8 Amendments of Henna VIRKKUNEN related to 2016/0381(COD)
Amendment 134 #
Proposal for a directive
Recital 10 a (new)
Recital 10 a (new)
(10a) A clear vision for a decarbonised building stock by 2050 requires high ambition level. When the energy use will be brought closer to zero the share of embodied energy will be more decisive in the whole life-cycle of the buildings. The future vision for a decarbonised building stock should include the embodied energy in buildings. Therefore building with wood is positive for the climate.
Amendment 153 #
Proposal for a directive
Recital 12
Recital 12
(12) Notably for large installations,Skilled facility management, and building automation and electronic monitoring of technical building systems have proven to be an effective replacement for inspections. The installation of such equipment should be considered as the most cost-effective alternative to inspections in large non-residential and multifamily buildings of a sufficient size that allow a payback of less than three years. The current possibility to opt for alternative measures is therefore deleted. For small scale installations, the documentation of the system performance by installers and the registration of this information in the databases on energy performance certification will support the verification of compliance with the minimum requirements set for all technical building systems and reinforce energy performance certificates role. In addition, existing regular safety inspections and programmed maintenance work will remain an opportunity to provide direct advice on energy efficiency improvements.
Amendment 360 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point b
Article 1 – paragraph 1 – point 5 – point b
Directive 2010/31/EU
Article 8 – paragraph 2 – subparagraph 1
Article 8 – paragraph 2 – subparagraph 1
‘2. Member States shall ensure that in all new non-residential buildings and in all existing non-residential buildings undergoing major renovation related to the electrical infrastructure of the building or the parking lot with more than ten parking spaces, at least one of every ten is equipped with adequate pre-cabling or pre-tubing, in order to enable installation of a recharging point within the meaning of Directive 2014/94/EU on the deployment of alternative fuels infrastructure17 , which is capable of starting and stopping charging in reaction to price signals. This requirement shall apply to all non- residential buildings, with more than ten parking spaces, as of 1 January 2025. __________________ 17__________________ 17 OJ L 307, 28.10.2014, p. 1 OJ L 307, 28.10.2014, p. 1
Amendment 376 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point b
Article 1 – paragraph 1 – point 5 – point b
Directive 2010/31/EU
Article 8 – paragraph 3
Article 8 – paragraph 3
3. Member States shall ensure that newly built residential buildings and those undergoing major renovations related to the electrical infrastructure of the building or the adjacent or built-in parking lot, with more than ten parking spaces, include the adequate pre- cabling or pre-tubing to enable the installation of recharging points for electric vehicles for every p. Residents in residential buildings shall have the right to install a recharkging spacepoint to their building.
Amendment 416 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point c
Article 1 – paragraph 1 – point 5 – point c
Directive 2010/31/EU
Article 8 – paragraph 5
Article 8 – paragraph 5
5. Member States shall ensure that, when a technical building system is installed, replaced or upgraded, the overall energy performance of the complete altered system is assessed, documented it and passed on to the building owner, so that it remains available for the verification of compliance with the minimum requirements set pursuant to paragraph 1 and the issue of energy performance certificates. Member States shall ensure that this information is included in the national energy performance certificate database referred to in Article 18(3) when the energy certificate is issued.
Amendment 435 #
Proposal for a directive
Article 1 – paragraph 1 – point 5 – point c
Article 1 – paragraph 1 – point 5 – point c
Directive 2010/31/EU
Article 8 – paragraph 6 – subparagraph 1
Article 8 – paragraph 6 – subparagraph 1
The Commission is empowered to adopt delegated acts in accordance with Article 23 supplementing this Directive with a definition of voluntary ‘smartness indicator’ and with the conditions under which the ‘smartness indicator’ would be provided as a voluntary additional information to prospective new tenants or buyers.
Amendment 495 #
Proposal for a directive
Article 1 – paragraph 1 – point 7 – point a
Article 1 – paragraph 1 – point 7 – point a
Directive 2010/31/EU
Article 14 – paragraph 1
Article 14 – paragraph 1
‘1. Member States shall lay down the necessary measures to establish a regular inspection of the accessible parts of systems used for heating buildings, such as the heat generator, control system and circulation pump(s) for non-residential buildings with total primary energy use of over 250MWh and for residential buildings with a centralised technical buildspace heating system of a cumulated effective rated output of over 100 kW. That inspection shall include an assessment of the boiler efficiency and the boiler sizing compared with the heating requirements of the building. The assessment of the boiler sizing does not have to be repeated as long as no changes were made to the heating system or as regards the heating requirements of the building in the meantime.’;
Amendment 537 #
Proposal for a directive
Article 1 – paragraph 1 – point 8 – point a
Article 1 – paragraph 1 – point 8 – point a
Directive 2010/31/EU
Article 15 – paragraph 1
Article 15 – paragraph 1
1. Member States shall lay down the necessary measures to establish a regular inspection of the accessible parts of air- conditioning systems for non-residential buildings with total primary energy use of over 250MWh and for residential buildings with a centralised technical buildcooling system of a cumulated effective rated output of over 100 kW. The inspection shall include an assessment of the air- conditioning efficiency and the sizing compared to the cooling requirements of the building. The assessment of the sizing does not have to be repeated as long as no changes were made to this air-conditioning system or as regards the cooling requirements of the building in the meantime.;