 against and 8 abstentions, based on the own-initiative report drafted by Michael CRAMER (Greens/EFA, DE) in response to the Commission communication on the deployment of the European rail signalling system ERTMS/ETCS. (Please see the summary of 02/05/2006.)
events/6
date
2006-06-15T00:00:00
type
Decision by Parliament, 1st reading/single reading
body
EP
docs
url: http://www.europarl.europa.eu/doceo/document/TA-6-2006-0275_EN.html title: T6-0275/2006
summary
The European Parliament adopted a resolution by 527 votes in favour 13 against and 8 abstentions, based on the own-initiative report drafted by Michael CRAMER (Greens/EFA, DE) in response to the Commission communication on the deployment of the European rail signalling system ERTMS/ETCS. (Please see the summary of 02/05/2006.)
procedure/legal_basis/0
Rules of Procedure EP 54
procedure/legal_basis/0
Rules of Procedure EP 052
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Transport and Tourism
committee
TRAN
rapporteur
name: CRAMER Michael date: 2005-09-12T00:00:00 group: Greens/European Free Alliance abbr: Verts/ALE
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Transport and Tourism
committee
TRAN
date
2005-09-12T00:00:00
rapporteur
name: CRAMER Michael group: Greens/European Free Alliance abbr: Verts/ALE
docs/2/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2006-183&language=EN
New
http://www.europarl.europa.eu/doceo/document/A-6-2006-0183_EN.html
docs/3/body
EC
docs/4/body
EC
events/0/docs/0/url
Old
http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2005/0298/COM_COM(2005)0298_EN.pdf
New
http://www.europarl.europa.eu/RegData/docs_autres_institutions/commission_europeenne/com/2005/0298/COM_COM(2005)0298_EN.pdf
events/3/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2006-183&language=EN
New
http://www.europarl.europa.eu/doceo/document/A-6-2006-0183_EN.html
events/6/docs/0/url
Old
http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2006-275
New
http://www.europarl.europa.eu/doceo/document/TA-6-2006-0275_EN.html
activities
  • date: 2005-07-04T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2005/0298/COM_COM(2005)0298_EN.pdf title: COM(2005)0298 type: Non-legislative basic document published celexid: CELEX:52005DC0298:EN body: EC commission: DG: Energy and Transport type: Non-legislative basic document published
  • date: 2005-09-29T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: True committee: TRAN date: 2005-09-12T00:00:00 committee_full: Transport and Tourism rapporteur: group: Verts/ALE name: CRAMER Michael
  • date: 2006-05-02T00:00:00 body: EP committees: body: EP responsible: True committee: TRAN date: 2005-09-12T00:00:00 committee_full: Transport and Tourism rapporteur: group: Verts/ALE name: CRAMER Michael type: Vote in committee, 1st reading/single reading
  • date: 2006-05-16T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2006-183&language=EN type: Committee report tabled for plenary, single reading title: A6-0183/2006 body: EP type: Committee report tabled for plenary, single reading
  • date: 2006-06-14T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20060614&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
  • date: 2006-06-15T00:00:00 docs: url: http://www.europarl.europa.eu/oeil/popups/sda.do?id=4704&l=en type: Results of vote in Parliament title: Results of vote in Parliament url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2006-275 type: Decision by Parliament, 1st reading/single reading title: T6-0275/2006 body: EP type: Results of vote in Parliament
commission
  • body: EC dg: Energy and Transport commissioner: --
committees/0
type
Responsible Committee
body
EP
associated
False
committee_full
Transport and Tourism
committee
TRAN
date
2005-09-12T00:00:00
rapporteur
name: CRAMER Michael group: Greens/European Free Alliance abbr: Verts/ALE
committees/0
body
EP
responsible
True
committee
TRAN
date
2005-09-12T00:00:00
committee_full
Transport and Tourism
rapporteur
group: Verts/ALE name: CRAMER Michael
docs
  • date: 2006-02-07T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE367.978 title: PE367.978 type: Committee draft report body: EP
  • date: 2006-03-24T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE370.141 title: PE370.141 type: Amendments tabled in committee body: EP
  • date: 2006-05-16T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2006-183&language=EN title: A6-0183/2006 type: Committee report tabled for plenary, single reading body: EP
  • date: 2006-07-12T00:00:00 docs: url: /oeil/spdoc.do?i=4704&j=0&l=en title: SP(2006)3310 type: Commission response to text adopted in plenary
  • date: 2006-08-01T00:00:00 docs: url: /oeil/spdoc.do?i=4704&j=1&l=en title: SP(2006)3311 type: Commission response to text adopted in plenary
events
  • date: 2005-07-04T00:00:00 type: Non-legislative basic document published body: EC docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2005/0298/COM_COM(2005)0298_EN.pdf title: COM(2005)0298 url: https://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2005&nu_doc=298 title: EUR-Lex summary: PURPOSE: To present a strategy on the deployment of a European rail signalling system ERTMS/ETCS CONTENT: This Communication examines how to improve the harmonisation of Europe’s rail signalling programme. It focuses, in particular, on the European Rail Traffic Management System (ERTMS), which the Commission compares to other large EU transport ambitions such as Galileo. ERTMS forms an essential component of priority Community rail projects garnering 20% of investment from the trans-European network. Rolling stock equipped with ERTMS could reach EUR 5 billion by 2016. Safety concerns constitute one of the major forces for introducing harmonised signalling methods. Also at stake is the EU’s economic competitiveness and the need to create an inter-operable rail system allowing for the smooth transport of rail passengers and goods across the EU. Before this ambition can be fully realised a number of obstacles need to be over come. Currently, for example, there are more than twenty different signalling systems coexisting in Europe. Locomotives which cross EU borders have to be equipped with a variety of on-board systems able to process the information transmitted by different track systems. Take, for instance, the Thalys Paris-Brussels-Cologne and Amsterdam runs. The trains operating this route are equipped with seven types of signalling systems with a screen for each signalling system in the driver’s cab. This alone pushes up the cost of each train by 60%. The ERTMS, which is a direct result of EU RT&D funding, offers a major advance in improving the inter-operability and safety of the EU’s networks. Specifically speaking, the ERTMS is made up of two components. The first is GSM-R, which is a GSM standard using various frequencies unique to rail systems - although it does have other functions. It acts as a radio system used for exchanging voice and data information between the track and the train. The second component is ETCS or the European Train Control System, which transmits permitted speed information to the train divers, as well as constantly monitoring the driver’s compliance with the speed limits. Currently, Member States are busy replacing obsolete radio signalling with the GSM-R systems. Fearing that this may lead to yet another patch-work layer of diverse provisions, the Commission is urging a harmonised Community approach to the implementation of both the GSM-R and ETCS. Not only would harmonised standards bolster safety issues they would also strengthen the EU’s economy in line with the goals set out by the Lisbon agenda. The Communication points out that, although some legislation already exists to apply modern, harmonised technology, the speed with which current legislation will be enacted is too slow. At current rates much of the EU’s rail infrastructure will remain outdated by 2025. The essence, according to the Commission, is to speed up the overall application of ETCS for the sake of passenger safety and for the sake of a competitive European economy. Moreover, with ETCS, it will be possible to provide secondary lines with a signalling system offering a standard of safety at least equivalent to that of the systems currently used on high-speed lines. In light of the number of obvious advantages associated with GSM-R and ETCS, the Commission is urging a rapid co-ordinated introduction of the new technologies. In order to do so, the Commission has prepared a strategy outlined in a technical annex to the Communication whereby the number of lines equipped with ETCS would be so high that the rest of the EU’s rail infrastructure would have to be equipped with it as well. This strategy would allow for a new European standard that would permit the rail sector to gradually overcome technical barriers, which do not affect its competitors. In concrete terms, the annex show how, according to initial estimates, investments amounting to approximately EUR 5 billion will make it possible to achieve this critical mass by 2016. The Commission will support about 50% of the investments, including those relating to the adaptation of rolling stock. A substantial financial effort will be put into the promotion of inter-operability and the deployment of ETCS in particular. To conclude, the Commission considers that the rapid and co-ordinated deployment of ERTMS will have a snowball effect and the use of ERTMS will become the rule rather than the exception on the trans-European network. The Commission invites the European Parliament and the Council to support the guidelines contained in this Communication.
  • date: 2005-09-29T00:00:00 type: Committee referral announced in Parliament, 1st reading/single reading body: EP
  • date: 2006-05-02T00:00:00 type: Vote in committee, 1st reading/single reading body: EP summary: The committee adopted the own-initiative report drawn up by Michael CRAMER (Greens/EFA, DE) in response to the Commission communication on the deployment of the European rail signalling system ERTMS/ETCS. The report said that this was "a major cross-border European economic project" and that progress towards a standard train protection and signalling system could play a central role in the strategy of easing the strain on the roads and shifting transport flows to the railways. The committee recognised that the ERTMS was superior to national systems in that it would be cheaper as far as new acquisitions and maintenance are concerned, safer at all speeds and very often would enable line capacity to be increased substantially. The technology involved would give the railway industry a "historic opportunity" to exploit digital technology to the full and gain in competitiveness over other modes of transport. MEPs added that it would be "unsatisfactory" for old systems and ERTMS to coexist side by side for decades, and called for the migration stage to be made as short as possible. The Commission was urged to hold consultations with the European Railways Agency (ERA), the Member States and the industry with a view to submitting a binding 'ERTMS master plan' without delay. On the question of priorities, the report said that, if ERTMS is to succeed, the six corridors dealt with (Rotterdam-Genoa, Naples-Berlin-Stockholm, Antwerp-Basel-Lyon, Seville-Lyon-Turin-Trieste-Ljubljana, Dresden-Prague-Brno-Vienna-Budapest and Duisburg-Berlin-Warsaw) and the trains running on them must be equipped "quickly and completely" with ERTMS and resources should be concentrated on them. MEPs also stressed that no EU support should be granted unless the system was complete when a route was equipped with ERTMS, i.e. it should extend "from platform to platform or freight centre to freight centre as far as the national border or the port served". On financing, the committee said that it was both "legitimate and necessary" to grant EU funding for the deployment of ERTMS, by using the TEN-transport budget, regional development funds, the Cohesion Fund and appropriations from the EU's research budget. It stressed that the costs should be apportioned fairly among Member States, the EU, railway companies and the rail industry, and urged the Member States to treat ERTMS as a priority in their transport and budget decisions over the next few years. Finally, the report said that the necessary provisions should be incorporated into the proposed regulation laying down the general rules for granting EU aid for the trans-European transport networks.
  • date: 2006-05-16T00:00:00 type: Committee report tabled for plenary, single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2006-183&language=EN title: A6-0183/2006
  • date: 2006-06-14T00:00:00 type: Debate in Parliament body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20060614&type=CRE title: Debate in Parliament
  • date: 2006-06-15T00:00:00 type: Results of vote in Parliament body: EP docs: url: https://oeil.secure.europarl.europa.eu/oeil/popups/sda.do?id=4704&l=en title: Results of vote in Parliament
  • date: 2006-06-15T00:00:00 type: Decision by Parliament, 1st reading/single reading body: EP docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2006-275 title: T6-0275/2006 summary: The European Parliament adopted a resolution by 527 votes in favour 13 against and 8 abstentions, based on the own-initiative report drafted by Michael CRAMER (Greens/EFA, DE) in response to the Commission communication on the deployment of the European rail signalling system ERTMS/ETCS. (Please see the summary of 02/05/2006.)
  • date: 2006-06-15T00:00:00 type: End of procedure in Parliament body: EP
links
other
  • body: EC dg: Energy and Transport
procedure/dossier_of_the_committee
Old
TRAN/6/30189
New
  • TRAN/6/30189
procedure/legal_basis/0
Rules of Procedure EP 052
procedure/legal_basis/0
Rules of Procedure of the European Parliament EP 052
procedure/subject
Old
  • 3.20.02 Rail transport: passengers and freight
New
3.20.02
Rail transport: passengers and freight
procedure/title
Old
The deployment of the European rail signalling system ERTMS/ETCS
New
Deployment of the European rail signalling system ERTMS/ETCS
activities
  • date: 2005-07-04T00:00:00 docs: url: http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/com/2005/0298/COM_COM(2005)0298_EN.pdf title: COM(2005)0298 type: Non-legislative basic document published celexid: CELEX:52005DC0298:EN body: EC commission: DG: Energy and Transport type: Non-legislative basic document published
  • date: 2005-09-29T00:00:00 body: EP type: Committee referral announced in Parliament, 1st reading/single reading committees: body: EP responsible: True committee: TRAN date: 2005-09-12T00:00:00 committee_full: Transport and Tourism rapporteur: group: Verts/ALE name: CRAMER Michael
  • date: 2006-05-02T00:00:00 body: EP committees: body: EP responsible: True committee: TRAN date: 2005-09-12T00:00:00 committee_full: Transport and Tourism rapporteur: group: Verts/ALE name: CRAMER Michael type: Vote in committee, 1st reading/single reading
  • date: 2006-05-16T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A6-2006-183&language=EN type: Committee report tabled for plenary, single reading title: A6-0183/2006 body: EP type: Committee report tabled for plenary, single reading
  • date: 2006-06-14T00:00:00 docs: url: http://www.europarl.europa.eu/sides/getDoc.do?secondRef=TOC&language=EN&reference=20060614&type=CRE type: Debate in Parliament title: Debate in Parliament body: EP type: Debate in Parliament
  • date: 2006-06-15T00:00:00 docs: url: http://www.europarl.europa.eu/oeil/popups/sda.do?id=4704&l=en type: Results of vote in Parliament title: Results of vote in Parliament url: http://www.europarl.europa.eu/sides/getDoc.do?type=TA&language=EN&reference=P6-TA-2006-275 type: Decision by Parliament, 1st reading/single reading title: T6-0275/2006 body: EP type: Results of vote in Parliament
committees
  • body: EP responsible: True committee: TRAN date: 2005-09-12T00:00:00 committee_full: Transport and Tourism rapporteur: group: Verts/ALE name: CRAMER Michael
links
other
  • body: EC dg: Energy and Transport
procedure
dossier_of_the_committee
TRAN/6/30189
reference
2005/2168(INI)
title
The deployment of the European rail signalling system ERTMS/ETCS
legal_basis
Rules of Procedure of the European Parliament EP 052
stage_reached
Procedure completed
subtype
Initiative
type
INI - Own-initiative procedure
subject
3.20.02 Rail transport: passengers and freight